Track active roadwork that affects bike paths and likely impact on bike traffic.
Total Affected
183
Distinct construction zones impacting a bike path
Bike Paths Blocked
97
Fully closed to cyclists - requires detour
Bike Paths Obstructed
86
Partially obstructed - reduced width or shared lane
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Ville-Marie | Blocked | Construction/rénovation avec excavation | May 9, 2026 → May 11, 2026 0-2 days | ~263 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Apr 6, 2026 → May 14, 2026 15-60 days | ~1,292 m | Insufficient data Avg. before construction: 3 (11 days of data) | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | Apr 18, 2026 → May 15, 2026 15-60 days | ~2,766 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | May 12, 2026 → May 18, 2026 3-14 days | ~246 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | May 12, 2026 → May 18, 2026 3-14 days | ~495 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | May 11, 2026 → May 22, 2026 3-14 days | ~542 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Mar 29, 2026 → Jun 1, 2026 61-180 days | ~675 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Apr 12, 2026 → Jun 1, 2026 15-60 days | ~674 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Autre | Apr 26, 2026 → Jun 8, 2026 15-60 days | ~1,057 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Mar 31, 2026 → Jun 12, 2026 61-180 days | ~1,557 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Autre | May 10, 2026 → Jun 23, 2026 15-60 days | ~515 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 26, 2026 61-180 days | ~166 m | Insufficient data Avg. before construction: 141 (3 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 26, 2026 61-180 days | ~166 m | Insufficient data Avg. before construction: 141 (3 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 30, 2026 61-180 days | ~1,240 m | Insufficient data Avg. before construction: 2 (5 days of data) | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 10, 2026 61-180 days | ~1,029 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Autre | May 12, 2026 → Aug 12, 2026 61-180 days | ~605 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 9, 2026 → Aug 16, 2026 61-180 days | ~611 m | Insufficient data | |
| Ville-Marie | Blocked | Autre | May 10, 2026 → Sep 8, 2026 61-180 days | ~645 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~71 m | Insufficient data Avg. before construction: 205 (24 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~79 m | Insufficient data Avg. before construction: 205 (24 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Mar 29, 2026 → Oct 30, 2026 180+ days | ~668 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 6, 2026 → Oct 30, 2026 180+ days | ~464 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~283 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~206 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Mar 8, 2026 → Oct 31, 2026 180+ days | ~47 m | +5.3% vs before Likely stable Avg. before construction: 149 (28 days of data) Avg. during construction: 157 (12 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Autre | Apr 26, 2026 → May 15, 2026 15-60 days | ~456 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Feb 10, 2026 → Jul 17, 2026 61-180 days | ~515 m | +23.7% vs before Likely increase Avg. before construction: 87 (28 days of data) Avg. during construction: 107 (39 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 9, 2026 → Aug 16, 2026 61-180 days | ~630 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Jan 12, 2025 → Aug 29, 2026 180+ days | ~734 m | +544.6% vs before Likely increase Avg. before construction: 253 (28 days of data) Avg. during construction: 1,633 (432 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | May 6, 2026 → May 14, 2026 3-14 days | ~599 m | Insufficient data | |
| Ville-Marie | Blocked | Entretien | May 11, 2026 → May 12, 2026 0-2 days | ~98 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 3, 2026 → May 15, 2026 3-14 days | ~469 m | Insufficient data | |
| Pierrefonds-Roxboro | Blocked | Construction/rénovation avec excavation | May 12, 2026 → May 15, 2026 3-14 days | ~1,071 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Autre | May 10, 2026 → May 21, 2026 3-14 days | ~422 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | S-3 Infrastructure souterraine majeure - Massifs et conduits | May 3, 2026 → May 24, 2026 15-60 days | ~918 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Réhabilitation | May 6, 2026 → May 31, 2026 15-60 days | ~952 m | Insufficient data | |
| Ville-Marie | Blocked | S-3 Infrastructure souterraine majeure - Puits d'accès | May 10, 2026 → Jun 5, 2026 15-60 days | ~224 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Apr 20, 2026 → Jul 17, 2026 61-180 days | ~1,202 m | Insufficient data | |
| Ville-Marie | Blocked | Entretien | May 11, 2026 → May 12, 2026 0-2 days | ~248 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | May 12, 2026 → May 18, 2026 3-14 days | ~55 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 10, 2026 → May 20, 2026 3-14 days | ~1,389 m | Insufficient data | |
