Track active roadwork that affects bike paths and likely impact on bike traffic.
Total Affected
200
Distinct construction zones impacting a bike path
Bike Paths Blocked
103
Fully closed to cyclists - requires detour
Bike Paths Obstructed
97
Partially obstructed - reduced width or shared lane
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Le Plateau-Mont-Royal | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | May 18, 2026 → May 29, 2026 3-14 days | ~454 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Mar 29, 2026 → Jun 1, 2026 61-180 days | ~675 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Apr 12, 2026 → Jun 1, 2026 15-60 days | ~674 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Égouts et aqueducs - Excavation | May 17, 2026 → Jun 5, 2026 15-60 days | ~1,733 m | Insufficient data Avg. before construction: 283 (28 days of data) Avg. during construction: 279 (1 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | May 24, 2026 → Jun 5, 2026 3-14 days | ~618 m | Insufficient data Avg. before construction: 774 (22 days of data) | |
| Ahuntsic-Cartierville | Blocked | Autre | Apr 26, 2026 → Jun 8, 2026 15-60 days | ~243 m | +96.4% vs before Likely increase Avg. before construction: 72 (28 days of data) Avg. during construction: 142 (22 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Jun 11, 2026 15-60 days | ~2,135 m | Insufficient data Avg. before construction: 283 (28 days of data) | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Mar 31, 2026 → Jun 12, 2026 61-180 days | ~1,557 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Autre | May 10, 2026 → Jun 23, 2026 15-60 days | ~515 m | +782.9% vs before Likely increase Avg. before construction: 173 (28 days of data) Avg. during construction: 1,525 (8 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 26, 2026 61-180 days | ~166 m | +177% vs before Likely increase Avg. before construction: 387 (28 days of data) Avg. during construction: 1,071 (36 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 26, 2026 61-180 days | ~166 m | +177% vs before Likely increase Avg. before construction: 387 (28 days of data) Avg. during construction: 1,071 (36 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 30, 2026 61-180 days | ~1,240 m | +1,125% vs before Likely increase Avg. before construction: 15 (28 days of data) Avg. during construction: 189 (36 days of data) | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 10, 2026 61-180 days | ~1,029 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Autre | May 12, 2026 → Aug 12, 2026 61-180 days | ~605 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 9, 2026 → Aug 16, 2026 61-180 days | ~611 m | +25.8% vs before Likely increase Avg. before construction: 1,262 (28 days of data) Avg. during construction: 1,588 (9 days of data) | |
| Ville-Marie | Blocked | Autre | May 10, 2026 → Sep 8, 2026 61-180 days | ~645 m | -36.2% vs before Likely decrease Avg. before construction: 1,806 (28 days of data) Avg. during construction: 1,153 (8 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~71 m | +142% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 521 (45 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~79 m | +142% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 521 (45 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,648 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Mar 29, 2026 → Oct 30, 2026 180+ days | ~668 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 6, 2026 → Oct 30, 2026 180+ days | ~464 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~283 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~206 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Mar 8, 2026 → Oct 31, 2026 180+ days | ~47 m | +222.9% vs before Likely increase Avg. before construction: 149 (28 days of data) Avg. during construction: 481 (71 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 24, 2026 → May 29, 2026 3-14 days | ~109 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Feb 10, 2026 → Jul 17, 2026 61-180 days | ~306 m | Insufficient data Avg. during construction: 4,026 (33 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 9, 2026 → Aug 16, 2026 61-180 days | ~630 m | +25.8% vs before Likely increase Avg. before construction: 1,262 (28 days of data) Avg. during construction: 1,588 (9 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Jan 12, 2025 → Aug 29, 2026 180+ days | ~734 m | Insufficient data Avg. during construction: 940 (93 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | May 18, 2026 → May 29, 2026 3-14 days | ~414 m | Insufficient data Avg. before construction: 2,665 (28 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | May 18, 2026 → May 29, 2026 3-14 days | ~297 m | Insufficient data Avg. before construction: 2,665 (28 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Toiture - Rénovation | May 24, 2026 → May 29, 2026 3-14 days | ~547 m | Insufficient data Avg. before construction: 3,019 (22 days of data) | |
| Ville-Marie | Blocked | Autre | May 24, 2026 → May 29, 2026 3-14 days | ~294 m | Insufficient data Avg. before construction: 3,019 (22 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 19, 2026 → May 29, 2026 3-14 days | ~2,555 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 19, 2026 → May 29, 2026 3-14 days | ~2,785 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 19, 2026 → May 29, 2026 3-14 days | ~2,957 m | Insufficient data | |
