Track active roadwork that affects bike paths and likely impact on bike traffic.
Total Affected
248
Distinct construction zones impacting a bike path
Bike Paths Blocked
140
Fully closed to cyclists - requires detour
Bike Paths Obstructed
108
Partially obstructed - reduced width or shared lane
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Excavation | Oct 12, 2026 → Oct 21, 2026 3-14 days | ~741 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Aug 16, 2026 → Oct 21, 2026 61-180 days | ~741 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 12, 2026 → Oct 23, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 12, 2026 → Oct 23, 2026 61-180 days | ~4,648 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Jul 13, 2026 → Oct 23, 2026 61-180 days | ~4,530 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Égouts et aqueducs - Excavation | Aug 16, 2026 → Oct 26, 2026 61-180 days | ~364 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Autre | Oct 19, 2026 → Oct 30, 2026 3-14 days | ~1,310 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Trottoirs - Construction | Sep 29, 2026 → Oct 30, 2026 15-60 days | ~781 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~283 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~206 m | Insufficient data | |
| St-Laurent | Blocked | Égouts et aqueducs - Excavation | Aug 1, 2026 → Oct 31, 2026 61-180 days | ~1,587 m | +6% vs before Likely stable Avg. before construction: 1,230 (28 days of data) Avg. during construction: 1,304 (22 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Aug 27, 2026 → Oct 31, 2026 61-180 days | ~1,247 m | Insufficient data Avg. before construction: 494 (24 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Mar 8, 2026 → Oct 31, 2026 180+ days | ~47 m | +588% vs before Likely increase Avg. before construction: 149 (28 days of data) Avg. during construction: 1,025 (168 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,340 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Excavation | Aug 31, 2026 → Nov 6, 2026 61-180 days | ~2,553 m | Insufficient data Avg. before construction: 652 (20 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Oct 15, 2026 → Nov 7, 2026 15-60 days | ~1,911 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Nov 13, 2026 180+ days | ~79 m | +357.9% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 986 (154 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Nov 13, 2026 180+ days | ~71 m | +357.9% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 986 (154 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Jun 1, 2026 → Nov 13, 2026 61-180 days | ~170 m | +14.3% vs before Likely increase Avg. before construction: 1,676 (28 days of data) Avg. during construction: 1,916 (83 days of data) | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Oct 21, 2026 → Nov 21, 2026 15-60 days | ~743 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Oct 21, 2026 → Nov 21, 2026 15-60 days | ~743 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Excavation | Oct 21, 2026 → Nov 22, 2026 15-60 days | ~787 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Sep 17, 2026 → Nov 27, 2026 61-180 days | ~909 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jun 4, 2026 → Dec 11, 2026 180+ days | ~258 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Égouts et aqueducs - Excavation | Aug 2, 2026 → Dec 11, 2026 61-180 days | ~2,745 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Oct 12, 2026 → Dec 18, 2026 61-180 days | ~213 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Oct 12, 2026 → Dec 18, 2026 61-180 days | ~213 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Aug 25, 2026 → May 1, 2027 180+ days | ~35 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Jun 10, 2026 → Jun 11, 2027 180+ days | ~594 m | +9% vs before Likely increase Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,394 (74 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Sep 29, 2026 → Oct 31, 2026 15-60 days | ~1,655 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Sep 27, 2026 → Nov 14, 2026 15-60 days | ~2,374 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Autre | Oct 18, 2026 → Feb 20, 2027 61-180 days | ~304 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | Jun 14, 2026 → Oct 31, 2027 180+ days | ~251 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | S-3 Infrastructure souterraine majeure - Massifs et conduits | Oct 12, 2026 → Oct 21, 2026 3-14 days | ~441 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,431 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~889 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,064 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,198 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Entretien | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~2,128 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Entretien | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~1,388 m | Insufficient data | |
