Construction Impact

Track active roadwork that affects bike paths and likely impact on bike traffic.

Source: Ville de Montreal - active construction permits with bike path impacts, updated daily.Snapshot date:Nov 9, 2026

Total Affected

199

Distinct construction zones impacting a bike path

Bike Paths Blocked

122

Fully closed to cyclists - requires detour

Bike Paths Obstructed

77

Partially obstructed - reduced width or shared lane

Status
AllBlockedObstructed
Borough
Reason
Duration
All0-2 days3-14 days15-60 days61-180 days180+ days

Active Bike Path Blockages(199)

Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.

StreetBoroughStatusReasonDurationNearest CounterVolume Impact
Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,340 m

Insufficient data

Le Sud-OuestBlockedTrottoirs - Construction

Sep 29, 2026 → Nov 11, 2026

15-60 days

~781 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Nov 13, 2026

180+ days

~79 m

+335.7% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 939 (221 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Nov 13, 2026

180+ days

~71 m

+335.7% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 939 (221 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Jun 1, 2026 → Nov 13, 2026

61-180 days

~170 m

+4.7% vs before

Likely stable

Avg. before construction: 1,676 (28 days of data)

Avg. during construction: 1,754 (134 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 11, 2026 → Nov 13, 2026

180+ days

~206 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Oct 27, 2026 → Nov 14, 2026

15-60 days

~2,441 m

-10.5% vs before

Likely decrease

Avg. before construction: 458 (28 days of data)

Avg. during construction: 410 (12 days of data)

Ville-MarieBlockedAutre

Oct 26, 2026 → Nov 16, 2026

15-60 days

~460 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedÉgouts et aqueducs - Excavation

Aug 31, 2026 → Nov 20, 2026

61-180 days

~2,553 m

-34.1% vs before

Likely decrease

Avg. before construction: 652 (20 days of data)

Avg. during construction: 429 (67 days of data)

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Oct 21, 2026 → Nov 22, 2026

15-60 days

~755 m

Insufficient data

Le Sud-OuestBlockedÉgouts et aqueducs - Excavation

Oct 21, 2026 → Nov 22, 2026

15-60 days

~787 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 11, 2026 → Nov 23, 2026

180+ days

~283 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Sep 17, 2026 → Nov 27, 2026

61-180 days

~909 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jun 4, 2026 → Dec 11, 2026

180+ days

~258 m

Insufficient data

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Excavation

Aug 2, 2026 → Dec 11, 2026

61-180 days

~2,745 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Oct 12, 2026 → Dec 18, 2026

61-180 days

~213 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Oct 12, 2026 → Dec 18, 2026

61-180 days

~213 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Nov 8, 2026 → Mar 22, 2027

61-180 days

~128 m

Insufficient data

Avg. before construction: 3,094 (28 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Aug 25, 2026 → May 1, 2027

180+ days

~35 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Oct 25, 2026 → May 6, 2027

180+ days

~1,106 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Jun 10, 2026 → Jun 11, 2027

180+ days

~594 m

-1% vs before

Likely stable

Avg. before construction: 1,279 (28 days of data)

Avg. during construction: 1,266 (141 days of data)

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Sep 27, 2026 → Nov 14, 2026

15-60 days

~2,374 m

-41% vs before

Likely decrease

Avg. before construction: 578 (25 days of data)

Avg. during construction: 341 (42 days of data)

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Sep 29, 2026 → Nov 14, 2026

15-60 days

~1,655 m

-49.3% vs before

Likely decrease

Avg. before construction: 454 (27 days of data)

Avg. during construction: 230 (40 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedAutre

Oct 18, 2026 → Feb 20, 2027

61-180 days

~304 m

-17.3% vs before

Likely decrease

Avg. before construction: 796 (28 days of data)

Avg. during construction: 658 (21 days of data)

Le Plateau-Mont-RoyalBlockedConstruction/rénovation sans excavation

Jun 14, 2026 → Jun 14, 2027

180+ days

~251 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,431 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,064 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,198 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~889 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Nov 1, 2026 → Nov 11, 2026

3-14 days

~687 m

-3% vs before

Likely stable

Avg. before construction: 258 (28 days of data)

Avg. during construction: 250 (7 days of data)