| Ville-Marie | Blocked | Autre | May 21, 2026 → Jun 1, 2026 3-14 days | ~542 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 3, 2026 3-14 days | ~144 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 3, 2026 3-14 days | ~349 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | S-3 Infrastructure souterraine majeure - Massifs et conduits | May 3, 2026 → May 31, 2026 15-60 days | ~918 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Réhabilitation | May 6, 2026 → May 31, 2026 15-60 days | ~952 m | Insufficient data | |
| Ville-Marie | Blocked | S-3 Infrastructure souterraine majeure - Puits d'accès | May 15, 2026 → Jun 5, 2026 15-60 days | ~233 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Apr 20, 2026 → Jul 17, 2026 61-180 days | ~1,202 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 18, 2026 → May 24, 2026 3-14 days | ~171 m | Insufficient data | |
| Ville-Marie | Blocked | Autre | May 21, 2026 → May 25, 2026 3-14 days | ~295 m | Insufficient data Avg. before construction: 0 (25 days of data) | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | May 25, 2026 → May 29, 2026 3-14 days | ~1,276 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Outremont | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → May 25, 2026 0-2 days | ~420 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | S-3 Infrastructure souterraine majeure - Massifs et conduits | May 3, 2026 → May 31, 2026 15-60 days | ~918 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation sans excavation | Mar 31, 2026 → May 31, 2026 61-180 days | ~211 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 24, 2026 → Jun 25, 2026 15-60 days | ~1,227 m | Insufficient data Avg. before construction: 207 (22 days of data) | |
| Ville-Marie | Blocked | Entretien | May 24, 2026 → May 25, 2026 0-2 days | ~481 m | Insufficient data Avg. before construction: 1,725 (22 days of data) | |
| Ville-Marie | Blocked | Entretien | May 24, 2026 → May 25, 2026 0-2 days | ~364 m | Insufficient data Avg. before construction: 731 (22 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | May 25, 2026 → May 26, 2026 0-2 days | ~1,041 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~92 m | +142% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 521 (45 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,758 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,758 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Égouts et aqueducs - Excavation | May 25, 2026 → May 27, 2026 0-2 days | ~1,418 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ville-Marie | Blocked | Égouts et aqueducs - Réhabilitation | Mar 29, 2026 → Jun 1, 2026 61-180 days | ~675 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Autre | Mar 22, 2026 → Jun 4, 2026 61-180 days | ~229 m | Insufficient data | |
| Anjou | Blocked | Autre | May 18, 2026 → Jun 19, 2026 15-60 days | ~3,191 m | Insufficient data Avg. before construction: 342 (28 days of data) | |
| Ville-Marie | Blocked | Entretien | May 20, 2026 → May 24, 2026 3-14 days | ~705 m | Insufficient data Avg. before construction: 1,787 (26 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | May 24, 2026 → May 29, 2026 3-14 days | ~437 m | Insufficient data Avg. before construction: 1,727 (22 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 18, 2026 → May 29, 2026 3-14 days | ~638 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | A-1 Réseau aérien existant | May 25, 2026 → May 26, 2026 0-2 days | ~2,679 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ahuntsic-Cartierville | Blocked | Toiture - Rénovation | May 24, 2026 → May 26, 2026 0-2 days | ~2,313 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 24, 2026 → May 29, 2026 3-14 days | ~109 m | Insufficient data | |
| Ville-Marie | Blocked | Égouts et aqueducs - Excavation | Apr 12, 2026 → Jun 1, 2026 15-60 days | ~674 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 5, 2026 → Jun 12, 2026 15-60 days | ~3,233 m | +64.8% vs before Likely increase Avg. before construction: 167 (28 days of data) Avg. during construction: 276 (13 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 13, 2026 → Jun 12, 2026 15-60 days | ~338 m | +72.3% vs before Likely increase Avg. before construction: 212 (28 days of data) Avg. during construction: 365 (5 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 10, 2026 → Jun 19, 2026 15-60 days | ~4,334 m | Insufficient data | |
| Montréal-Nord | Blocked | Autre | May 24, 2026 → Jun 25, 2026 15-60 days | ~3,382 m | Insufficient data Avg. before construction: 207 (22 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | Apr 30, 2026 → Jun 1, 2026 15-60 days | ~485 m | +3% vs before Likely stable Avg. before construction: 1,486 (28 days of data) Avg. during construction: 1,531 (18 days of data) | |
| Ahuntsic-Cartierville | Blocked | Autre | May 14, 2026 → Jun 30, 2026 15-60 days | ~3,621 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation sans excavation | Apr 23, 2026 → Oct 1, 2026 61-180 days | ~38 m | +95.4% vs before Likely increase Avg. before construction: 605 (28 days of data) Avg. during construction: 1,182 (25 days of data) | |