| Verdun | Blocked | Entretien | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~379 m | Insufficient data | |
| Ville-Marie | Blocked | Trottoirs - Construction | Oct 12, 2026 → Oct 21, 2026 3-14 days | ~29 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Sep 30, 2026 → Oct 23, 2026 15-60 days | ~307 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~1,480 m | Insufficient data | |
| Montréal-Nord | Blocked | Construction/rénovation avec excavation | Sep 30, 2026 → Oct 30, 2026 15-60 days | ~1,378 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Aug 27, 2026 → Oct 31, 2026 61-180 days | ~1,247 m | Insufficient data Avg. before construction: 494 (24 days of data) | |
| Ahuntsic-Cartierville | Blocked | Trottoirs - Construction | Sep 28, 2026 → Nov 13, 2026 15-60 days | ~1,388 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation sans excavation | Sep 24, 2026 → Nov 27, 2026 61-180 days | ~745 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Sep 20, 2026 → Dec 11, 2026 61-180 days | ~809 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Sep 20, 2026 → Dec 11, 2026 61-180 days | ~809 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Autre | Oct 1, 2026 → Dec 31, 2026 61-180 days | ~173 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jul 17, 2026 → Dec 31, 2026 61-180 days | ~306 m | Insufficient data | |
| Outremont | Blocked | Autre | Oct 18, 2026 → Oct 23, 2026 3-14 days | ~394 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Égouts et aqueducs - Excavation | Oct 15, 2026 → Oct 23, 2026 3-14 days | ~636 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~249 m | Insufficient data | |
| Montréal-Nord | Blocked | Trottoirs - Construction | Oct 6, 2026 → Oct 23, 2026 15-60 days | ~2,947 m | Insufficient data | |
| Montréal-Nord | Blocked | Construction/rénovation avec excavation | Oct 18, 2026 → Oct 23, 2026 3-14 days | ~861 m | Insufficient data | |
| Verdun | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions | Oct 4, 2026 → Oct 23, 2026 15-60 days | ~243 m | Insufficient data | |
| Ville-Marie | Blocked | Réseaux routier - Réfection et travaux corrélatifs | Oct 16, 2026 → Oct 23, 2026 3-14 days | ~153 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | Oct 12, 2026 → Oct 27, 2026 15-60 days | ~151 m | Insufficient data | |
| Ville-Marie | Blocked | Réseaux routier - Réfection et travaux corrélatifs | Oct 18, 2026 → Oct 28, 2026 3-14 days | ~528 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Trottoirs - Construction | Oct 11, 2026 → Nov 9, 2026 15-60 days | ~721 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Sep 27, 2026 → Nov 14, 2026 15-60 days | ~2,374 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Autre | Oct 18, 2026 → Nov 20, 2026 15-60 days | ~274 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Entretien | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~1,183 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Entretien | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~961 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Toiture - Rénovation | Oct 19, 2026 → Oct 21, 2026 0-2 days | ~1,039 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Jul 13, 2026 → Oct 23, 2026 61-180 days | ~4,530 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Nov 13, 2026 180+ days | ~92 m | +357.9% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 986 (154 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,758 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,758 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Oct 12, 2026 → Oct 20, 2026 3-14 days | ~640 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Oct 12, 2026 → Oct 20, 2026 3-14 days | ~696 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | Oct 18, 2026 → Oct 30, 2026 3-14 days | ~426 m | Insufficient data | |
| Montréal-Nord | Blocked | Construction/rénovation avec excavation | Oct 20, 2026 → Nov 6, 2026 15-60 days | ~2,844 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Jun 1, 2026 → Nov 13, 2026 61-180 days | ~170 m | +14.3% vs before Likely increase Avg. before construction: 1,676 (28 days of data) Avg. during construction: 1,916 (83 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation avec excavation | Sep 26, 2026 → Mar 31, 2028 180+ days | ~767 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Entretien | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~1,648 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation sans excavation | Oct 18, 2026 → Oct 20, 2026 0-2 days | ~1,041 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Entretien | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~576 m | Insufficient data | |
