Track active roadwork that affects bike paths and likely impact on bike traffic.
Total Affected
94
Distinct construction zones impacting a bike path
Bike Paths Blocked
45
Fully closed to cyclists - requires detour
Bike Paths Obstructed
49
Partially obstructed - reduced width or shared lane
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Villeray-Saint-Michel-Parc-Extension | Blocked | S-3 Infrastructure souterraine majeure - Puits d'accès | Feb 8, 2026 → Apr 10, 2026 61-180 days | ~1,407 m | Insufficient data | |
| Ville-Marie | Blocked | AS-2 Réseau aérosouterrain existant | Jun 16, 2025 → Apr 10, 2026 180+ days | ~86 m | -33.1% vs before Likely decrease Avg. before construction: 1,100 (28 days of data) Avg. during construction: 737 (258 days of data) | |
| Ahuntsic-Cartierville | Blocked | Autre | Mar 8, 2026 → Apr 17, 2026 15-60 days | ~175 m | Insufficient data Avg. before construction: 0 (21 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Apr 6, 2026 → May 14, 2026 15-60 days | ~1,292 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Mar 29, 2026 → Jun 1, 2026 61-180 days | ~675 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Mar 31, 2026 → Jun 12, 2026 61-180 days | ~1,557 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation avec excavation | May 3, 2022 → Jun 30, 2026 180+ days | ~698 m | +47.4% vs before Likely increase Avg. before construction: 1,081 (28 days of data) Avg. during construction: 1,594 (1,385 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~71 m | Insufficient data Avg. before construction: 202 (7 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~79 m | Insufficient data Avg. before construction: 202 (7 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Mar 29, 2026 → Oct 30, 2026 180+ days | ~668 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 6, 2026 → Oct 30, 2026 180+ days | ~464 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Mar 8, 2026 → Oct 31, 2026 180+ days | ~47 m | Insufficient data Avg. before construction: 150 (21 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Feb 10, 2026 → Jul 17, 2026 61-180 days | ~515 m | +23.8% vs before Likely increase Avg. before construction: 87 (28 days of data) Avg. during construction: 108 (19 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Jan 12, 2025 → Aug 29, 2026 180+ days | ~734 m | +569% vs before Likely increase Avg. before construction: 253 (28 days of data) Avg. during construction: 1,695 (413 days of data) | |
| Ville-Marie | Blocked | AS-2 Réseau aérosouterrain existant | Jun 16, 2025 → Apr 10, 2026 180+ days | ~141 m | -33.1% vs before Likely decrease Avg. before construction: 1,100 (28 days of data) Avg. during construction: 737 (258 days of data) | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Jan 12, 2026 → Apr 11, 2026 61-180 days | ~1,203 m | +6.7% vs before Likely stable Avg. before construction: 37 (28 days of data) Avg. during construction: 39 (30 days of data) | |
| Ahuntsic-Cartierville | Blocked | S-3 Infrastructure souterraine majeure - Puits d'accès | Mar 29, 2026 → Apr 19, 2026 15-60 days | ~918 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Mar 17, 2026 → Apr 30, 2026 15-60 days | ~1,225 m | Insufficient data Avg. before construction: 1 (12 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Apr 6, 2026 → Apr 10, 2026 3-14 days | ~503 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Feb 28, 2026 → May 31, 2026 61-180 days | ~556 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~92 m | Insufficient data Avg. before construction: 202 (7 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation sans excavation | Apr 6, 2026 → Apr 10, 2026 3-14 days | ~205 m | Insufficient data | |
| Pierrefonds-Roxboro | Blocked | Égouts et aqueducs - Excavation | Apr 6, 2026 → Apr 10, 2026 3-14 days | ~1,119 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Inspection et nettoyage | Apr 5, 2026 → Apr 10, 2026 3-14 days | ~2,187 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation sans excavation | Mar 31, 2026 → Apr 30, 2026 15-60 days | ~211 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Entretien | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~976 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Entretien | Apr 7, 2026 → Apr 8, 2026 0-2 days | ~833 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ville-Marie | Blocked | Entretien | Apr 6, 2026 → Apr 8, 2026 0-2 days | ~544 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Entretien | Apr 7, 2026 → Apr 9, 2026 0-2 days | ~458 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Mar 29, 2026 → Jun 1, 2026 61-180 days | ~675 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | A-1 Réseau aérien existant | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~3,113 m | Insufficient data | |
| Verdun | Blocked | Forage/excavation exploratoire | Mar 25, 2026 → Apr 20, 2026 15-60 days | ~622 m | Insufficient data Avg. before construction: 41 (4 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | Mar 22, 2026 → May 18, 2026 15-60 days | ~229 m | Insufficient data | |
| LaSalle | Blocked | Construction/rénovation avec excavation | Mar 19, 2026 → Apr 20, 2026 15-60 days | ~5,725 m | Insufficient data Avg. before construction: 135 (10 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation sans excavation | Nov 29, 2022 → Jun 30, 2026 180+ days | ~724 m | +23.1% vs before Likely increase Avg. before construction: 1,238 (28 days of data) Avg. during construction: 1,524 (1,175 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Entretien | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~1,192 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Entretien | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~2,895 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Égouts et aqueducs - Inspection et nettoyage | Mar 29, 2026 → Apr 9, 2026 3-14 days | ~1,216 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Égouts et aqueducs - Excavation | Mar 31, 2026 → Apr 9, 2026 3-14 days | ~1,790 m | Insufficient data | |