Le Sud-OuestBlockedÉgouts et aqueducs - Excavation

Nov 1, 2026 → Nov 20, 2026

15-60 days

~1,527 m

Insufficient data

Ahuntsic-CartiervilleBlockedEntretien

Nov 7, 2026 → Nov 8, 2026

0-2 days

~2,847 m

Insufficient data

Ahuntsic-CartiervilleBlockedEntretien

Nov 7, 2026 → Nov 8, 2026

0-2 days

~2,847 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation sans excavation

Nov 9, 2026 → Nov 10, 2026

0-2 days

~1,255 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedEntretien

Nov 10, 2026 → Nov 11, 2026

0-2 days

~1,090 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ahuntsic-CartiervilleBlockedTrottoirs - Construction

Sep 28, 2026 → Nov 13, 2026

15-60 days

~1,388 m

-33.5% vs before

Likely decrease

Avg. before construction: 1,210 (26 days of data)

Avg. during construction: 805 (7 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation sans excavation

Sep 24, 2026 → Nov 27, 2026

61-180 days

~745 m

Insufficient data

Le Plateau-Mont-RoyalBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

Oct 27, 2026 → Nov 27, 2026

15-60 days

~314 m

-6.9% vs before

Likely stable

Avg. before construction: 1,071 (28 days of data)

Avg. during construction: 997 (12 days of data)

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Sep 20, 2026 → Dec 11, 2026

61-180 days

~809 m

-28.8% vs before

Likely decrease

Avg. before construction: 2,306 (18 days of data)

Avg. during construction: 1,642 (49 days of data)

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Sep 20, 2026 → Dec 11, 2026

61-180 days

~809 m

-28.8% vs before

Likely decrease

Avg. before construction: 2,306 (18 days of data)

Avg. during construction: 1,642 (49 days of data)

Ville-MarieBlockedConstruction/rénovation sans excavation

Oct 25, 2026 → Dec 18, 2026

15-60 days

~110 m

-14% vs before

Likely decrease

Avg. before construction: 1,733 (28 days of data)

Avg. during construction: 1,491 (14 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Jul 17, 2026 → Dec 31, 2026

61-180 days

~306 m

Insufficient data

Ahuntsic-CartiervilleBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

Nov 8, 2026 → Jan 8, 2027

61-180 days

~273 m

Insufficient data

Le Plateau-Mont-RoyalBlockedS-3 Infrastructure souterraine majeure - Massifs et conduits

Nov 3, 2026 → Nov 12, 2026

3-14 days

~105 m

0% vs before

Likely stable

Avg. before construction: 987 (28 days of data)

Avg. during construction: 988 (5 days of data)

St-LaurentBlockedÉgouts et aqueducs - Excavation

Oct 31, 2026 → Nov 15, 2026

15-60 days

~1,572 m

+3.7% vs before

Likely stable

Avg. before construction: 1,358 (28 days of data)

Avg. during construction: 1,408 (8 days of data)

Ahuntsic-CartiervilleBlockedAutre

Oct 1, 2026 → Nov 8, 2026

15-60 days

~173 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedAutre

Nov 7, 2026 → Nov 8, 2026

0-2 days

~1,337 m

Insufficient data

Avg. before construction: 413 (28 days of data)

Avg. during construction: 314 (1 days of data)

Le Sud-OuestBlockedTrottoirs - Construction

Oct 11, 2026 → Nov 9, 2026

15-60 days

~721 m

-32.9% vs before

Likely decrease

Avg. before construction: 2,084 (28 days of data)

Avg. during construction: 1,397 (28 days of data)

Ahuntsic-CartiervilleBlockedEntretien

Nov 8, 2026 → Nov 12, 2026

3-14 days

~4,860 m

Insufficient data

LachineBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz

Nov 8, 2026 → Nov 13, 2026

3-14 days

~5,372 m

Insufficient data

Avg. before construction: 582 (28 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedEntretien

Nov 8, 2026 → Nov 13, 2026

3-14 days

~1,774 m

Insufficient data

Avg. before construction: 51,600 (7 days of data)

Le Sud-OuestBlockedRéseaux routier - Réfection et travaux corrélatifs

Nov 8, 2026 → Nov 13, 2026

3-14 days

~1,037 m

Insufficient data

Avg. before construction: 1,397 (28 days of data)