| Ville-Marie | Blocked | Entretien | May 12, 2026 → May 13, 2026 0-2 days | ~142 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 3, 2026 → May 15, 2026 3-14 days | ~469 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 10, 2026 → May 22, 2026 3-14 days | ~407 m | Insufficient data | |
| Outremont | Blocked | Construction/rénovation sans excavation | May 6, 2026 → May 22, 2026 15-60 days | ~582 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 12, 2026 → May 22, 2026 3-14 days | ~703 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | S-3 Infrastructure souterraine majeure - Massifs et conduits | May 3, 2026 → May 24, 2026 15-60 days | ~918 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation sans excavation | Mar 31, 2026 → May 31, 2026 61-180 days | ~211 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation sans excavation | May 7, 2026 → May 11, 2026 3-14 days | ~1,703 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Excavation | May 8, 2026 → May 11, 2026 3-14 days | ~1,980 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | May 12, 2026 → May 13, 2026 0-2 days | ~1,042 m | Insufficient data | |
| Ville-Marie | Blocked | Entretien | May 13, 2026 → May 14, 2026 0-2 days | ~94 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~92 m | Insufficient data Avg. before construction: 205 (24 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Excavation | May 10, 2026 → May 12, 2026 0-2 days | ~764 m | Insufficient data | |
| Ville-Marie | Blocked | Entretien | May 10, 2026 → May 15, 2026 3-14 days | ~197 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | May 5, 2026 → May 20, 2026 15-60 days | ~164 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Entretien | May 12, 2026 → May 14, 2026 0-2 days | ~19 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Entretien | May 13, 2026 → May 14, 2026 0-2 days | ~690 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | May 13, 2026 → May 14, 2026 0-2 days | ~182 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Mar 29, 2026 → Jun 1, 2026 61-180 days | ~675 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | Mar 22, 2026 → Jun 4, 2026 61-180 days | ~229 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | May 8, 2026 → May 15, 2026 3-14 days | ~294 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | May 10, 2026 → May 15, 2026 3-14 days | ~202 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | AS-2 Réseau aérosouterrain existant | May 10, 2026 → May 15, 2026 3-14 days | ~329 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation sans excavation | May 10, 2026 → May 20, 2026 3-14 days | ~757 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Entretien | May 10, 2026 → May 11, 2026 0-2 days | ~186 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Entretien | May 13, 2026 → May 14, 2026 0-2 days | ~163 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | May 13, 2026 → May 15, 2026 0-2 days | ~344 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Apr 12, 2026 → Jun 1, 2026 15-60 days | ~674 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 5, 2026 → Jun 12, 2026 15-60 days | ~3,233 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 13, 2026 → Jun 12, 2026 15-60 days | ~338 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 10, 2026 → Jun 19, 2026 15-60 days | ~4,334 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | May 6, 2026 → May 11, 2026 3-14 days | ~424 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions | May 3, 2026 → May 12, 2026 3-14 days | ~564 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | Apr 30, 2026 → Jun 1, 2026 15-60 days | ~485 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation sans excavation | Apr 23, 2026 → Oct 1, 2026 61-180 days | ~38 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 5, 2026 → Jul 17, 2026 61-180 days | ~1,798 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 5, 2026 → Jul 17, 2026 61-180 days | ~1,856 m | Insufficient data | |
| Ville-Marie | Blocked | Autre | May 7, 2026 → May 13, 2026 3-14 days | ~534 m | Insufficient data | |
| Anjou | Blocked | Égouts et aqueducs - Inspection et nettoyage | May 3, 2026 → May 15, 2026 3-14 days | ~3,415 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | May 1, 2026 → May 15, 2026 3-14 days | ~180 m | Insufficient data | |
| Lachine | Blocked | Construction/rénovation sans excavation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~6,263 m | Insufficient data | |
| Outremont | Blocked | Construction/rénovation sans excavation | Mar 25, 2026 → Jul 18, 2026 61-180 days | ~1,189 m | Insufficient data Avg. before construction: 297 (23 days of data) | |
| Le Sud-Ouest | Blocked | Construction/rénovation sans excavation | Apr 24, 2026 → May 22, 2026 15-60 days | ~1,130 m | Insufficient data | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 27, 2026 → Jun 22, 2026 15-60 days | ~157 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | May 11, 2026 → May 12, 2026 0-2 days | ~542 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | May 12, 2026 → May 13, 2026 0-2 days | ~543 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | May 13, 2026 → May 14, 2026 0-2 days | ~542 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rosemont-La Petite-Patrie | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 10, 2026 → May 15, 2026 3-14 days | ~1,182 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation sans excavation | May 5, 2026 → May 18, 2026 3-14 days | ~669 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,000 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,000 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation sans excavation | May 7, 2026 → May 11, 2026 3-14 days | ~1,703 m | Insufficient data | |