| L'Île-Bizard-Sainte-Geneviève | Blocked | Entretien | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~2,647 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Oct 20, 2026 → Oct 22, 2026 0-2 days | ~348 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Autre | Sep 13, 2026 → Oct 23, 2026 15-60 days | ~701 m | Insufficient data Avg. before construction: 644 (7 days of data) | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~795 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~898 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~795 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~898 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Égouts et aqueducs - Excavation | Oct 1, 2026 → Oct 23, 2026 15-60 days | ~2,680 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Feux de signalisation - Ajout/réparation | Oct 20, 2026 → Oct 28, 2026 3-14 days | ~1,223 m | Insufficient data | |
| Montréal-Nord | Blocked | Construction/rénovation sans excavation | Oct 18, 2026 → Oct 30, 2026 3-14 days | ~1,118 m | Insufficient data | |
| Anjou | Blocked | Trottoirs - Construction | Oct 18, 2026 → Oct 31, 2026 3-14 days | ~2,683 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation sans excavation | Apr 23, 2026 → Nov 13, 2026 180+ days | ~38 m | +200.3% vs before Likely increase Avg. before construction: 605 (28 days of data) Avg. during construction: 1,817 (122 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation sans excavation | Oct 20, 2026 → Oct 22, 2026 0-2 days | ~1,256 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Autre | Sep 23, 2026 → Oct 30, 2026 15-60 days | ~1,781 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Autre | Sep 27, 2026 → Oct 30, 2026 15-60 days | ~2,029 m | Insufficient data | |
| Ville-Marie | Blocked | S-3 Infrastructure souterraine majeure - Réseaux de gaz | Sep 27, 2026 → Dec 18, 2026 61-180 days | ~692 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | Oct 8, 2026 → Oct 23, 2026 15-60 days | ~991 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation sans excavation | Oct 4, 2026 → Oct 23, 2026 15-60 days | ~1,292 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Oct 17, 2026 → Oct 27, 2026 3-14 days | ~67 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | AS-2 Réseau aérosouterrain existant | Sep 30, 2026 → Oct 28, 2026 15-60 days | ~1,181 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Feux de signalisation - Ajout/réparation | Oct 6, 2026 → Nov 9, 2026 15-60 days | ~1,679 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Feux de signalisation - Ajout/réparation | Oct 6, 2026 → Nov 9, 2026 15-60 days | ~1,679 m | Insufficient data | |
| Lachine | Blocked | Construction/rénovation sans excavation | Apr 19, 2026 → Oct 31, 2026 180+ days | ~6,263 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | Oct 18, 2026 → Oct 21, 2026 3-14 days | ~250 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Oct 6, 2026 → Oct 23, 2026 15-60 days | ~4,554 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | Oct 15, 2026 → Oct 23, 2026 3-14 days | ~463 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Oct 18, 2026 → Oct 26, 2026 3-14 days | ~681 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Égouts et aqueducs - Excavation | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~97 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | Sep 5, 2026 → Oct 25, 2026 15-60 days | ~1,927 m | Insufficient data Avg. before construction: 711 (15 days of data) | |
| Ahuntsic-Cartierville | Blocked | Entretien | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~1,229 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Trottoirs - Construction | Sep 28, 2026 → Nov 13, 2026 15-60 days | ~1,388 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation sans excavation | Oct 8, 2026 → Oct 23, 2026 15-60 days | ~685 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation sans excavation | Oct 8, 2026 → Oct 23, 2026 15-60 days | ~1,452 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation sans excavation | Oct 8, 2026 → Oct 23, 2026 15-60 days | ~458 m | Insufficient data | |
| Ville-Marie | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | Oct 11, 2026 → Oct 23, 2026 3-14 days | ~401 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Jul 19, 2026 → Oct 23, 2026 61-180 days | ~680 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Autre | Oct 18, 2026 → Oct 31, 2026 3-14 days | ~1,148 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Aug 2, 2026 → Nov 1, 2026 61-180 days | ~623 m | +4.1% vs before Likely stable Avg. before construction: 2,110 (28 days of data) Avg. during construction: 2,196 (21 days of data) | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation sans excavation | Oct 4, 2026 → Nov 2, 2026 15-60 days | ~1,431 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Excavation | Oct 21, 2026 → Nov 22, 2026 15-60 days | ~787 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~889 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation sans excavation | Oct 19, 2026 → Oct 22, 2026 3-14 days | ~1,132 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Oct 18, 2026 → Oct 20, 2026 0-2 days | ~246 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Oct 20, 2026 → Oct 22, 2026 0-2 days | ~246 m | Insufficient data | |
