Construction Impact

Track active roadwork that affects bike paths and likely impact on bike traffic.

Source: Ville de Montreal - active construction permits with bike path impacts, updated daily.Snapshot date:Oct 21, 2026

Total Affected

248

Distinct construction zones impacting a bike path

Bike Paths Blocked

140

Fully closed to cyclists - requires detour

Bike Paths Obstructed

108

Partially obstructed - reduced width or shared lane

Status
AllBlockedObstructed
Borough
Reason
Duration
All0-2 days3-14 days15-60 days61-180 days180+ days

Active Bike Path Blockages(248)

Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.

StreetBoroughStatusReasonDurationNearest CounterVolume Impact
Le Sud-OuestBlockedÉgouts et aqueducs - Excavation

Oct 12, 2026 → Oct 21, 2026

3-14 days

~741 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Aug 16, 2026 → Oct 21, 2026

61-180 days

~741 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 12, 2026 → Oct 23, 2026

61-180 days

~4,628 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 12, 2026 → Oct 23, 2026

61-180 days

~4,648 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Jul 13, 2026 → Oct 23, 2026

61-180 days

~4,530 m

Insufficient data

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Excavation

Aug 16, 2026 → Oct 26, 2026

61-180 days

~364 m

Insufficient data

Rosemont-La Petite-PatrieBlockedAutre

Oct 19, 2026 → Oct 30, 2026

3-14 days

~1,310 m

Insufficient data

Le Sud-OuestBlockedTrottoirs - Construction

Sep 29, 2026 → Oct 30, 2026

15-60 days

~781 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 11, 2026 → Oct 30, 2026

180+ days

~283 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 11, 2026 → Oct 30, 2026

180+ days

~206 m

Insufficient data

St-LaurentBlockedÉgouts et aqueducs - Excavation

Aug 1, 2026 → Oct 31, 2026

61-180 days

~1,587 m

+6% vs before

Likely stable

Avg. before construction: 1,230 (28 days of data)

Avg. during construction: 1,304 (22 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Aug 27, 2026 → Oct 31, 2026

61-180 days

~1,247 m

Insufficient data

Avg. before construction: 494 (24 days of data)

Ville-MarieBlockedConstruction/rénovation sans excavation

Mar 8, 2026 → Oct 31, 2026

180+ days

~47 m

+588% vs before

Likely increase

Avg. before construction: 149 (28 days of data)

Avg. during construction: 1,025 (168 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,340 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedÉgouts et aqueducs - Excavation

Aug 31, 2026 → Nov 6, 2026

61-180 days

~2,553 m

Insufficient data

Avg. before construction: 652 (20 days of data)

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Oct 15, 2026 → Nov 7, 2026

15-60 days

~1,911 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Nov 13, 2026

180+ days

~79 m

+357.9% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 986 (154 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Nov 13, 2026

180+ days

~71 m

+357.9% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 986 (154 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Jun 1, 2026 → Nov 13, 2026

61-180 days

~170 m

+14.3% vs before

Likely increase

Avg. before construction: 1,676 (28 days of data)

Avg. during construction: 1,916 (83 days of data)

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Oct 21, 2026 → Nov 21, 2026

15-60 days

~743 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Oct 21, 2026 → Nov 21, 2026

15-60 days

~743 m

Insufficient data

Le Sud-OuestBlockedÉgouts et aqueducs - Excavation

Oct 21, 2026 → Nov 22, 2026

15-60 days

~787 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Sep 17, 2026 → Nov 27, 2026

61-180 days

~909 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jun 4, 2026 → Dec 11, 2026

180+ days

~258 m

Insufficient data

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Excavation

Aug 2, 2026 → Dec 11, 2026

61-180 days

~2,745 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Oct 12, 2026 → Dec 18, 2026

61-180 days

~213 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Oct 12, 2026 → Dec 18, 2026

61-180 days

~213 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Aug 25, 2026 → May 1, 2027

180+ days

~35 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Jun 10, 2026 → Jun 11, 2027

180+ days

~594 m

+9% vs before

Likely increase

Avg. before construction: 1,279 (28 days of data)

