Construction Impact

Track active roadwork that affects bike paths and likely impact on bike traffic.

Source: Ville de Montreal - active construction permits with bike path impacts, updated daily.Snapshot date:Apr 6, 2026

Total Affected

94

Distinct construction zones impacting a bike path

Bike Paths Blocked

45

Fully closed to cyclists - requires detour

Bike Paths Obstructed

49

Partially obstructed - reduced width or shared lane

Status
AllBlockedObstructed
Borough
Reason
Duration
All0-2 days3-14 days15-60 days61-180 days180+ days

Active Bike Path Blockages(94)

Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.

StreetBoroughStatusReasonDurationNearest CounterVolume Impact
Villeray-Saint-Michel-Parc-ExtensionBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

Feb 8, 2026 → Apr 10, 2026

61-180 days

~1,407 m

Insufficient data

Ville-MarieBlockedAS-2 Réseau aérosouterrain existant

Jun 16, 2025 → Apr 10, 2026

180+ days

~86 m

-33.1% vs before

Likely decrease

Avg. before construction: 1,100 (28 days of data)

Avg. during construction: 737 (258 days of data)

Ahuntsic-CartiervilleBlockedAutre

Mar 8, 2026 → Apr 17, 2026

15-60 days

~175 m

Insufficient data

Avg. before construction: 0 (21 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Apr 6, 2026 → May 14, 2026

15-60 days

~1,292 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Mar 29, 2026 → Jun 1, 2026

61-180 days

~675 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Mar 31, 2026 → Jun 12, 2026

61-180 days

~1,557 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedConstruction/rénovation avec excavation

May 3, 2022 → Jun 30, 2026

180+ days

~698 m

+47.4% vs before

Likely increase

Avg. before construction: 1,081 (28 days of data)

Avg. during construction: 1,594 (1,385 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~71 m

Insufficient data

Avg. before construction: 202 (7 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~79 m

Insufficient data

Avg. before construction: 202 (7 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Mar 29, 2026 → Oct 30, 2026

180+ days

~668 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 6, 2026 → Oct 30, 2026

180+ days

~464 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Mar 8, 2026 → Oct 31, 2026

180+ days

~47 m

Insufficient data

Avg. before construction: 150 (21 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Feb 10, 2026 → Jul 17, 2026

61-180 days

~515 m

+23.8% vs before

Likely increase

Avg. before construction: 87 (28 days of data)

Avg. during construction: 108 (19 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Jan 12, 2025 → Aug 29, 2026

180+ days

~734 m

+569% vs before

Likely increase

Avg. before construction: 253 (28 days of data)

Avg. during construction: 1,695 (413 days of data)

Ville-MarieBlockedAS-2 Réseau aérosouterrain existant

Jun 16, 2025 → Apr 10, 2026

180+ days

~141 m

-33.1% vs before

Likely decrease

Avg. before construction: 1,100 (28 days of data)

Avg. during construction: 737 (258 days of data)

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Jan 12, 2026 → Apr 11, 2026

61-180 days

~1,203 m

+6.7% vs before

Likely stable

Avg. before construction: 37 (28 days of data)

Avg. during construction: 39 (30 days of data)

Ahuntsic-CartiervilleBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

Mar 29, 2026 → Apr 19, 2026

15-60 days

~918 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Mar 17, 2026 → Apr 30, 2026

15-60 days

~1,225 m

Insufficient data

Avg. before construction: 1 (12 days of data)

Ville-MarieBlockedConstruction/rénovation sans excavation

Apr 6, 2026 → Apr 10, 2026

3-14 days

~503 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Feb 28, 2026 → May 31, 2026

61-180 days

~556 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~92 m

Insufficient data

Avg. before construction: 202 (7 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedConstruction/rénovation sans excavation

Apr 6, 2026 → Apr 10, 2026

3-14 days

~205 m

Insufficient data

Pierrefonds-RoxboroBlockedÉgouts et aqueducs - Excavation

Apr 6, 2026 → Apr 10, 2026

3-14 days

~1,119 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Inspection et nettoyage

Apr 5, 2026 → Apr 10, 2026

3-14 days

~2,187 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedConstruction/rénovation sans excavation

Mar 31, 2026 → Apr 30, 2026

15-60 days

~211 m

Insufficient data

Le Sud-OuestBlockedEntretien

Apr 6, 2026 → Apr 7, 2026

0-2 days

~976 m

Insufficient data

Rosemont-La Petite-PatrieBlockedEntretien

Apr 7, 2026 → Apr 8, 2026

0-2 days

~833 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ville-MarieBlockedEntretien