| Ahuntsic-Cartierville | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 5, 2026 → Jul 17, 2026 61-180 days | ~1,798 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 5, 2026 → Jul 17, 2026 61-180 days | ~1,856 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation sans excavation | May 19, 2026 → May 25, 2026 3-14 days | ~2,711 m | Insufficient data Avg. before construction: 297 (27 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | May 24, 2026 → May 27, 2026 3-14 days | ~990 m | Insufficient data Avg. before construction: 1,542 (22 days of data) | |
| Ahuntsic-Cartierville | Blocked | Égouts et aqueducs - Inspection et nettoyage | May 24, 2026 → May 28, 2026 3-14 days | ~456 m | Insufficient data Avg. before construction: 142 (22 days of data) | |
| Ville-Marie | Blocked | Autre | May 25, 2026 → May 29, 2026 3-14 days | ~201 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Plateau-Mont-Royal | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Jun 12, 2026 15-60 days | ~271 m | Insufficient data Avg. before construction: 1,773 (28 days of data) | |
| Lachine | Blocked | Construction/rénovation sans excavation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~6,263 m | Insufficient data | |
| Outremont | Blocked | Construction/rénovation sans excavation | Mar 25, 2026 → Jul 18, 2026 61-180 days | ~1,189 m | +361.3% vs before Likely increase Avg. before construction: 311 (28 days of data) Avg. during construction: 1,435 (54 days of data) | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Inspection et nettoyage | May 17, 2026 → May 28, 2026 3-14 days | ~851 m | Insufficient data Avg. before construction: 1,327 (28 days of data) Avg. during construction: 83 (1 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation sans excavation | May 5, 2026 → May 29, 2026 15-60 days | ~669 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 19, 2026 → May 29, 2026 3-14 days | ~3,043 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 19, 2026 → May 29, 2026 3-14 days | ~3,043 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation sans excavation | May 22, 2026 → Jun 19, 2026 15-60 days | ~1,123 m | Insufficient data | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 27, 2026 → Jun 22, 2026 15-60 days | ~157 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | May 18, 2026 → Jul 3, 2026 15-60 days | ~646 m | Insufficient data Avg. before construction: 19 (3 days of data) | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,000 m | Insufficient data Avg. before construction: 59 (23 days of data) | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,000 m | Insufficient data Avg. before construction: 59 (23 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 18, 2026 → May 24, 2026 3-14 days | ~171 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | May 24, 2026 → May 27, 2026 3-14 days | ~1,982 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | May 24, 2026 → May 27, 2026 3-14 days | ~1,982 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | May 18, 2026 → May 28, 2026 3-14 days | ~1,435 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 3, 2026 3-14 days | ~144 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → Jun 12, 2026 61-180 days | ~690 m | +114.5% vs before Likely increase Avg. before construction: 72 (28 days of data) Avg. during construction: 154 (42 days of data) | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 27, 2026 → Jun 22, 2026 15-60 days | ~157 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation sans excavation | May 21, 2026 → May 23, 2026 0-2 days | ~641 m | Insufficient data Avg. before construction: 779 (25 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 5, 2026 → May 26, 2026 15-60 days | ~3,285 m | -12.2% vs before Likely decrease Avg. before construction: 179 (28 days of data) Avg. during construction: 157 (13 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Égouts et aqueducs - Excavation | May 21, 2026 → May 26, 2026 3-14 days | ~1,961 m | Insufficient data Avg. before construction: 300 (25 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 12, 2026 → May 29, 2026 15-60 days | ~3,508 m | -75.7% vs before Likely decrease Avg. before construction: 227 (28 days of data) Avg. during construction: 55 (6 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Mar 29, 2026 → May 29, 2026 61-180 days | ~965 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Autre | May 24, 2026 → May 30, 2026 3-14 days | ~826 m | Insufficient data | |
| Outremont | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 3, 2026 3-14 days | ~441 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → Jun 19, 2026 15-60 days | ~414 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | May 3, 2026 → May 29, 2026 15-60 days | ~1,446 m | -1.6% vs before Likely stable Avg. before construction: 290 (28 days of data) Avg. during construction: 286 (15 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Mar 15, 2026 → Jun 5, 2026 61-180 days | ~720 m | +1,202.7% vs before Likely increase Avg. before construction: 37 (28 days of data) Avg. during construction: 487 (64 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | May 24, 2026 → Jun 12, 2026 15-60 days | ~184 m | Insufficient data Avg. before construction: 1,923 (22 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation sans excavation | Mar 31, 2026 → Oct 30, 2026 180+ days | ~2,784 m | Insufficient data Avg. before construction: 0 (17 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Mar 31, 2026 → May 29, 2026 15-60 days | ~1,627 m | +851.3% vs before Likely increase Avg. before construction: 19 (28 days of data) Avg. during construction: 178 (48 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Autre | May 24, 2026 → May 29, 2026 3-14 days | ~99 m | Insufficient data Avg. before construction: 1,725 (22 days of data) | |