Avg. during construction: 1,394 (74 days of data)

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Sep 29, 2026 → Oct 31, 2026

15-60 days

~1,655 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Sep 27, 2026 → Nov 14, 2026

15-60 days

~2,374 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedAutre

Oct 18, 2026 → Feb 20, 2027

61-180 days

~304 m

Insufficient data

Le Plateau-Mont-RoyalBlockedConstruction/rénovation sans excavation

Jun 14, 2026 → Oct 31, 2027

180+ days

~251 m

Insufficient data

Le Plateau-Mont-RoyalBlockedS-3 Infrastructure souterraine majeure - Massifs et conduits

Oct 12, 2026 → Oct 21, 2026

3-14 days

~441 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,431 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~889 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,064 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,198 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedEntretien

Oct 19, 2026 → Oct 20, 2026

0-2 days

~2,128 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedEntretien

Oct 19, 2026 → Oct 20, 2026

0-2 days

~1,388 m

Insufficient data

VerdunBlockedEntretien

Oct 19, 2026 → Oct 20, 2026

0-2 days

~379 m

Insufficient data

Ville-MarieBlockedTrottoirs - Construction

Oct 12, 2026 → Oct 21, 2026

3-14 days

~29 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Sep 30, 2026 → Oct 23, 2026

15-60 days

~307 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz

Oct 12, 2026 → Oct 23, 2026

3-14 days

~1,480 m

Insufficient data

Montréal-NordBlockedConstruction/rénovation avec excavation

Sep 30, 2026 → Oct 30, 2026

15-60 days

~1,378 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Aug 27, 2026 → Oct 31, 2026

61-180 days

~1,247 m

Insufficient data

Avg. before construction: 494 (24 days of data)

Ahuntsic-CartiervilleBlockedTrottoirs - Construction

Sep 28, 2026 → Nov 13, 2026

15-60 days

~1,388 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation sans excavation

Sep 24, 2026 → Nov 27, 2026

61-180 days

~745 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Sep 20, 2026 → Dec 11, 2026

61-180 days

~809 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Sep 20, 2026 → Dec 11, 2026

61-180 days

~809 m

Insufficient data

Ahuntsic-CartiervilleBlockedAutre

Oct 1, 2026 → Dec 31, 2026

61-180 days

~173 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jul 17, 2026 → Dec 31, 2026

61-180 days

~306 m

Insufficient data

OutremontBlockedAutre

Oct 18, 2026 → Oct 23, 2026

3-14 days

~394 m

Insufficient data

Rosemont-La Petite-PatrieBlockedÉgouts et aqueducs - Excavation

Oct 15, 2026 → Oct 23, 2026

3-14 days

~636 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Oct 23, 2026

3-14 days

~249 m

Insufficient data

Montréal-NordBlockedTrottoirs - Construction

Oct 6, 2026 → Oct 23, 2026

15-60 days

~2,947 m

Insufficient data

Montréal-NordBlockedConstruction/rénovation avec excavation

Oct 18, 2026 → Oct 23, 2026

3-14 days

~861 m

Insufficient data

VerdunBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions

Oct 4, 2026 → Oct 23, 2026

15-60 days

~243 m

Insufficient data

Ville-MarieBlockedRéseaux routier - Réfection et travaux corrélatifs

Oct 16, 2026 → Oct 23, 2026

3-14 days

~153 m

Insufficient data

Le Plateau-Mont-RoyalBlockedAutre

Oct 12, 2026 → Oct 27, 2026

15-60 days

~151 m

Insufficient data

Ville-MarieBlockedRéseaux routier - Réfection et travaux corrélatifs

Oct 18, 2026 → Oct 28, 2026

3-14 days

~528 m

Insufficient data

Le Sud-OuestBlockedTrottoirs - Construction

Oct 11, 2026 → Nov 9, 2026

15-60 days

~721 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Sep 27, 2026 → Nov 14, 2026