LachineBlockedRéseaux routier - Réfection et travaux corrélatifs

Nov 8, 2026 → Nov 13, 2026

3-14 days

~5,712 m

Insufficient data

Avg. before construction: 582 (28 days of data)

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Sep 27, 2026 → Nov 14, 2026

15-60 days

~2,374 m

-41% vs before

Likely decrease

Avg. before construction: 578 (25 days of data)

Avg. during construction: 341 (42 days of data)

Rosemont-La Petite-PatrieBlockedAutre

Oct 18, 2026 → Nov 20, 2026

15-60 days

~274 m

-10.9% vs before

Likely decrease

Avg. before construction: 3,564 (28 days of data)

Avg. during construction: 3,176 (21 days of data)

Ville-MarieBlockedConstruction/rénovation sans excavation

Nov 4, 2026 → Nov 30, 2026

15-60 days

~709 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedÉgouts et aqueducs - Excavation

Nov 4, 2026 → Nov 10, 2026

3-14 days

~3,079 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Nov 13, 2026

180+ days

~92 m

+335.7% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 939 (221 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,758 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,758 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Ahuntsic-CartiervilleBlockedFeux de signalisation - Ajout/réparation

Oct 20, 2026 → Nov 9, 2026

15-60 days

~1,223 m

-22.8% vs before

Likely decrease

Avg. before construction: 853 (28 days of data)

Avg. during construction: 659 (13 days of data)

Mercier-Hochelaga-MaisonneuveBlockedS-3 Infrastructure souterraine majeure - Massifs et conduits

Oct 28, 2026 → Nov 9, 2026

3-14 days

~556 m

-10.2% vs before

Likely decrease

Avg. before construction: 450 (28 days of data)

Avg. during construction: 404 (11 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedFeux de signalisation - Ajout/réparation

Nov 9, 2026 → Nov 12, 2026

3-14 days

~290 m

Insufficient data

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Excavation

Nov 8, 2026 → Nov 12, 2026

3-14 days

~311 m

Insufficient data

Avg. before construction: 130 (28 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Nov 13, 2026

15-60 days

~795 m

-37.6% vs before

Likely decrease

Avg. before construction: 1,037 (28 days of data)

Avg. during construction: 647 (21 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Nov 13, 2026

15-60 days

~898 m

-37.6% vs before

Likely decrease

Avg. before construction: 1,037 (28 days of data)

Avg. during construction: 647 (21 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Nov 13, 2026

15-60 days

~795 m

-37.6% vs before

Likely decrease

Avg. before construction: 1,037 (28 days of data)

Avg. during construction: 647 (21 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Nov 13, 2026

15-60 days

~898 m

-37.6% vs before

Likely decrease

Avg. before construction: 1,037 (28 days of data)

Avg. during construction: 647 (21 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Jun 1, 2026 → Nov 13, 2026

61-180 days

~170 m

+4.7% vs before

Likely stable

Avg. before construction: 1,676 (28 days of data)

Avg. during construction: 1,754 (134 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions

Nov 8, 2026 → Nov 20, 2026

3-14 days

~1,104 m

Insufficient data

Avg. before construction: 582 (28 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Nov 10, 2026 → Nov 27, 2026

15-60 days

~2,042 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Le Plateau-Mont-RoyalBlockedConstruction/rénovation avec excavation

Sep 26, 2026 → Mar 31, 2028

180+ days

~767 m

Insufficient data

Ahuntsic-CartiervilleBlockedEntretien

Nov 8, 2026 → Nov 9, 2026

0-2 days

~936 m

Insufficient data

Avg. before construction: 659 (22 days of data)

Le Plateau-Mont-RoyalBlockedEntretien

Nov 9, 2026 → Nov 10, 2026

0-2 days

~451 m

Insufficient data

Avg. before construction: 2,250 (27 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Nov 9, 2026 → Nov 10, 2026

0-2 days

~244 m

Insufficient data

Ville-MarieBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

Nov 9, 2026 → Nov 11, 2026

0-2 days

~61 m

Insufficient data

Avg. before construction: 853 (27 days of data)

Le Plateau-Mont-RoyalBlockedÉgouts et aqueducs - Excavation

Nov 3, 2026 → Nov 8, 2026

3-14 days

~223 m

+10.1% vs before

Likely increase

Avg. before construction: 1,735 (28 days of data)