| LaSalle | Blocked | Trottoirs - Construction | Oct 8, 2026 → Oct 23, 2026 15-60 days | ~4,892 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Oct 22, 2026 → Oct 23, 2026 0-2 days | ~246 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Plateau-Mont-Royal | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Aug 2, 2026 → Nov 1, 2026 61-180 days | ~622 m | +4.1% vs before Likely stable Avg. before construction: 2,110 (28 days of data) Avg. during construction: 2,196 (21 days of data) | |
| Ahuntsic-Cartierville | Blocked | Feux de signalisation - Ajout/réparation | Oct 6, 2026 → Nov 9, 2026 15-60 days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Toiture - Rénovation | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~1,185 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Toiture - Rénovation | Oct 22, 2026 → Oct 23, 2026 0-2 days | ~1,186 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Autre | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~1,856 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~1,452 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~2,575 m | Insufficient data | |
| Montréal-Nord | Obstructed | Construction/rénovation sans excavation | Mar 31, 2026 → Oct 30, 2026 180+ days | ~2,784 m | Insufficient data Avg. before construction: 0 (17 days of data) | |
| Le Sud-Ouest | Obstructed | Construction/rénovation avec excavation | Sep 27, 2026 → Oct 30, 2026 15-60 days | ~1,000 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Aug 2, 2026 → Nov 1, 2026 61-180 days | ~623 m | +4.1% vs before Likely stable Avg. before construction: 2,110 (28 days of data) Avg. during construction: 2,196 (21 days of data) | |
| Anjou | Obstructed | Autre | Jan 10, 2026 → Nov 11, 2026 180+ days | ~3,171 m | +960.3% vs before Likely increase Avg. before construction: 34 (28 days of data) Avg. during construction: 361 (225 days of data) | |
| Le Sud-Ouest | Obstructed | Construction/rénovation avec excavation | May 30, 2026 → Dec 18, 2026 180+ days | ~992 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Égouts et aqueducs - Réhabilitation | Oct 8, 2026 → Oct 21, 2026 3-14 days | ~626 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | Sep 20, 2026 → Oct 23, 2026 15-60 days | ~1,015 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Égouts et aqueducs - Excavation | Oct 19, 2026 → Oct 23, 2026 3-14 days | ~1,319 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Égouts et aqueducs - Réhabilitation | Oct 22, 2026 → Oct 28, 2026 3-14 days | ~365 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Oct 18, 2026 → Oct 28, 2026 3-14 days | ~165 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | Sep 20, 2026 → Nov 13, 2026 15-60 days | ~1,048 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Entretien | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~363 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Entretien | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~799 m | Insufficient data | |
| Ville-Marie | Obstructed | Trottoirs - Construction | Oct 4, 2026 → Oct 21, 2026 15-60 days | ~566 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Entretien | Oct 21, 2026 → Oct 22, 2026 0-2 days | ~359 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Construction/rénovation avec excavation | Sep 22, 2026 → Oct 23, 2026 15-60 days | ~1,190 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Oct 19, 2026 → Oct 30, 2026 3-14 days | ~1,310 m | Insufficient data | |
| LaSalle | Obstructed | Feux de signalisation - Ajout/réparation | Oct 18, 2026 → Nov 6, 2026 15-60 days | ~2,323 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Égouts et aqueducs - Excavation | Sep 27, 2026 → Nov 30, 2026 61-180 days | ~428 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Entretien | Oct 18, 2026 → Oct 21, 2026 3-14 days | ~1,176 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Excavation | Oct 12, 2026 → Oct 21, 2026 3-14 days | ~741 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~795 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | Sep 13, 2026 → Oct 23, 2026 15-60 days | ~701 m | Insufficient data Avg. before construction: 644 (7 days of data) | |