15-60 days

~2,374 m

Insufficient data

Rosemont-La Petite-PatrieBlockedAutre

Oct 18, 2026 → Nov 20, 2026

15-60 days

~274 m

Insufficient data

Ahuntsic-CartiervilleBlockedEntretien

Oct 19, 2026 → Oct 20, 2026

0-2 days

~1,183 m

Insufficient data

Le Sud-OuestBlockedEntretien

Oct 19, 2026 → Oct 20, 2026

0-2 days

~961 m

Insufficient data

Ahuntsic-CartiervilleBlockedToiture - Rénovation

Oct 19, 2026 → Oct 21, 2026

0-2 days

~1,039 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Jul 13, 2026 → Oct 23, 2026

61-180 days

~4,530 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Nov 13, 2026

180+ days

~92 m

+357.9% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 986 (154 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,758 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,758 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Oct 12, 2026 → Oct 20, 2026

3-14 days

~640 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Oct 12, 2026 → Oct 20, 2026

3-14 days

~696 m

Insufficient data

Le Plateau-Mont-RoyalBlockedAutre

Oct 18, 2026 → Oct 30, 2026

3-14 days

~426 m

Insufficient data

Montréal-NordBlockedConstruction/rénovation avec excavation

Oct 20, 2026 → Nov 6, 2026

15-60 days

~2,844 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Jun 1, 2026 → Nov 13, 2026

61-180 days

~170 m

+14.3% vs before

Likely increase

Avg. before construction: 1,676 (28 days of data)

Avg. during construction: 1,916 (83 days of data)

Le Plateau-Mont-RoyalBlockedConstruction/rénovation avec excavation

Sep 26, 2026 → Mar 31, 2028

180+ days

~767 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedEntretien

Oct 19, 2026 → Oct 20, 2026

0-2 days

~1,648 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation sans excavation

Oct 18, 2026 → Oct 20, 2026

0-2 days

~1,041 m

Insufficient data

Le Plateau-Mont-RoyalBlockedEntretien

Oct 20, 2026 → Oct 21, 2026

0-2 days

~576 m

Insufficient data

L'Île-Bizard-Sainte-GenevièveBlockedEntretien

Oct 20, 2026 → Oct 21, 2026

0-2 days

~2,647 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Oct 20, 2026 → Oct 22, 2026

0-2 days

~348 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedAutre

Sep 13, 2026 → Oct 23, 2026

15-60 days

~701 m

Insufficient data

Avg. before construction: 644 (7 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Oct 23, 2026

3-14 days

~795 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Oct 23, 2026

3-14 days

~898 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Oct 23, 2026

3-14 days

~795 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Oct 23, 2026

3-14 days

~898 m

Insufficient data

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Excavation

Oct 1, 2026 → Oct 23, 2026

15-60 days

~2,680 m

Insufficient data

Ahuntsic-CartiervilleBlockedFeux de signalisation - Ajout/réparation

Oct 20, 2026 → Oct 28, 2026

3-14 days

~1,223 m

Insufficient data

Montréal-NordBlockedConstruction/rénovation sans excavation

Oct 18, 2026 → Oct 30, 2026

3-14 days

~1,118 m

Insufficient data

AnjouBlockedTrottoirs - Construction

Oct 18, 2026 → Oct 31, 2026

3-14 days

~2,683 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation sans excavation

Apr 23, 2026 → Nov 13, 2026

180+ days

~38 m

+200.3% vs before

Likely increase

Avg. before construction: 605 (28 days of data)

Avg. during construction: 1,817 (122 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation sans excavation

Oct 20, 2026 → Oct 22, 2026

0-2 days

~1,256 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedAutre

Sep 23, 2026 → Oct 30, 2026

15-60 days

~1,781 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedAutre

Sep 27, 2026 → Oct 30, 2026

15-60 days

~2,029 m

Insufficient data

Ville-MarieBlockedS-3 Infrastructure souterraine majeure - Réseaux de gaz

Sep 27, 2026 → Dec 18, 2026

61-180 days

~692 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 8, 2026 → Oct 23, 2026

15-60 days

~991 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Oct 4, 2026 → Oct 23, 2026

15-60 days

~1,292 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Oct 17, 2026 → Oct 27, 2026

3-14 days

~67 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedAS-2 Réseau aérosouterrain existant