Avg. during construction: 1,911 (5 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 27, 2026 → Nov 9, 2026

3-14 days

~899 m

-40.7% vs before

Likely decrease

Avg. before construction: 771 (28 days of data)

Avg. during construction: 458 (6 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedS-3 Infrastructure souterraine majeure - Massifs et conduits

Nov 8, 2026 → Nov 11, 2026

3-14 days

~1,113 m

Insufficient data

Avg. before construction: 294 (28 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation sans excavation

Apr 23, 2026 → Nov 13, 2026

180+ days

~38 m

+184.5% vs before

Likely increase

Avg. before construction: 605 (28 days of data)

Avg. during construction: 1,721 (173 days of data)

Mercier-Hochelaga-MaisonneuveBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

Nov 8, 2026 → Nov 16, 2026

3-14 days

~539 m

Insufficient data

Avg. before construction: 409 (28 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Nov 7, 2026 → Nov 28, 2026

15-60 days

~601 m

Insufficient data

Ahuntsic-CartiervilleBlockedEntretien

Nov 9, 2026 → Nov 10, 2026

0-2 days

~1,959 m

Insufficient data

Ville-MarieBlockedS-3 Infrastructure souterraine majeure - Réseaux de gaz

Sep 27, 2026 → Dec 18, 2026

61-180 days

~692 m

Insufficient data

Avg. before construction: 0 (25 days of data)

Avg. during construction: 0 (42 days of data)

Ville-MarieBlockedPuits d'accès - Construction/réparation

Nov 8, 2026 → Dec 18, 2026

15-60 days

~301 m

Insufficient data

Avg. before construction: 1,535 (28 days of data)

Ahuntsic-CartiervilleBlockedFeux de signalisation - Ajout/réparation

Oct 6, 2026 → Nov 9, 2026

15-60 days

~1,679 m

Insufficient data

Ahuntsic-CartiervilleBlockedFeux de signalisation - Ajout/réparation

Oct 6, 2026 → Nov 9, 2026

15-60 days

~1,679 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Oct 4, 2026 → Nov 9, 2026

15-60 days

~1,292 m

-47.3% vs before

Likely decrease

Avg. before construction: 1,271 (28 days of data)

Avg. during construction: 670 (29 days of data)

Pierrefonds-RoxboroBlockedConstruction/rénovation avec excavation

Oct 25, 2026 → Dec 31, 2026

61-180 days

~6,158 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedToiture - Rénovation

Nov 8, 2026 → Nov 9, 2026

0-2 days

~277 m

Insufficient data

Montréal-NordBlockedAutre

Nov 3, 2026 → Nov 11, 2026

3-14 days

~3,477 m

-21% vs before

Likely decrease

Avg. before construction: 170 (28 days of data)

Avg. during construction: 134 (5 days of data)

Mercier-Hochelaga-MaisonneuveBlockedAutre

Oct 30, 2026 → Nov 13, 2026

3-14 days

~1,781 m

-12.6% vs before

Likely decrease

Avg. before construction: 338 (28 days of data)

Avg. during construction: 296 (9 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

Le Plateau-Mont-RoyalBlockedS-1 Infrastructure souterraine existante

Nov 8, 2026 → Nov 12, 2026

3-14 days

~259 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedEntretien

Nov 8, 2026 → Nov 9, 2026

0-2 days

~279 m

Insufficient data

Avg. before construction: 165 (28 days of data)

Ahuntsic-CartiervilleBlockedEntretien

Nov 10, 2026 → Nov 11, 2026

0-2 days

~800 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ahuntsic-CartiervilleBlockedAutre

Nov 8, 2026 → Mar 31, 2027

61-180 days

~144 m

Insufficient data

Le Plateau-Mont-RoyalBlockedEntretien

Nov 9, 2026 → Nov 10, 2026

0-2 days

~1,010 m

Insufficient data

Avg. before construction: 1,478 (27 days of data)

Ahuntsic-CartiervilleBlockedTrottoirs - Construction

Sep 28, 2026 → Nov 13, 2026

15-60 days

~1,388 m

-33.5% vs before

Likely decrease

Avg. before construction: 1,210 (26 days of data)

Avg. during construction: 805 (7 days of data)