| Anjou | Obstructed | Autre | Oct 20, 2026 → Oct 26, 2026 3-14 days | ~3,339 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Trottoirs - Construction | Oct 12, 2026 → Oct 30, 2026 15-60 days | ~1,885 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Construction/rénovation avec excavation | Aug 29, 2026 → Oct 31, 2026 61-180 days | ~6,717 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Construction/rénovation avec excavation | Aug 29, 2026 → Oct 31, 2026 61-180 days | ~6,248 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,340 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,431 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Trottoirs - Construction | Oct 11, 2026 → Nov 18, 2026 15-60 days | ~665 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Excavation | Oct 17, 2026 → Nov 18, 2026 15-60 days | ~1,025 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Trottoirs - Construction | Oct 11, 2026 → Nov 18, 2026 15-60 days | ~1,366 m | Insufficient data | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Oct 18, 2026 → Dec 18, 2026 61-180 days | ~508 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Massifs et conduits | Oct 12, 2026 → Oct 21, 2026 3-14 days | ~441 m | Insufficient data | |
| Ville-Marie | Obstructed | Construction/rénovation avec excavation | Oct 17, 2026 → Oct 27, 2026 3-14 days | ~67 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Feux de signalisation - Ajout/réparation | Oct 18, 2026 → Oct 30, 2026 3-14 days | ~1,856 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Autre | Oct 12, 2026 → Nov 13, 2026 15-60 days | ~2,715 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Égouts et aqueducs - Excavation | Sep 27, 2026 → Nov 30, 2026 61-180 days | ~392 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Oct 19, 2026 → Oct 21, 2026 0-2 days | ~679 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~435 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Entretien | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~687 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | May 12, 2026 → Oct 23, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Autre | Aug 16, 2026 → Nov 16, 2026 61-180 days | ~398 m | +6.6% vs before Likely stable Avg. before construction: 1,431 (28 days of data) Avg. during construction: 1,526 (7 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Égouts et aqueducs - Excavation | Oct 20, 2026 → Oct 26, 2026 3-14 days | ~2,085 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation avec excavation | Aug 17, 2026 → Oct 30, 2026 61-180 days | ~936 m | -23.3% vs before Likely decrease Avg. before construction: 147,859 (28 days of data) Avg. during construction: 113,467 (62 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Toiture - Rénovation | Oct 19, 2026 → Oct 21, 2026 0-2 days | ~1,602 m | Insufficient data | |
| Ville-Marie | Obstructed | Feux de signalisation - Ajout/réparation | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~244 m | Insufficient data | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | Oct 4, 2026 → Oct 23, 2026 15-60 days | ~3,935 m | Insufficient data | |
| Anjou | Obstructed | Autre | Sep 21, 2026 → Oct 22, 2026 15-60 days | ~3,137 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation sans excavation | Oct 18, 2026 → Oct 23, 2026 3-14 days | ~1,623 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Oct 14, 2026 → Oct 23, 2026 3-14 days | ~815 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Trottoirs - Construction | Oct 6, 2026 → Oct 28, 2026 15-60 days | ~3,801 m | Insufficient data | |
| Montréal-Nord | Obstructed | Puits d'accès - Inspection | Oct 22, 2026 → Oct 30, 2026 3-14 days | ~1,108 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | Oct 6, 2026 → Nov 3, 2026 15-60 days | ~504 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Autre | Oct 12, 2026 → Nov 13, 2026 15-60 days | ~3,837 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Autre | Oct 12, 2026 → Nov 13, 2026 15-60 days | ~6,373 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Trottoirs - Construction | Oct 12, 2026 → Oct 30, 2026 15-60 days | ~1,885 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Égouts et aqueducs - Réhabilitation | Oct 15, 2026 → Oct 20, 2026 3-14 days | ~595 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Inspection et nettoyage | Oct 12, 2026 → Oct 22, 2026 3-14 days | ~848 m | Insufficient data | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Excavation | Oct 16, 2026 → Oct 23, 2026 3-14 days | ~611 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Égouts et aqueducs - Réhabilitation | Oct 18, 2026 → Oct 23, 2026 3-14 days | ~1,188 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation sans excavation | Oct 16, 2026 → Oct 24, 2026 3-14 days | ~83 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Aug 31, 2026 → Oct 30, 2026 15-60 days | ~2,231 m | Insufficient data Avg. before construction: 1,338 (20 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | Oct 4, 2026 → Oct 23, 2026 15-60 days | ~3,935 m | Insufficient data | |