Sep 30, 2026 → Oct 28, 2026

15-60 days

~1,181 m

Insufficient data

Ahuntsic-CartiervilleBlockedFeux de signalisation - Ajout/réparation

Oct 6, 2026 → Nov 9, 2026

15-60 days

~1,679 m

Insufficient data

Ahuntsic-CartiervilleBlockedFeux de signalisation - Ajout/réparation

Oct 6, 2026 → Nov 9, 2026

15-60 days

~1,679 m

Insufficient data

LachineBlockedConstruction/rénovation sans excavation

Apr 19, 2026 → Oct 31, 2026

180+ days

~6,263 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,875 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

Jun 14, 2026 → Dec 1, 2026

61-180 days

~1,984 m

Insufficient data

Le Plateau-Mont-RoyalBlockedConstruction/rénovation sans excavation

Oct 18, 2026 → Oct 21, 2026

3-14 days

~250 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Oct 6, 2026 → Oct 23, 2026

15-60 days

~4,554 m

Insufficient data

Le Plateau-Mont-RoyalBlockedConstruction/rénovation sans excavation

Oct 15, 2026 → Oct 23, 2026

3-14 days

~463 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Oct 18, 2026 → Oct 26, 2026

3-14 days

~681 m

Insufficient data

Rosemont-La Petite-PatrieBlockedÉgouts et aqueducs - Excavation

Oct 19, 2026 → Oct 20, 2026

0-2 days

~97 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

Sep 5, 2026 → Oct 25, 2026

15-60 days

~1,927 m

Insufficient data

Avg. before construction: 711 (15 days of data)

Ahuntsic-CartiervilleBlockedEntretien

Oct 20, 2026 → Oct 21, 2026

0-2 days

~1,229 m

Insufficient data

Ahuntsic-CartiervilleBlockedTrottoirs - Construction

Sep 28, 2026 → Nov 13, 2026

15-60 days

~1,388 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Oct 8, 2026 → Oct 23, 2026

15-60 days

~685 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Oct 8, 2026 → Oct 23, 2026

15-60 days

~1,452 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Oct 8, 2026 → Oct 23, 2026

15-60 days

~458 m

Insufficient data

Ville-MarieBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz

Oct 11, 2026 → Oct 23, 2026

3-14 days

~401 m

Insufficient data

Rosemont-La Petite-PatrieObstructedAutre

Jul 19, 2026 → Oct 23, 2026

61-180 days

~680 m

Insufficient data

Rosemont-La Petite-PatrieBlockedAutre

Oct 18, 2026 → Oct 31, 2026

3-14 days

~1,148 m

Insufficient data

Rosemont-La Petite-PatrieObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 2, 2026 → Nov 1, 2026

61-180 days

~623 m

+4.1% vs before

Likely stable

Avg. before construction: 2,110 (28 days of data)

Avg. during construction: 2,196 (21 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation sans excavation

Oct 4, 2026 → Nov 2, 2026

15-60 days

~1,431 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Excavation

Oct 21, 2026 → Nov 22, 2026

15-60 days

~787 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~889 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation sans excavation

Oct 19, 2026 → Oct 22, 2026

3-14 days

~1,132 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Oct 18, 2026 → Oct 20, 2026

0-2 days

~246 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Oct 20, 2026 → Oct 22, 2026

0-2 days

~246 m

Insufficient data

LaSalleBlockedTrottoirs - Construction

Oct 8, 2026 → Oct 23, 2026

15-60 days

~4,892 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Oct 22, 2026 → Oct 23, 2026

0-2 days

~246 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Le Plateau-Mont-RoyalObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 2, 2026 → Nov 1, 2026

61-180 days

~622 m

+4.1% vs before

Likely stable

Avg. before construction: 2,110 (28 days of data)

Avg. during construction: 2,196 (21 days of data)

Ahuntsic-CartiervilleBlockedFeux de signalisation - Ajout/réparation

Oct 6, 2026 → Nov 9, 2026

15-60 days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedToiture - Rénovation