| Outremont | Blocked | Construction/rénovation sans excavation | Mar 25, 2026 → Jul 18, 2026 61-180 days | ~1,189 m | Insufficient data Avg. before construction: 273 (4 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation avec excavation | Mar 1, 2026 → May 6, 2026 61-180 days | ~677 m | Insufficient data Avg. before construction: 38 (28 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~542 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Apr 7, 2026 → Apr 8, 2026 0-2 days | ~544 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → Jun 12, 2026 61-180 days | ~690 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Entretien | Apr 6, 2026 → Apr 8, 2026 0-2 days | ~2,735 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Autre | Mar 29, 2026 → Apr 10, 2026 3-14 days | ~830 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | Apr 6, 2026 → May 22, 2026 15-60 days | ~425 m | Insufficient data | |
| Montréal-Nord | Obstructed | Construction/rénovation sans excavation | Mar 31, 2026 → Oct 30, 2026 180+ days | ~2,784 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Autre | Mar 29, 2026 → Apr 24, 2026 15-60 days | ~965 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Mar 31, 2026 → May 29, 2026 15-60 days | ~1,627 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Mar 15, 2026 → Apr 10, 2026 15-60 days | ~720 m | Insufficient data Avg. before construction: 25 (14 days of data) | |
| Anjou | Obstructed | Autre | Jan 10, 2026 → Apr 11, 2026 61-180 days | ~3,171 m | +9.9% vs before Likely increase Avg. before construction: 34 (28 days of data) Avg. during construction: 37 (50 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Mar 31, 2026 → May 29, 2026 15-60 days | ~1,627 m | Insufficient data | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → May 31, 2026 15-60 days | ~918 m | Insufficient data | |
| Anjou | Obstructed | Autre | Apr 5, 2026 → Apr 10, 2026 3-14 days | ~3,036 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Autre | Feb 22, 2026 → Apr 13, 2026 15-60 days | ~1,497 m | Insufficient data Avg. before construction: 49 (17 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | Apr 6, 2026 → May 22, 2026 15-60 days | ~425 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | May 27, 2025 → Sep 30, 2026 180+ days | ~692 m | -10.9% vs before Likely decrease Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,140 (278 days of data) | |
| Ville-Marie | Obstructed | Entretien | Apr 6, 2026 → Apr 8, 2026 0-2 days | ~490 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation sans excavation | Apr 1, 2026 → Apr 8, 2026 3-14 days | ~546 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | Apr 6, 2026 → Apr 10, 2026 3-14 days | ~651 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Apr 5, 2026 → Apr 6, 2026 0-2 days | ~456 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~505 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~453 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Apr 7, 2026 → Apr 8, 2026 0-2 days | ~442 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Forage/excavation exploratoire | Mar 25, 2026 → Apr 10, 2026 15-60 days | ~2,657 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Forage/excavation exploratoire | Mar 25, 2026 → Apr 10, 2026 15-60 days | ~2,524 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Mar 31, 2026 → Apr 10, 2026 3-14 days | ~3,815 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Forage/excavation exploratoire | Mar 25, 2026 → Apr 10, 2026 15-60 days | ~1,000 m | Insufficient data Avg. before construction: 175 (4 days of data) | |
| St-Laurent | Obstructed | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | Apr 6, 2026 → Apr 14, 2026 3-14 days | ~353 m | Insufficient data | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Excavation | Apr 3, 2026 → Apr 5, 2026 0-2 days | ~344 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~3,131 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 7, 2026 → Apr 8, 2026 0-2 days | ~4,190 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Pierrefonds-Roxboro | Obstructed | Forage/excavation exploratoire | Apr 5, 2026 → Apr 24, 2026 15-60 days | ~6,397 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~3,201 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Toiture - Rénovation | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~942 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation sans excavation | Mar 31, 2026 → Apr 10, 2026 3-14 days | ~1,675 m | Insufficient data | |
| Ville-Marie | Obstructed | Autre | Apr 6, 2026 → Apr 10, 2026 3-14 days | ~596 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Autre | Mar 29, 2026 → Apr 10, 2026 3-14 days | ~830 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Forage/excavation exploratoire | Apr 5, 2026 → Apr 17, 2026 3-14 days | ~6,269 m | Insufficient data | |
| Ville-Marie | Obstructed | Construction/rénovation sans excavation | Jan 27, 2026 → Apr 30, 2026 61-180 days | ~63 m | Insufficient data Avg. during construction: 188 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Mar 10, 2026 → Sep 1, 2026 61-180 days | ~2,407 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 1, 2026 → Oct 2, 2026 180+ days | ~3,647 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | Apr 7, 2026 → Apr 8, 2026 0-2 days | ~643 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Construction/rénovation sans excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~96 m | Insufficient data Avg. before construction: 202 (7 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Égouts et aqueducs - Réhabilitation | Mar 29, 2026 → Apr 10, 2026 3-14 days | ~2,518 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | Apr 6, 2026 → Apr 7, 2026 0-2 days | ~141 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Autre | Dec 4, 2025 → Apr 30, 2026 61-180 days | ~1,232 m | -73.6% vs before Likely decrease Avg. before construction: 456 (28 days of data) Avg. during construction: 121 (87 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Mar 3, 2024 → Dec 23, 2026 180+ days | ~661 m | +410.4% vs before Likely increase Avg. before construction: 257 (28 days of data) Avg. during construction: 1,314 (728 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Autre | Apr 6, 2026 → Apr 14, 2026 3-14 days | ~181 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Construction/rénovation avec excavation | Feb 9, 2026 → Apr 15, 2026 61-180 days | ~1,101 m | +18.5% vs before Likely increase Avg. before construction: 166 (28 days of data) Avg. during construction: 197 (20 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Mar 22, 2026 → Apr 10, 2026 15-60 days | ~924 m | Insufficient data |