| Outremont | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 3, 2026 3-14 days | ~568 m | Insufficient data | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | May 24, 2026 → Jun 10, 2026 15-60 days | ~517 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | May 22, 2026 → May 24, 2026 0-2 days | ~496 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation sans excavation | May 24, 2026 → May 25, 2026 0-2 days | ~870 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Mar 31, 2026 → May 29, 2026 15-60 days | ~1,627 m | +851.3% vs before Likely increase Avg. before construction: 19 (28 days of data) Avg. during construction: 178 (48 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → May 31, 2026 15-60 days | ~918 m | +2,252.7% vs before Likely increase Avg. before construction: 7 (28 days of data) Avg. during construction: 168 (42 days of data) | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,315 m | Insufficient data | |
| Anjou | Obstructed | Autre | Jan 10, 2026 → Jun 11, 2026 61-180 days | ~3,171 m | +284.3% vs before Likely increase Avg. before construction: 34 (28 days of data) Avg. during construction: 131 (128 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Entretien | May 25, 2026 → May 28, 2026 3-14 days | ~397 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Montréal-Nord | Obstructed | Autre | May 24, 2026 → May 29, 2026 3-14 days | ~3,362 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | May 6, 2026 → May 31, 2026 15-60 days | ~952 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Trottoirs - Construction | May 19, 2026 → Jun 5, 2026 15-60 days | ~1,163 m | Insufficient data Avg. before construction: 297 (27 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → Jun 19, 2026 15-60 days | ~414 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Autre | May 12, 2026 → Aug 12, 2026 61-180 days | ~605 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | May 27, 2025 → Sep 30, 2026 180+ days | ~692 m | -12.3% vs before Likely decrease Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,122 (283 days of data) | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | May 19, 2026 → Jun 5, 2026 15-60 days | ~915 m | Insufficient data | |
| Anjou | Obstructed | Autre | May 18, 2026 → May 26, 2026 3-14 days | ~4,229 m | Insufficient data Avg. before construction: 342 (28 days of data) | |
| Anjou | Obstructed | Autre | May 18, 2026 → May 26, 2026 3-14 days | ~4,228 m | Insufficient data Avg. before construction: 342 (28 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | May 25, 2026 → May 29, 2026 3-14 days | ~1,870 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,253 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | May 3, 2026 → Nov 27, 2026 180+ days | ~384 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 22, 2026 → May 23, 2026 0-2 days | ~448 m | Insufficient data Avg. before construction: 1,923 (24 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Entretien | May 23, 2026 → May 24, 2026 0-2 days | ~1,466 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Inspection | May 23, 2026 → May 24, 2026 0-2 days | ~1,141 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | May 24, 2026 → May 25, 2026 0-2 days | ~502 m | Insufficient data | |
| Montréal-Nord | Obstructed | Entretien | May 24, 2026 → May 25, 2026 0-2 days | ~2,720 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 24, 2026 → May 25, 2026 0-2 days | ~462 m | Insufficient data Avg. before construction: 1,872 (22 days of data) | |
| Montréal-Nord | Obstructed | Entretien | May 25, 2026 → May 26, 2026 0-2 days | ~2,945 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 25, 2026 → May 26, 2026 0-2 days | ~419 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 25, 2026 → May 26, 2026 0-2 days | ~484 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | May 20, 2026 → May 28, 2026 3-14 days | ~1,009 m | Insufficient data Avg. before construction: 1,575 (26 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → May 29, 2026 3-14 days | ~1,833 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~1,553 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~1,528 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,045 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~1,902 m | Insufficient data Avg. before construction: 59 (23 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~1,222 m | Insufficient data Avg. before construction: 207 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~250 m | Insufficient data Avg. before construction: 207 (28 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 24, 2026 → May 26, 2026 0-2 days | ~294 m | Insufficient data Avg. before construction: 2,586 (22 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 24, 2026 → May 26, 2026 0-2 days | ~284 m | Insufficient data Avg. before construction: 2,586 (22 days of data) | |