Oct 20, 2026 → Oct 21, 2026

0-2 days

~1,185 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedToiture - Rénovation

Oct 22, 2026 → Oct 23, 2026

0-2 days

~1,186 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedAutre

Oct 20, 2026 → Oct 21, 2026

0-2 days

~1,856 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedEntretien

Oct 20, 2026 → Oct 21, 2026

0-2 days

~1,452 m

Insufficient data

Rosemont-La Petite-PatrieBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions

Oct 12, 2026 → Oct 23, 2026

3-14 days

~2,575 m

Insufficient data

Montréal-NordObstructedConstruction/rénovation sans excavation

Mar 31, 2026 → Oct 30, 2026

180+ days

~2,784 m

Insufficient data

Avg. before construction: 0 (17 days of data)

Le Sud-OuestObstructedConstruction/rénovation avec excavation

Sep 27, 2026 → Oct 30, 2026

15-60 days

~1,000 m

Insufficient data

Rosemont-La Petite-PatrieObstructedRéseaux routier - Réfection et travaux corrélatifs

Aug 2, 2026 → Nov 1, 2026

61-180 days

~623 m

+4.1% vs before

Likely stable

Avg. before construction: 2,110 (28 days of data)

Avg. during construction: 2,196 (21 days of data)

AnjouObstructedAutre

Jan 10, 2026 → Nov 11, 2026

180+ days

~3,171 m

+960.3% vs before

Likely increase

Avg. before construction: 34 (28 days of data)

Avg. during construction: 361 (225 days of data)

Le Sud-OuestObstructedConstruction/rénovation avec excavation

May 30, 2026 → Dec 18, 2026

180+ days

~992 m

Insufficient data

Rosemont-La Petite-PatrieObstructedÉgouts et aqueducs - Réhabilitation

Oct 8, 2026 → Oct 21, 2026

3-14 days

~626 m

Insufficient data

Le Plateau-Mont-RoyalObstructedAutre

Sep 20, 2026 → Oct 23, 2026

15-60 days

~1,015 m

Insufficient data

Rosemont-La Petite-PatrieObstructedÉgouts et aqueducs - Excavation

Oct 19, 2026 → Oct 23, 2026

3-14 days

~1,319 m

Insufficient data

Rosemont-La Petite-PatrieObstructedÉgouts et aqueducs - Réhabilitation

Oct 22, 2026 → Oct 28, 2026

3-14 days

~365 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Oct 18, 2026 → Oct 28, 2026

3-14 days

~165 m

Insufficient data

Rosemont-La Petite-PatrieObstructedS-3 Infrastructure souterraine majeure - Puits d'accès

Sep 20, 2026 → Nov 13, 2026

15-60 days

~1,048 m

Insufficient data

Le Sud-OuestObstructedEntretien

Oct 19, 2026 → Oct 20, 2026

0-2 days

~363 m

Insufficient data

Le Sud-OuestObstructedEntretien

Oct 19, 2026 → Oct 20, 2026

0-2 days

~799 m

Insufficient data

Ville-MarieObstructedTrottoirs - Construction

Oct 4, 2026 → Oct 21, 2026

15-60 days

~566 m

Insufficient data

Le Sud-OuestObstructedEntretien

Oct 21, 2026 → Oct 22, 2026

0-2 days

~359 m

Insufficient data

Le Sud-OuestObstructedConstruction/rénovation avec excavation

Sep 22, 2026 → Oct 23, 2026

15-60 days

~1,190 m

Insufficient data

Rosemont-La Petite-PatrieObstructedAutre

Oct 19, 2026 → Oct 30, 2026

3-14 days

~1,310 m

Insufficient data

LaSalleObstructedFeux de signalisation - Ajout/réparation

Oct 18, 2026 → Nov 6, 2026

15-60 days

~2,323 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedÉgouts et aqueducs - Excavation

Sep 27, 2026 → Nov 30, 2026

61-180 days

~428 m

Insufficient data

Ahuntsic-CartiervilleObstructedEntretien

Oct 18, 2026 → Oct 21, 2026

3-14 days

~1,176 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Excavation

Oct 12, 2026 → Oct 21, 2026

3-14 days

~741 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

Oct 12, 2026 → Oct 23, 2026

3-14 days

~795 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedAutre

Sep 13, 2026 → Oct 23, 2026

15-60 days

~701 m

Insufficient data

Avg. before construction: 644 (7 days of data)