LachineBlockedConstruction/rénovation sans excavation

Nov 1, 2026 → Dec 1, 2026

15-60 days

~5,062 m

-23.1% vs before

Likely decrease

Avg. before construction: 603 (28 days of data)

Avg. during construction: 464 (7 days of data)

Ahuntsic-CartiervilleBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

Nov 8, 2026 → Jan 8, 2027

61-180 days

~132 m

Insufficient data

Ville-MarieObstructedÉgouts et aqueducs - Réhabilitation

Oct 21, 2026 → Nov 22, 2026

15-60 days

~755 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Excavation

Oct 21, 2026 → Nov 22, 2026

15-60 days

~787 m

Insufficient data

Rosemont-La Petite-PatrieObstructedS-3 Infrastructure souterraine majeure - Massifs et conduits

Oct 30, 2026 → Dec 18, 2026

15-60 days

~1,042 m

-8.7% vs before

Likely decrease

Avg. before construction: 1,543 (28 days of data)

Avg. during construction: 1,410 (9 days of data)

Rosemont-La Petite-PatrieObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 2, 2026 → Dec 18, 2026

61-180 days

~623 m

-7.8% vs before

Likely stable

Avg. before construction: 2,110 (28 days of data)

Avg. during construction: 1,945 (88 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Nov 2, 2026 → Dec 18, 2026

15-60 days

~1,435 m

Insufficient data

Le Sud-OuestBlockedEntretien

Nov 8, 2026 → Nov 9, 2026

0-2 days

~940 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~889 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Nov 3, 2026 → Nov 11, 2026

3-14 days

~731 m

Insufficient data

Ahuntsic-CartiervilleBlockedFeux de signalisation - Ajout/réparation

Oct 6, 2026 → Nov 9, 2026

15-60 days

~1,679 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Nov 8, 2026 → Nov 9, 2026

0-2 days

~246 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Nov 10, 2026 → Nov 11, 2026

0-2 days

~246 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Le Sud-OuestObstructedConstruction/rénovation avec excavation

Sep 27, 2026 → Nov 12, 2026

15-60 days

~996 m

Insufficient data

Pierrefonds-RoxboroBlockedRéseaux routier - Réfection et travaux corrélatifs

Oct 26, 2026 → Nov 21, 2026

15-60 days

~4,217 m

Insufficient data

AnjouObstructedAutre

Jan 10, 2026 → Dec 11, 2026

180+ days

~3,171 m

+1,006.2% vs before

Likely increase

Avg. before construction: 34 (28 days of data)

Avg. during construction: 377 (292 days of data)

Rosemont-La Petite-PatrieObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 2, 2026 → Dec 18, 2026

61-180 days

~623 m

-7.8% vs before

Likely stable

Avg. before construction: 2,110 (28 days of data)

Avg. during construction: 1,945 (88 days of data)

Le Sud-OuestObstructedConstruction/rénovation avec excavation

May 30, 2026 → Dec 18, 2026

180+ days

~992 m

Insufficient data

Le Sud-OuestObstructedAutre

Nov 8, 2026 → Nov 12, 2026

3-14 days

~341 m

Insufficient data

Ahuntsic-CartiervilleObstructedAutre

Nov 8, 2026 → Nov 13, 2026

3-14 days

~1,214 m

Insufficient data

Rosemont-La Petite-PatrieObstructedS-3 Infrastructure souterraine majeure - Puits d'accès

Sep 20, 2026 → Nov 13, 2026

15-60 days

~1,048 m

-25% vs before

Likely decrease

Avg. before construction: 2,284 (18 days of data)

Avg. during construction: 1,712 (49 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Nov 13, 2026

15-60 days

~795 m

-37.6% vs before

Likely decrease

Avg. before construction: 1,037 (28 days of data)

Avg. during construction: 647 (21 days of data)

Le Sud-OuestObstructedConstruction/rénovation avec excavation

Sep 22, 2026 → Nov 20, 2026

15-60 days

~1,190 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedÉgouts et aqueducs - Excavation

Sep 27, 2026 → Nov 30, 2026

61-180 days

~428 m

-9.2% vs before

Likely decrease

Avg. before construction: 292 (25 days of data)

Avg. during construction: 265 (42 days of data)