| Anjou | Obstructed | Autre | May 10, 2026 → Jun 11, 2026 15-60 days | ~3,192 m | -40.7% vs before Likely decrease Avg. before construction: 347 (28 days of data) Avg. during construction: 206 (8 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 24, 2026 → Jun 26, 2026 15-60 days | ~3,463 m | Insufficient data Avg. before construction: 207 (22 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 24, 2026 → Jun 26, 2026 15-60 days | ~3,625 m | Insufficient data Avg. before construction: 207 (22 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 25, 2026 → Jun 3, 2026 3-14 days | ~381 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation sans excavation | May 21, 2026 → Jun 12, 2026 15-60 days | ~857 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 12, 2026 61-180 days | ~4,522 m | Insufficient data | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | May 20, 2026 → Jun 26, 2026 15-60 days | ~1,419 m | Insufficient data Avg. before construction: 216 (26 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Égouts et aqueducs - Excavation | May 21, 2026 → Jun 30, 2026 15-60 days | ~771 m | Insufficient data Avg. before construction: 316 (25 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~2,096 m | Insufficient data Avg. before construction: 349 (25 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~2,392 m | Insufficient data Avg. before construction: 349 (25 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~1,668 m | Insufficient data Avg. before construction: 349 (25 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | May 24, 2026 → May 25, 2026 0-2 days | ~1,911 m | Insufficient data Avg. before construction: 301 (22 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | May 24, 2026 → May 29, 2026 3-14 days | ~3,990 m | Insufficient data Avg. before construction: 207 (22 days of data) | |
| St-Laurent | Obstructed | Construction/rénovation avec excavation | May 20, 2026 → May 26, 2026 3-14 days | ~1,613 m | Insufficient data Avg. before construction: 0 (1 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Égouts et aqueducs - Inspection et nettoyage | May 17, 2026 → May 28, 2026 3-14 days | ~80 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | S-1 Infrastructure souterraine existante | May 21, 2026 → May 28, 2026 3-14 days | ~538 m | Insufficient data Avg. before construction: 296 (25 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | May 24, 2026 → May 30, 2026 3-14 days | ~826 m | Insufficient data | |
| Montréal-Nord | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 5, 2026 3-14 days | ~3,440 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 5, 2026 3-14 days | ~2,167 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Autre | May 24, 2026 → May 25, 2026 0-2 days | ~5,242 m | Insufficient data | |
| St-Laurent | Obstructed | Entretien | May 25, 2026 → May 27, 2026 0-2 days | ~2,121 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Mar 10, 2026 → Sep 1, 2026 61-180 days | ~2,407 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 27, 2026 15-60 days | ~4,572 m | Insufficient data | |
| Ville-Marie | Obstructed | Construction/rénovation sans excavation | May 12, 2026 → Jun 13, 2026 15-60 days | ~286 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 1, 2026 → Oct 2, 2026 180+ days | ~3,647 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Inspection et nettoyage | May 18, 2026 → May 28, 2026 3-14 days | ~1,193 m | Insufficient data Avg. before construction: 1,319 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | May 19, 2026 → May 29, 2026 3-14 days | ~2,964 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | May 25, 2026 → May 29, 2026 3-14 days | ~1,410 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,315 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Construction/rénovation sans excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~96 m | +142% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 521 (45 days of data) | |
| Ville-Marie | Obstructed | Autre | May 21, 2026 → Jun 1, 2026 3-14 days | ~518 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 5, 2026 3-14 days | ~2,504 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | May 24, 2026 → May 25, 2026 0-2 days | ~2,908 m | Insufficient data Avg. before construction: 2,056 (22 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~250 m | Insufficient data Avg. before construction: 207 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~1,222 m | Insufficient data Avg. before construction: 207 (28 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Mar 3, 2024 → Dec 23, 2026 180+ days | ~661 m | +389.1% vs before Likely increase Avg. before construction: 257 (28 days of data) Avg. during construction: 1,259 (806 days of data) | |
| Montréal-Nord | Obstructed | Égouts et aqueducs - Inspection et nettoyage | May 17, 2026 → May 29, 2026 3-14 days | ~4,279 m | Insufficient data | |
| Anjou | Obstructed | Autre | May 24, 2026 → May 29, 2026 3-14 days | ~4,168 m | Insufficient data Avg. before construction: 207 (22 days of data) |