AnjouObstructedAutre

Oct 20, 2026 → Oct 26, 2026

3-14 days

~3,339 m

Insufficient data

Rosemont-La Petite-PatrieObstructedTrottoirs - Construction

Oct 12, 2026 → Oct 30, 2026

15-60 days

~1,885 m

Insufficient data

Pierrefonds-RoxboroObstructedConstruction/rénovation avec excavation

Aug 29, 2026 → Oct 31, 2026

61-180 days

~6,717 m

Insufficient data

Pierrefonds-RoxboroObstructedConstruction/rénovation avec excavation

Aug 29, 2026 → Oct 31, 2026

61-180 days

~6,248 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,340 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,431 m

Insufficient data

Rosemont-La Petite-PatrieObstructedTrottoirs - Construction

Oct 11, 2026 → Nov 18, 2026

15-60 days

~665 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Excavation

Oct 17, 2026 → Nov 18, 2026

15-60 days

~1,025 m

Insufficient data

Rosemont-La Petite-PatrieObstructedTrottoirs - Construction

Oct 11, 2026 → Nov 18, 2026

15-60 days

~1,366 m

Insufficient data

Ville-MarieObstructedÉgouts et aqueducs - Réhabilitation

Oct 18, 2026 → Dec 18, 2026

61-180 days

~508 m

Insufficient data

Le Plateau-Mont-RoyalObstructedS-3 Infrastructure souterraine majeure - Massifs et conduits

Oct 12, 2026 → Oct 21, 2026

3-14 days

~441 m

Insufficient data

Ville-MarieObstructedConstruction/rénovation avec excavation

Oct 17, 2026 → Oct 27, 2026

3-14 days

~67 m

Insufficient data

Pierrefonds-RoxboroObstructedFeux de signalisation - Ajout/réparation

Oct 18, 2026 → Oct 30, 2026

3-14 days

~1,856 m

Insufficient data

Pierrefonds-RoxboroObstructedAutre

Oct 12, 2026 → Nov 13, 2026

15-60 days

~2,715 m

Insufficient data

Le Plateau-Mont-RoyalObstructedÉgouts et aqueducs - Excavation

Sep 27, 2026 → Nov 30, 2026

61-180 days

~392 m

Insufficient data

Le Sud-OuestObstructedRéseaux routier - Réfection et travaux corrélatifs

Oct 19, 2026 → Oct 21, 2026

0-2 days

~679 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Oct 20, 2026 → Oct 21, 2026

0-2 days

~435 m

Insufficient data

Rosemont-La Petite-PatrieObstructedEntretien

Oct 20, 2026 → Oct 21, 2026

0-2 days

~687 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

May 12, 2026 → Oct 23, 2026

61-180 days

~4,628 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionObstructedAutre

Aug 16, 2026 → Nov 16, 2026

61-180 days

~398 m

+6.6% vs before

Likely stable

Avg. before construction: 1,431 (28 days of data)

Avg. during construction: 1,526 (7 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedÉgouts et aqueducs - Excavation

Oct 20, 2026 → Oct 26, 2026

3-14 days

~2,085 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedConstruction/rénovation avec excavation

Aug 17, 2026 → Oct 30, 2026

61-180 days

~936 m

-23.3% vs before

Likely decrease

Avg. before construction: 147,859 (28 days of data)

Avg. during construction: 113,467 (62 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedToiture - Rénovation

Oct 19, 2026 → Oct 21, 2026

0-2 days

~1,602 m

Insufficient data

Ville-MarieObstructedFeux de signalisation - Ajout/réparation

Oct 20, 2026 → Oct 21, 2026

0-2 days

~244 m

Insufficient data

Montréal-NordObstructedConstruction/rénovation avec excavation

Oct 4, 2026 → Oct 23, 2026

15-60 days

~3,935 m

Insufficient data

AnjouObstructedAutre

Sep 21, 2026 → Oct 22, 2026

15-60 days

~3,137 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation sans excavation