Apr 6, 2026 → Apr 8, 2026

0-2 days

~544 m

Insufficient data

Rosemont-La Petite-PatrieBlockedEntretien

Apr 7, 2026 → Apr 9, 2026

0-2 days

~458 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Mar 29, 2026 → Jun 1, 2026

61-180 days

~675 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedA-1 Réseau aérien existant

Apr 6, 2026 → Apr 7, 2026

0-2 days

~3,113 m

Insufficient data

VerdunBlockedForage/excavation exploratoire

Mar 25, 2026 → Apr 20, 2026

15-60 days

~622 m

Insufficient data

Avg. before construction: 41 (4 days of data)

Le Plateau-Mont-RoyalBlockedAutre

Mar 22, 2026 → May 18, 2026

15-60 days

~229 m

Insufficient data

LaSalleBlockedConstruction/rénovation avec excavation

Mar 19, 2026 → Apr 20, 2026

15-60 days

~5,725 m

Insufficient data

Avg. before construction: 135 (10 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedConstruction/rénovation sans excavation

Nov 29, 2022 → Jun 30, 2026

180+ days

~724 m

+23.1% vs before

Likely increase

Avg. before construction: 1,238 (28 days of data)

Avg. during construction: 1,524 (1,175 days of data)

Mercier-Hochelaga-MaisonneuveBlockedEntretien

Apr 6, 2026 → Apr 7, 2026

0-2 days

~1,192 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedEntretien

Apr 6, 2026 → Apr 7, 2026

0-2 days

~2,895 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedÉgouts et aqueducs - Inspection et nettoyage

Mar 29, 2026 → Apr 9, 2026

3-14 days

~1,216 m

Insufficient data

Rosemont-La Petite-PatrieBlockedÉgouts et aqueducs - Excavation

Mar 31, 2026 → Apr 9, 2026

3-14 days

~1,790 m

Insufficient data

OutremontBlockedConstruction/rénovation sans excavation

Mar 25, 2026 → Jul 18, 2026

61-180 days

~1,189 m

Insufficient data

Avg. before construction: 273 (4 days of data)

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation avec excavation

Mar 1, 2026 → May 6, 2026

61-180 days

~677 m

Insufficient data

Avg. before construction: 38 (28 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Apr 6, 2026 → Apr 7, 2026

0-2 days

~542 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Apr 7, 2026 → Apr 8, 2026

0-2 days

~544 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation avec excavation

Apr 6, 2026 → Jun 12, 2026

61-180 days

~690 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedEntretien

Apr 6, 2026 → Apr 8, 2026

0-2 days

~2,735 m

Insufficient data

Le Sud-OuestObstructedAutre

Mar 29, 2026 → Apr 10, 2026

3-14 days

~830 m

Insufficient data

Le Plateau-Mont-RoyalObstructedS-3 Infrastructure souterraine majeure - Puits d'accès

Apr 6, 2026 → May 22, 2026

15-60 days

~425 m

Insufficient data

Montréal-NordObstructedConstruction/rénovation sans excavation

Mar 31, 2026 → Oct 30, 2026

180+ days

~2,784 m

Insufficient data

Le Sud-OuestObstructedAutre

Mar 29, 2026 → Apr 24, 2026

15-60 days

~965 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedAutre

Mar 31, 2026 → May 29, 2026

15-60 days

~1,627 m

Insufficient data

Ahuntsic-CartiervilleObstructedConstruction/rénovation avec excavation

Mar 15, 2026 → Apr 10, 2026

15-60 days

~720 m

Insufficient data

Avg. before construction: 25 (14 days of data)

AnjouObstructedAutre

Jan 10, 2026 → Apr 11, 2026

61-180 days

~3,171 m

+9.9% vs before

Likely increase

Avg. before construction: 34 (28 days of data)

Avg. during construction: 37 (50 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedAutre

Mar 31, 2026 → May 29, 2026

15-60 days

~1,627 m

Insufficient data

Montréal-NordObstructedConstruction/rénovation avec excavation

Apr 6, 2026 → May 31, 2026

15-60 days

~918 m

Insufficient data

AnjouObstructedAutre

Apr 5, 2026 → Apr 10, 2026

3-14 days

~3,036 m

Insufficient data

Le Sud-OuestObstructedAutre

Feb 22, 2026 → Apr 13, 2026

15-60 days

~1,497 m

Insufficient data

Avg. before construction: 49 (17 days of data)

Le Plateau-Mont-RoyalObstructedS-3 Infrastructure souterraine majeure - Puits d'accès

Apr 6, 2026 → May 22, 2026

15-60 days

~425 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedConstruction/rénovation sans excavation

May 27, 2025 → Sep 30, 2026

180+ days

~692 m

-10.9% vs before

Likely decrease

Avg. before construction: 1,279 (28 days of data)