Mercier-Hochelaga-MaisonneuveObstructedS-3 Infrastructure souterraine majeure - Massifs et conduits

Nov 8, 2026 → Dec 18, 2026

15-60 days

~1,335 m

Insufficient data

Avg. before construction: 409 (28 days of data)

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation avec excavation

Nov 8, 2026 → Nov 12, 2026

3-14 days

~1,632 m

Insufficient data

Avg. before construction: 409 (28 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,340 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,431 m

Insufficient data

Le Sud-OuestObstructedAutre

Nov 10, 2026 → Nov 11, 2026

0-2 days

~433 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Inspection et nettoyage

Nov 8, 2026 → Nov 13, 2026

3-14 days

~844 m

Insufficient data

Avg. before construction: 130 (28 days of data)

St-LaurentObstructedTrottoirs - Construction

Nov 3, 2026 → Nov 13, 2026

3-14 days

~4,000 m

Insufficient data

Pierrefonds-RoxboroObstructedConstruction/rénovation avec excavation

Aug 29, 2026 → Nov 14, 2026

61-180 days

~6,248 m

Insufficient data

Pierrefonds-RoxboroObstructedConstruction/rénovation avec excavation

Aug 29, 2026 → Nov 14, 2026

61-180 days

~6,717 m

Insufficient data

Ville-MarieObstructedConstruction/rénovation sans excavation

Oct 25, 2026 → Nov 14, 2026

15-60 days

~73 m

-16% vs before

Likely decrease

Avg. before construction: 994 (28 days of data)

Avg. during construction: 835 (14 days of data)

Rosemont-La Petite-PatrieObstructedTrottoirs - Construction

Oct 11, 2026 → Nov 18, 2026

15-60 days

~665 m

-26.9% vs before

Likely decrease

Avg. before construction: 4,085 (28 days of data)

Avg. during construction: 2,984 (28 days of data)

Le Sud-OuestObstructedÉgouts et aqueducs - Excavation

Oct 17, 2026 → Nov 18, 2026

15-60 days

~1,025 m

Insufficient data

Rosemont-La Petite-PatrieObstructedTrottoirs - Construction

Oct 11, 2026 → Nov 18, 2026

15-60 days

~1,366 m

-27.3% vs before

Likely decrease

Avg. before construction: 404 (28 days of data)

Avg. during construction: 294 (28 days of data)

Ville-MarieObstructedÉgouts et aqueducs - Réhabilitation

Oct 18, 2026 → Dec 18, 2026

61-180 days

~508 m

Insufficient data

LachineObstructedInspection

Nov 3, 2026 → Nov 10, 2026

3-14 days

~3,827 m

-25.7% vs before

Likely decrease

Avg. before construction: 607 (28 days of data)

Avg. during construction: 451 (5 days of data)

Pierrefonds-RoxboroObstructedAutre

Oct 12, 2026 → Nov 13, 2026

15-60 days

~2,715 m

Insufficient data

St-LaurentObstructedTrottoirs - Construction

Nov 3, 2026 → Nov 13, 2026

3-14 days

~5,033 m

+9.9% vs before

Likely increase

Avg. before construction: 1,355 (28 days of data)

Avg. during construction: 1,489 (5 days of data)

St-LaurentObstructedTrottoirs - Construction

Nov 3, 2026 → Nov 13, 2026

3-14 days

~4,873 m

+9.9% vs before

Likely increase

Avg. before construction: 1,355 (28 days of data)

Avg. during construction: 1,489 (5 days of data)

Le Sud-OuestObstructedÉgouts et aqueducs - Inspection et nettoyage

Oct 25, 2026 → Nov 15, 2026

15-60 days

~736 m

-6.9% vs before

Likely stable

Avg. before construction: 1,543 (28 days of data)

Avg. during construction: 1,437 (14 days of data)

Le Plateau-Mont-RoyalObstructedÉgouts et aqueducs - Excavation

Sep 27, 2026 → Nov 30, 2026

61-180 days

~392 m

-25.6% vs before

Likely decrease

Avg. before construction: 3,230 (25 days of data)

Avg. during construction: 2,401 (42 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedAutre

Nov 9, 2026 → Nov 10, 2026

0-2 days

~1,632 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionObstructedAutre

Aug 16, 2026 → Nov 16, 2026

61-180 days

~398 m

-14.4% vs before

Likely decrease

Avg. before construction: 1,431 (28 days of data)

Avg. during construction: 1,225 (74 days of data)

Rosemont-La Petite-PatrieObstructedAutre

Nov 5, 2026 → Nov 9, 2026

3-14 days

~2,052 m

Insufficient data

Avg. before construction: 299 (28 days of data)

Avg. during construction: 255 (3 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedConstruction/rénovation avec excavation

Aug 17, 2026 → Jan 29, 2027

61-180 days

~936 m

-23.3% vs before

Likely decrease

Avg. before construction: 147,859 (28 days of data)

Avg. during construction: 113,467 (62 days of data)

Rosemont-La Petite-PatrieObstructedFeux de signalisation - Ajout/réparation

Nov 10, 2026 → Nov 12, 2026

0-2 days

~122 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

St-LaurentObstructedTrottoirs - Construction

Nov 3, 2026 → Nov 13, 2026

3-14 days

~4,325 m

Insufficient data

Pierrefonds-RoxboroObstructedAutre

Oct 12, 2026 → Nov 13, 2026

15-60 days

~3,837 m

Insufficient data

Pierrefonds-RoxboroObstructedAutre

Oct 12, 2026 → Nov 13, 2026

15-60 days

~6,373 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionObstructedToiture - Rénovation

Nov 8, 2026 → Nov 9, 2026

0-2 days

~273 m

Insufficient data

Le Plateau-Mont-RoyalObstructedToiture - Rénovation

Nov 8, 2026 → Nov 9, 2026

0-2 days

~19 m

Insufficient data

Montréal-NordObstructedAutre

Nov 10, 2026 → Nov 17, 2026

3-14 days

~3,477 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation sans excavation

Oct 29, 2026 → Nov 8, 2026

3-14 days

~78 m

-15.2% vs before

Likely decrease

Avg. before construction: 232 (28 days of data)

Avg. during construction: 196 (10 days of data)

Le Plateau-Mont-RoyalObstructedTrottoirs - Construction

Oct 18, 2026 → Nov 14, 2026

15-60 days

~397 m

Insufficient data

Ville-MarieObstructedConstruction/rénovation sans excavation

Sep 13, 2026 → Nov 20, 2026

61-180 days

~280 m

-32.8% vs before

Likely decrease

Avg. before construction: 982 (18 days of data)

Avg. during construction: 660 (56 days of data)

Ville-MarieBlockedAS-2 Réseau aérosouterrain existant

Nov 3, 2026 → Nov 10, 2026

3-14 days

~395 m

Insufficient data

Le Plateau-Mont-RoyalObstructedConstruction/rénovation sans excavation

Jun 24, 2026 → Nov 27, 2026

61-180 days

~384 m

Insufficient data

Le Sud-OuestObstructedConstruction/rénovation sans excavation

Oct 17, 2026 → Jan 18, 2027

61-180 days

~1,203 m

-16.1% vs before

Likely decrease

Avg. before construction: 530 (28 days of data)

Avg. during construction: 444 (22 days of data)

Ahuntsic-CartiervilleObstructedTrottoirs - Construction

Jun 25, 2026 → Nov 29, 2026

61-180 days

~764 m

-4% vs before

Likely stable

Avg. before construction: 199 (28 days of data)

Avg. during construction: 191 (126 days of data)

Villeray-Saint-Michel-Parc-ExtensionObstructedAutre

Oct 18, 2026 → Feb 20, 2027

61-180 days

~304 m

-17.3% vs before

Likely decrease

Avg. before construction: 796 (28 days of data)

Avg. during construction: 658 (21 days of data)

Villeray-Saint-Michel-Parc-ExtensionObstructedAutre

Oct 18, 2026 → Feb 20, 2027

61-180 days

~304 m

-17.3% vs before

Likely decrease

Avg. before construction: 796 (28 days of data)

Avg. during construction: 658 (21 days of data)

Rosemont-La Petite-PatrieObstructedÉgouts et aqueducs - Excavation

Nov 5, 2026 → Nov 19, 2026

3-14 days

~630 m

Insufficient data

Avg. before construction: 1,025 (15 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~889 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,064 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,064 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,198 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 2, 2026 → Nov 10, 2026