Oct 18, 2026 → Oct 23, 2026

3-14 days

~1,623 m

Insufficient data

Le Plateau-Mont-RoyalObstructedRéseaux routier - Réfection et travaux corrélatifs

Oct 14, 2026 → Oct 23, 2026

3-14 days

~815 m

Insufficient data

Pierrefonds-RoxboroObstructedTrottoirs - Construction

Oct 6, 2026 → Oct 28, 2026

15-60 days

~3,801 m

Insufficient data

Montréal-NordObstructedPuits d'accès - Inspection

Oct 22, 2026 → Oct 30, 2026

3-14 days

~1,108 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Le Plateau-Mont-RoyalObstructedConstruction/rénovation sans excavation

Oct 6, 2026 → Nov 3, 2026

15-60 days

~504 m

Insufficient data

Pierrefonds-RoxboroObstructedAutre

Oct 12, 2026 → Nov 13, 2026

15-60 days

~3,837 m

Insufficient data

Pierrefonds-RoxboroObstructedAutre

Oct 12, 2026 → Nov 13, 2026

15-60 days

~6,373 m

Insufficient data

Rosemont-La Petite-PatrieObstructedTrottoirs - Construction

Oct 12, 2026 → Oct 30, 2026

15-60 days

~1,885 m

Insufficient data

Rosemont-La Petite-PatrieObstructedÉgouts et aqueducs - Réhabilitation

Oct 15, 2026 → Oct 20, 2026

3-14 days

~595 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Inspection et nettoyage

Oct 12, 2026 → Oct 22, 2026

3-14 days

~848 m

Insufficient data

Ville-MarieObstructedÉgouts et aqueducs - Excavation

Oct 16, 2026 → Oct 23, 2026

3-14 days

~611 m

Insufficient data

Rosemont-La Petite-PatrieObstructedÉgouts et aqueducs - Réhabilitation

Oct 18, 2026 → Oct 23, 2026

3-14 days

~1,188 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation sans excavation

Oct 16, 2026 → Oct 24, 2026

3-14 days

~83 m

Insufficient data

St-LaurentObstructedAutre

Aug 31, 2026 → Oct 30, 2026

15-60 days

~2,231 m

Insufficient data

Avg. before construction: 1,338 (20 days of data)

Montréal-NordObstructedConstruction/rénovation avec excavation

Oct 4, 2026 → Oct 23, 2026

15-60 days

~3,935 m

Insufficient data

St-LaurentObstructedTrottoirs - Construction

Sep 27, 2026 → Nov 6, 2026

15-60 days

~1,543 m

Insufficient data

Le Plateau-Mont-RoyalObstructedConstruction/rénovation sans excavation

Jun 24, 2026 → Nov 27, 2026

61-180 days

~384 m

Insufficient data

Le Sud-OuestObstructedConstruction/rénovation sans excavation

Oct 17, 2026 → Jan 18, 2027

61-180 days

~1,203 m

Insufficient data

St-LaurentObstructedAutre

Sep 27, 2026 → Oct 24, 2026

15-60 days

~5,388 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation sans excavation

Oct 12, 2026 → Oct 28, 2026

15-60 days

~1,483 m

Insufficient data

Le Plateau-Mont-RoyalObstructedTrottoirs - Construction

Oct 18, 2026 → Oct 30, 2026

3-14 days

~398 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedConstruction/rénovation sans excavation

Sep 13, 2026 → Oct 30, 2026

15-60 days

~189 m

Insufficient data

Ahuntsic-CartiervilleObstructedTrottoirs - Construction

Jun 25, 2026 → Oct 31, 2026

61-180 days

~764 m

+12.8% vs before

Likely increase

Avg. before construction: 199 (28 days of data)

Avg. during construction: 225 (59 days of data)

Ville-MarieObstructedConstruction/rénovation sans excavation

Sep 13, 2026 → Nov 6, 2026

15-60 days

~280 m

Insufficient data

Avg. before construction: 1,043 (7 days of data)