| Outremont | Blocked | Trottoirs - Construction | May 4, 2026 → May 11, 2026 3-14 days | ~540 m | Insufficient data | |
| Outremont | Blocked | Trottoirs - Construction | May 5, 2026 → May 11, 2026 3-14 days | ~422 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | May 10, 2026 → May 13, 2026 3-14 days | ~1,993 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → Jun 12, 2026 61-180 days | ~690 m | Insufficient data Avg. before construction: 51 (11 days of data) | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 27, 2026 → Jun 22, 2026 15-60 days | ~157 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Entretien | May 12, 2026 → May 14, 2026 0-2 days | ~487 m | Insufficient data | |
| Anjou | Obstructed | Autre | Apr 28, 2026 → May 15, 2026 15-60 days | ~3,036 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | May 11, 2026 → May 18, 2026 3-14 days | ~1,005 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | Apr 6, 2026 → May 22, 2026 15-60 days | ~425 m | Insufficient data Avg. before construction: 384 (11 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 5, 2026 → May 25, 2026 15-60 days | ~3,285 m | Insufficient data | |
| Montréal-Nord | Obstructed | Autre | May 12, 2026 → May 27, 2026 15-60 days | ~3,508 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → Jun 19, 2026 15-60 days | ~414 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | May 10, 2026 → May 13, 2026 3-14 days | ~1,993 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Mar 15, 2026 → May 15, 2026 61-180 days | ~720 m | -15.9% vs before Likely decrease Avg. before construction: 37 (28 days of data) Avg. during construction: 31 (5 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | May 3, 2026 → May 29, 2026 15-60 days | ~1,446 m | Insufficient data | |
| Montréal-Nord | Obstructed | Construction/rénovation sans excavation | Mar 31, 2026 → Oct 30, 2026 180+ days | ~2,784 m | Insufficient data Avg. before construction: 0 (17 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Mar 29, 2026 → May 20, 2026 15-60 days | ~965 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Mar 31, 2026 → May 29, 2026 15-60 days | ~1,627 m | Insufficient data Avg. before construction: 16 (18 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Égouts et aqueducs - Excavation | May 10, 2026 → May 13, 2026 3-14 days | ~2,742 m | Insufficient data | |
| Anjou | Obstructed | Autre | Apr 28, 2026 → May 15, 2026 15-60 days | ~3,036 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 19, 2026 15-60 days | ~4,315 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | Apr 8, 2026 → May 29, 2026 15-60 days | ~212 m | Insufficient data Avg. before construction: 247 (7 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Mar 31, 2026 → May 29, 2026 15-60 days | ~1,627 m | Insufficient data Avg. before construction: 16 (18 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → May 31, 2026 15-60 days | ~918 m | Insufficient data Avg. before construction: 3 (11 days of data) | |
| Anjou | Obstructed | Autre | Jan 10, 2026 → Jun 11, 2026 61-180 days | ~3,171 m | +24.3% vs before Likely increase Avg. before construction: 34 (28 days of data) Avg. during construction: 42 (69 days of data) | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | May 11, 2026 → May 15, 2026 3-14 days | ~543 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Entretien | May 12, 2026 → May 13, 2026 0-2 days | ~198 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Entretien | May 10, 2026 → May 14, 2026 3-14 days | ~583 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Entretien | May 13, 2026 → May 14, 2026 0-2 days | ~824 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation sans excavation | May 7, 2026 → May 15, 2026 3-14 days | ~1,788 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | Apr 6, 2026 → May 22, 2026 15-60 days | ~425 m | Insufficient data Avg. before construction: 384 (11 days of data) | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | May 6, 2026 → May 31, 2026 15-60 days | ~952 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → Jun 19, 2026 15-60 days | ~414 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Autre | May 12, 2026 → Aug 12, 2026 61-180 days | ~605 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | May 27, 2025 → Sep 30, 2026 180+ days | ~692 m | -12.3% vs before Likely decrease Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,122 (283 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 10, 2026 → May 11, 2026 0-2 days | ~3,149 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation sans excavation | May 3, 2026 → May 13, 2026 3-14 days | ~218 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | May 4, 2026 → May 11, 2026 3-14 days | ~601 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | May 7, 2026 → May 15, 2026 3-14 days | ~2,501 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 19, 2026 15-60 days | ~4,253 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 19, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 10, 2026 → May 20, 2026 3-14 days | ~991 m | Insufficient data | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Excavation | May 10, 2026 → May 22, 2026 3-14 days | ~94 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | May 3, 2026 → Nov 27, 2026 180+ days | ~384 m | Insufficient data | |