3-14 days

~1,340 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionObstructedConstruction/rénovation sans excavation

Mar 22, 2026 → Nov 13, 2026

180+ days

~96 m

+335.7% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 939 (221 days of data)

Le Plateau-Mont-RoyalObstructedAutre

Nov 2, 2026 → Dec 9, 2026

15-60 days

~113 m

-8.2% vs before

Likely decrease

Avg. before construction: 2,224 (28 days of data)

Avg. during construction: 2,041 (6 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 8, 2026 → Nov 13, 2026

3-14 days

~240 m

Insufficient data

Avg. before construction: 294 (28 days of data)

Ville-MarieObstructedEntretien

Nov 9, 2026 → Nov 10, 2026

0-2 days

~464 m

Insufficient data

Le Sud-OuestObstructedConstruction/rénovation sans excavation

Nov 9, 2026 → Nov 10, 2026

0-2 days

~351 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 8, 2026 → Nov 10, 2026

0-2 days

~541 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 9, 2026 → Nov 11, 2026

0-2 days

~566 m

Insufficient data

Avg. before construction: 1,478 (27 days of data)

Le Plateau-Mont-RoyalObstructedAutre

Oct 7, 2026 → Nov 13, 2026

15-60 days

~50 m

Insufficient data

Avg. before construction: 2,904 (28 days of data)

Avg. during construction: 352 (2 days of data)

Le Plateau-Mont-RoyalObstructedAutre

Oct 7, 2026 → Nov 13, 2026

15-60 days

~50 m

Insufficient data

Avg. before construction: 2,904 (28 days of data)

Avg. during construction: 352 (2 days of data)

Rosemont-La Petite-PatrieObstructedAutre

Nov 5, 2026 → Nov 9, 2026

3-14 days

~2,052 m

Insufficient data

Avg. before construction: 299 (28 days of data)

Avg. during construction: 255 (3 days of data)

Villeray-Saint-Michel-Parc-ExtensionObstructedConstruction/rénovation avec excavation

Nov 1, 2026 → Nov 12, 2026

3-14 days

~1,077 m

-44.9% vs before

Likely decrease

Avg. before construction: 718 (28 days of data)

Avg. during construction: 395 (7 days of data)

Mercier-Hochelaga-MaisonneuveObstructedAutre

Oct 30, 2026 → Nov 13, 2026

3-14 days

~1,781 m

-12.6% vs before

Likely decrease

Avg. before construction: 338 (28 days of data)

Avg. during construction: 296 (9 days of data)

Mercier-Hochelaga-MaisonneuveObstructedAutre

Oct 30, 2026 → Nov 13, 2026

3-14 days

~1,781 m

-12.6% vs before

Likely decrease

Avg. before construction: 338 (28 days of data)

Avg. during construction: 296 (9 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Nov 10, 2026 → Nov 20, 2026

3-14 days

~977 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Pierrefonds-RoxboroObstructedAutre

Oct 12, 2026 → Nov 13, 2026

15-60 days

~1,519 m

Insufficient data

VerdunObstructedConstruction/rénovation sans excavation

Oct 22, 2026 → Nov 13, 2026

15-60 days

~605 m

-11.2% vs before

Likely decrease

Avg. before construction: 496 (28 days of data)

Avg. during construction: 440 (17 days of data)

Rosemont-La Petite-PatrieObstructedÉgouts et aqueducs - Réhabilitation

Nov 1, 2026 → Nov 21, 2026

15-60 days

~955 m

Insufficient data

Le Sud-OuestObstructedAutre

Mar 3, 2024 → Dec 23, 2026

180+ days

~661 m

+434.7% vs before

Likely increase

Avg. before construction: 257 (28 days of data)

Avg. during construction: 1,376 (970 days of data)

Mercier-Hochelaga-MaisonneuveObstructedÉgouts et aqueducs - Inspection et nettoyage

Nov 1, 2026 → Nov 13, 2026

3-14 days

~1,465 m

-5% vs before

Likely stable

Avg. before construction: 328 (28 days of data)

Avg. during construction: 311 (7 days of data)

Le Sud-OuestObstructedConstruction/rénovation avec excavation

Oct 16, 2026 → Nov 20, 2026

15-60 days

~935 m

Insufficient data