Villeray-Saint-Michel-Parc-ExtensionObstructedAutre

Oct 18, 2026 → Feb 20, 2027

61-180 days

~304 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionObstructedAutre

Oct 18, 2026 → Feb 20, 2027

61-180 days

~304 m

Insufficient data

Ville-MarieObstructedAutre

Sep 30, 2026 → Oct 31, 2026

15-60 days

~279 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedEntretien

Oct 20, 2026 → Oct 21, 2026

0-2 days

~757 m

Insufficient data

OutremontObstructedAutre

Oct 18, 2026 → Oct 22, 2026

3-14 days

~549 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~889 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,064 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,064 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,198 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

Oct 21, 2026 → Nov 3, 2026

3-14 days

~1,340 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionObstructedConstruction/rénovation sans excavation

Mar 22, 2026 → Nov 13, 2026

180+ days

~96 m

+357.9% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 986 (154 days of data)

Rosemont-La Petite-PatrieObstructedEntretien

Oct 22, 2026 → Oct 25, 2026

3-14 days

~566 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Le Plateau-Mont-RoyalObstructedÉgouts et aqueducs - Excavation

Oct 19, 2026 → Nov 5, 2026

15-60 days

~312 m

Insufficient data

St-LaurentObstructedAutre

Oct 12, 2026 → Oct 23, 2026

3-14 days

~3,536 m

Insufficient data

St-LaurentObstructedTrottoirs - Construction

Oct 13, 2026 → Oct 30, 2026

15-60 days

~3,317 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedAutre

Sep 23, 2026 → Oct 30, 2026

15-60 days

~1,781 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedAutre

Sep 27, 2026 → Oct 30, 2026

15-60 days

~2,029 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedAutre

Sep 23, 2026 → Oct 30, 2026

15-60 days

~1,781 m

Insufficient data

Le Plateau-Mont-RoyalObstructedAutre

Oct 7, 2026 → Nov 13, 2026

15-60 days

~50 m

Insufficient data

Le Plateau-Mont-RoyalObstructedAutre

Oct 7, 2026 → Nov 13, 2026

15-60 days

~50 m

Insufficient data

St-LaurentObstructedÉgouts et aqueducs - Excavation

Sep 30, 2026 → Oct 22, 2026

15-60 days

~1,542 m

Insufficient data

OutremontObstructedAutre

Oct 18, 2026 → Oct 23, 2026

3-14 days

~394 m

Insufficient data

Ahuntsic-CartiervilleObstructedRéseaux routier - Réfection et travaux corrélatifs

Oct 18, 2026 → Oct 23, 2026

3-14 days

~1,895 m

Insufficient data

Ahuntsic-CartiervilleObstructedRéseaux routier - Réfection et travaux corrélatifs

Oct 18, 2026 → Oct 23, 2026

3-14 days

~2,622 m

Insufficient data

Pierrefonds-RoxboroObstructedAutre

Oct 12, 2026 → Nov 13, 2026

15-60 days

~1,519 m

Insufficient data

Le Sud-OuestObstructedAutre

Mar 3, 2024 → Dec 23, 2026

180+ days

~661 m

+421.9% vs before

Likely increase

Avg. before construction: 257 (28 days of data)

Avg. during construction: 1,344 (903 days of data)

Montréal-NordObstructedAutre

Oct 18, 2026 → Oct 23, 2026

3-14 days

~4,102 m

Insufficient data

Rosemont-La Petite-PatrieObstructedAutre

Oct 19, 2026 → Oct 23, 2026

3-14 days

~696 m

Insufficient data

St-LaurentObstructedConstruction/rénovation sans excavation

Oct 20, 2026 → Oct 30, 2026

3-14 days

~2,471 m

Insufficient data

Le Sud-OuestObstructedConstruction/rénovation avec excavation

Oct 16, 2026 → Nov 20, 2026

15-60 days

~935 m

Insufficient data

Le Sud-OuestObstructedConstruction/rénovation sans excavation

Oct 19, 2026 → Oct 20, 2026

0-2 days

~912 m

Insufficient data