| St-Laurent | Obstructed | Trottoirs - Construction | Sep 27, 2026 → Nov 6, 2026 15-60 days | ~1,543 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | Jun 24, 2026 → Nov 27, 2026 61-180 days | ~384 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Construction/rénovation sans excavation | Oct 17, 2026 → Jan 18, 2027 61-180 days | ~1,203 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Sep 27, 2026 → Oct 24, 2026 15-60 days | ~5,388 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation sans excavation | Oct 12, 2026 → Oct 28, 2026 15-60 days | ~1,483 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Trottoirs - Construction | Oct 18, 2026 → Oct 30, 2026 3-14 days | ~398 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | Sep 13, 2026 → Oct 30, 2026 15-60 days | ~189 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Trottoirs - Construction | Jun 25, 2026 → Oct 31, 2026 61-180 days | ~764 m | +12.8% vs before Likely increase Avg. before construction: 199 (28 days of data) Avg. during construction: 225 (59 days of data) | |
| Ville-Marie | Obstructed | Construction/rénovation sans excavation | Sep 13, 2026 → Nov 6, 2026 15-60 days | ~280 m | Insufficient data Avg. before construction: 1,043 (7 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Autre | Oct 18, 2026 → Feb 20, 2027 61-180 days | ~304 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Autre | Oct 18, 2026 → Feb 20, 2027 61-180 days | ~304 m | Insufficient data | |
| Ville-Marie | Obstructed | Autre | Sep 30, 2026 → Oct 31, 2026 15-60 days | ~279 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Entretien | Oct 20, 2026 → Oct 21, 2026 0-2 days | ~757 m | Insufficient data | |
| Outremont | Obstructed | Autre | Oct 18, 2026 → Oct 22, 2026 3-14 days | ~549 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~889 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,064 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,064 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,198 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Oct 21, 2026 → Nov 3, 2026 3-14 days | ~1,340 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Construction/rénovation sans excavation | Mar 22, 2026 → Nov 13, 2026 180+ days | ~96 m | +357.9% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 986 (154 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Entretien | Oct 22, 2026 → Oct 25, 2026 3-14 days | ~566 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Plateau-Mont-Royal | Obstructed | Égouts et aqueducs - Excavation | Oct 19, 2026 → Nov 5, 2026 15-60 days | ~312 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Oct 12, 2026 → Oct 23, 2026 3-14 days | ~3,536 m | Insufficient data | |
| St-Laurent | Obstructed | Trottoirs - Construction | Oct 13, 2026 → Oct 30, 2026 15-60 days | ~3,317 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | Sep 23, 2026 → Oct 30, 2026 15-60 days | ~1,781 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | Sep 27, 2026 → Oct 30, 2026 15-60 days | ~2,029 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | Sep 23, 2026 → Oct 30, 2026 15-60 days | ~1,781 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | Oct 7, 2026 → Nov 13, 2026 15-60 days | ~50 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | Oct 7, 2026 → Nov 13, 2026 15-60 days | ~50 m | Insufficient data | |
| St-Laurent | Obstructed | Égouts et aqueducs - Excavation | Sep 30, 2026 → Oct 22, 2026 15-60 days | ~1,542 m | Insufficient data | |
| Outremont | Obstructed | Autre | Oct 18, 2026 → Oct 23, 2026 3-14 days | ~394 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Oct 18, 2026 → Oct 23, 2026 3-14 days | ~1,895 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Oct 18, 2026 → Oct 23, 2026 3-14 days | ~2,622 m | Insufficient data | |
| Pierrefonds-Roxboro | Obstructed | Autre | Oct 12, 2026 → Nov 13, 2026 15-60 days | ~1,519 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Autre | Mar 3, 2024 → Dec 23, 2026 180+ days | ~661 m | +421.9% vs before Likely increase Avg. before construction: 257 (28 days of data) Avg. during construction: 1,344 (903 days of data) | |
| Montréal-Nord | Obstructed | Autre | Oct 18, 2026 → Oct 23, 2026 3-14 days | ~4,102 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Oct 19, 2026 → Oct 23, 2026 3-14 days | ~696 m | Insufficient data | |
| St-Laurent | Obstructed | Construction/rénovation sans excavation | Oct 20, 2026 → Oct 30, 2026 3-14 days | ~2,471 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Construction/rénovation avec excavation | Oct 16, 2026 → Nov 20, 2026 15-60 days | ~935 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Construction/rénovation sans excavation | Oct 19, 2026 → Oct 20, 2026 0-2 days | ~912 m | Insufficient data |