Avg. during construction: 1,140 (278 days of data)

Ville-MarieObstructedEntretien

Apr 6, 2026 → Apr 8, 2026

0-2 days

~490 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation sans excavation

Apr 1, 2026 → Apr 8, 2026

3-14 days

~546 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz

Apr 6, 2026 → Apr 10, 2026

3-14 days

~651 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Apr 5, 2026 → Apr 6, 2026

0-2 days

~456 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Apr 6, 2026 → Apr 7, 2026

0-2 days

~505 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Apr 6, 2026 → Apr 7, 2026

0-2 days

~453 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Apr 7, 2026 → Apr 8, 2026

0-2 days

~442 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedForage/excavation exploratoire

Mar 25, 2026 → Apr 10, 2026

15-60 days

~2,657 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedForage/excavation exploratoire

Mar 25, 2026 → Apr 10, 2026

15-60 days

~2,524 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Mar 31, 2026 → Apr 10, 2026

3-14 days

~3,815 m

Insufficient data

Le Sud-OuestObstructedForage/excavation exploratoire

Mar 25, 2026 → Apr 10, 2026

15-60 days

~1,000 m

Insufficient data

Avg. before construction: 175 (4 days of data)

St-LaurentObstructedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz

Apr 6, 2026 → Apr 14, 2026

3-14 days

~353 m

Insufficient data

Ville-MarieObstructedÉgouts et aqueducs - Excavation

Apr 3, 2026 → Apr 5, 2026

0-2 days

~344 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedEntretien

Apr 6, 2026 → Apr 7, 2026

0-2 days

~3,131 m

Insufficient data

St-LaurentObstructedAutre

Apr 7, 2026 → Apr 8, 2026

0-2 days

~4,190 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Pierrefonds-RoxboroObstructedForage/excavation exploratoire

Apr 5, 2026 → Apr 24, 2026

15-60 days

~6,397 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedEntretien

Apr 6, 2026 → Apr 7, 2026

0-2 days

~3,201 m

Insufficient data

Rosemont-La Petite-PatrieObstructedToiture - Rénovation

Apr 6, 2026 → Apr 7, 2026

0-2 days

~942 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation sans excavation

Mar 31, 2026 → Apr 10, 2026

3-14 days

~1,675 m

Insufficient data

Ville-MarieObstructedAutre

Apr 6, 2026 → Apr 10, 2026

3-14 days

~596 m

Insufficient data

Le Sud-OuestObstructedAutre

Mar 29, 2026 → Apr 10, 2026

3-14 days

~830 m

Insufficient data

Pierrefonds-RoxboroObstructedForage/excavation exploratoire

Apr 5, 2026 → Apr 17, 2026

3-14 days

~6,269 m

Insufficient data

Ville-MarieObstructedConstruction/rénovation sans excavation

Jan 27, 2026 → Apr 30, 2026

61-180 days

~63 m

Insufficient data

Avg. during construction: 188 (28 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Mar 10, 2026 → Sep 1, 2026

61-180 days

~2,407 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Apr 1, 2026 → Oct 2, 2026

180+ days

~3,647 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedEntretien

Apr 7, 2026 → Apr 8, 2026

0-2 days

~643 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Villeray-Saint-Michel-Parc-ExtensionObstructedConstruction/rénovation sans excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~96 m

Insufficient data

Avg. before construction: 202 (7 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedÉgouts et aqueducs - Réhabilitation

Mar 29, 2026 → Apr 10, 2026

3-14 days

~2,518 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedConstruction/rénovation sans excavation

Apr 6, 2026 → Apr 7, 2026

0-2 days

~141 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedAutre

Dec 4, 2025 → Apr 30, 2026

61-180 days

~1,232 m

-73.6% vs before

Likely decrease

Avg. before construction: 456 (28 days of data)

Avg. during construction: 121 (87 days of data)

Le Sud-OuestObstructedAutre

Mar 3, 2024 → Dec 23, 2026

180+ days

~661 m

+410.4% vs before

Likely increase

Avg. before construction: 257 (28 days of data)

Avg. during construction: 1,314 (728 days of data)

Le Plateau-Mont-RoyalObstructedAutre

Apr 6, 2026 → Apr 14, 2026

3-14 days

~181 m

Insufficient data

Le Sud-OuestObstructedConstruction/rénovation avec excavation

Feb 9, 2026 → Apr 15, 2026

61-180 days

~1,101 m

+18.5% vs before

Likely increase

Avg. before construction: 166 (28 days of data)

Avg. during construction: 197 (20 days of data)

Le Sud-OuestObstructedAutre

Mar 22, 2026 → Apr 10, 2026

15-60 days

~924 m

Insufficient data