| Montréal-Nord | Obstructed | Entretien | May 10, 2026 → May 11, 2026 0-2 days | ~3,794 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 10, 2026 → May 11, 2026 0-2 days | ~493 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 10, 2026 → May 11, 2026 0-2 days | ~405 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Entretien | May 10, 2026 → May 11, 2026 0-2 days | ~959 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | May 11, 2026 → May 12, 2026 0-2 days | ~2,663 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | May 11, 2026 → May 12, 2026 0-2 days | ~893 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 11, 2026 → May 12, 2026 0-2 days | ~399 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Entretien | May 11, 2026 → May 12, 2026 0-2 days | ~813 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 12, 2026 → May 13, 2026 0-2 days | ~475 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Entretien | May 12, 2026 → May 13, 2026 0-2 days | ~1,300 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 13, 2026 → May 14, 2026 0-2 days | ~462 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| St-Laurent | Obstructed | Autre | May 5, 2026 → May 15, 2026 3-14 days | ~1,698 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Égouts et aqueducs - Inspection et nettoyage | May 10, 2026 → May 15, 2026 3-14 days | ~604 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~1,553 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~1,528 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,045 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~1,902 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Apr 19, 2026 → May 15, 2026 15-60 days | ~1,008 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Apr 19, 2026 → May 15, 2026 15-60 days | ~1,008 m | Insufficient data | |
| Anjou | Obstructed | Autre | May 10, 2026 → Jun 11, 2026 15-60 days | ~3,192 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 12, 2026 61-180 days | ~4,522 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | S-1 Infrastructure souterraine existante | May 4, 2026 → May 15, 2026 3-14 days | ~393 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 30, 2026 61-180 days | ~4,572 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Mar 10, 2026 → Sep 1, 2026 61-180 days | ~2,407 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Apr 14, 2026 → May 22, 2026 15-60 days | ~210 m | Insufficient data Avg. before construction: 5 (1 days of data) | |
| Pierrefonds-Roxboro | Obstructed | Égouts et aqueducs - Excavation | May 11, 2026 → May 15, 2026 3-14 days | ~1,367 m | Insufficient data | |
| Outremont | Obstructed | Construction/rénovation sans excavation | Apr 16, 2026 → May 22, 2026 15-60 days | ~606 m | Insufficient data Avg. before construction: 0 (1 days of data) | |
| Ville-Marie | Obstructed | Construction/rénovation sans excavation | May 6, 2026 → May 31, 2026 15-60 days | ~592 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 1, 2026 → Oct 2, 2026 180+ days | ~3,647 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Entretien | May 11, 2026 → May 12, 2026 0-2 days | ~653 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 19, 2026 15-60 days | ~4,315 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Construction/rénovation sans excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~96 m | Insufficient data Avg. before construction: 205 (24 days of data) | |
| Anjou | Obstructed | Entretien | May 10, 2026 → May 11, 2026 0-2 days | ~3,214 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Entretien | May 12, 2026 → May 13, 2026 0-2 days | ~738 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | May 12, 2026 → May 18, 2026 3-14 days | ~55 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Apr 19, 2026 → May 15, 2026 15-60 days | ~1,008 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 19, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 19, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | May 13, 2026 → May 15, 2026 0-2 days | ~338 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Sud-Ouest | Obstructed | Autre | Mar 3, 2024 → Dec 23, 2026 180+ days | ~661 m | +393.6% vs before Likely increase Avg. before construction: 257 (28 days of data) Avg. during construction: 1,271 (759 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → May 13, 2026 0-2 days | ~789 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Autre | May 11, 2026 → May 15, 2026 3-14 days | ~2,109 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Autre | May 11, 2026 → May 15, 2026 3-14 days | ~1,438 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Autre | May 11, 2026 → May 15, 2026 3-14 days | ~1,780 m | Insufficient data |