Construction Impact

Track active roadwork that affects bike paths and likely impact on bike traffic.

Source: Ville de Montreal - active construction permits with bike path impacts, updated daily.Snapshot date:May 24, 2026

Total Affected

97

Distinct construction zones impacting a bike path

Bike Paths Blocked

0

Fully closed to cyclists - requires detour

Bike Paths Obstructed

97

Partially obstructed - reduced width or shared lane

Status
AllBlockedObstructed
Borough
Reason
Duration
All0-2 days3-14 days15-60 days61-180 days180+ days
Clear filters

Active Bike Path Blockages(97)

Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.

StreetBoroughStatusReasonDurationNearest CounterVolume Impact
Ville-MarieObstructedÉgouts et aqueducs - Réhabilitation

Apr 27, 2026 → Jun 22, 2026

15-60 days

~157 m

Insufficient data

St-LaurentObstructedAutre

May 18, 2026 → Jul 3, 2026

15-60 days

~646 m

Insufficient data

Avg. before construction: 19 (3 days of data)

St-LaurentObstructedAutre

Apr 28, 2026 → Jul 22, 2026

61-180 days

~2,000 m

Insufficient data

Avg. before construction: 59 (23 days of data)

St-LaurentObstructedAutre

Apr 28, 2026 → Jul 22, 2026

61-180 days

~2,000 m

Insufficient data

Avg. before construction: 59 (23 days of data)

St-LaurentObstructedAutre

May 24, 2026 → May 27, 2026

3-14 days

~1,982 m

Insufficient data

St-LaurentObstructedAutre

May 24, 2026 → May 27, 2026

3-14 days

~1,982 m

Insufficient data

Mercier-Hochelaga-MaisonneuveObstructedConstruction/rénovation avec excavation

Apr 6, 2026 → Jun 12, 2026

61-180 days

~690 m

+114.5% vs before

Likely increase

Avg. before construction: 72 (28 days of data)

Avg. during construction: 154 (42 days of data)

Ville-MarieObstructedÉgouts et aqueducs - Réhabilitation

Apr 27, 2026 → Jun 22, 2026

15-60 days

~157 m

Insufficient data

Ahuntsic-CartiervilleObstructedConstruction/rénovation sans excavation

May 21, 2026 → May 23, 2026

0-2 days

~641 m

Insufficient data

Avg. before construction: 779 (25 days of data)

Montréal-NordObstructedAutre

May 5, 2026 → May 26, 2026

15-60 days

~3,285 m

-12.2% vs before

Likely decrease

Avg. before construction: 179 (28 days of data)

Avg. during construction: 157 (13 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedÉgouts et aqueducs - Excavation

May 21, 2026 → May 26, 2026

3-14 days

~1,961 m

Insufficient data

Avg. before construction: 300 (25 days of data)

Montréal-NordObstructedAutre

May 12, 2026 → May 29, 2026

15-60 days

~3,508 m

-75.7% vs before

Likely decrease

Avg. before construction: 227 (28 days of data)

Avg. during construction: 55 (6 days of data)

Le Sud-OuestObstructedAutre

Mar 29, 2026 → May 29, 2026

61-180 days

~965 m

Insufficient data

Le Sud-OuestObstructedAutre

May 24, 2026 → May 30, 2026

3-14 days

~826 m

Insufficient data

Le Plateau-Mont-RoyalObstructedS-3 Infrastructure souterraine majeure - Puits d'accès

May 11, 2026 → Jun 19, 2026

15-60 days

~414 m

Insufficient data

Ahuntsic-CartiervilleObstructedConstruction/rénovation avec excavation

Mar 15, 2026 → Jun 5, 2026

61-180 days

~720 m

+1,202.7% vs before

Likely increase

Avg. before construction: 37 (28 days of data)

Avg. during construction: 487 (64 days of data)

Montréal-NordObstructedConstruction/rénovation sans excavation

Mar 31, 2026 → Oct 30, 2026

180+ days

~2,784 m

Insufficient data

Avg. before construction: 0 (17 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedAutre

Mar 31, 2026 → May 29, 2026

15-60 days

~1,627 m

+851.3% vs before

Likely increase

Avg. before construction: 19 (28 days of data)

Avg. during construction: 178 (48 days of data)

Le Plateau-Mont-RoyalObstructedAutre

May 24, 2026 → May 29, 2026

3-14 days

~99 m

Insufficient data

Avg. before construction: 1,725 (22 days of data)

Ville-MarieObstructedÉgouts et aqueducs - Réhabilitation

May 24, 2026 → Jun 10, 2026

15-60 days

~517 m

Insufficient data

Le Plateau-Mont-RoyalObstructedAutre

May 22, 2026 → May 24, 2026

0-2 days

~496 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedAutre

Mar 31, 2026 → May 29, 2026

15-60 days

~1,627 m

+851.3% vs before

Likely increase

Avg. before construction: 19 (28 days of data)

Avg. during construction: 178 (48 days of data)

Montréal-NordObstructedConstruction/rénovation avec excavation

Apr 6, 2026 → May 31, 2026

15-60 days

~918 m

+2,252.7% vs before

Likely increase

Avg. before construction: 7 (28 days of data)

Avg. during construction: 168 (42 days of data)

LachineObstructedConstruction/rénovation avec excavation

Apr 12, 2026 → May 31, 2026

15-60 days

~4,315 m

Insufficient data

AnjouObstructedAutre

Jan 10, 2026 → Jun 11, 2026

61-180 days

~3,171 m

+284.3% vs before

Likely increase

Avg. before construction: 34 (28 days of data)

Avg. during construction: 131 (128 days of data)

Rosemont-La Petite-PatrieObstructedEntretien

May 25, 2026 → May 28, 2026

3-14 days

~397 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Montréal-NordObstructedAutre

May 24, 2026 → May 29, 2026

3-14 days

~3,362 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Réhabilitation

May 6, 2026 → May 31, 2026

15-60 days

~952 m

Insufficient data

Rosemont-La Petite-PatrieObstructedTrottoirs - Construction

May 19, 2026 → Jun 5, 2026

15-60 days

~1,163 m

Insufficient data

Avg. before construction: 297 (27 days of data)

Le Plateau-Mont-RoyalObstructedS-3 Infrastructure souterraine majeure - Puits d'accès

May 11, 2026 → Jun 19, 2026

15-60 days

~414 m

Insufficient data

Ahuntsic-CartiervilleObstructedAutre

May 12, 2026 → Aug 12, 2026

61-180 days

~605 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedConstruction/rénovation sans excavation

May 27, 2025 → Sep 30, 2026

180+ days

~692 m

-12.3% vs before

Likely decrease

Avg. before construction: 1,279 (28 days of data)

Avg. during construction: 1,122 (283 days of data)

AnjouObstructedAutre

May 18, 2026 → May 26, 2026

3-14 days

~4,229 m

Insufficient data

Avg. before construction: 342 (28 days of data)

AnjouObstructedAutre

May 18, 2026 → May 26, 2026

3-14 days

~4,228 m

Insufficient data

Avg. before construction: 342 (28 days of data)

Mercier-Hochelaga-MaisonneuveObstructedAutre

May 25, 2026 → May 29, 2026

3-14 days

~1,870 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

LachineObstructedConstruction/rénovation avec excavation

Apr 12, 2026 → May 31, 2026

15-60 days

~4,257 m

Insufficient data

LachineObstructedConstruction/rénovation avec excavation

Apr 12, 2026 → May 31, 2026

15-60 days

~4,253 m

Insufficient data

Le Plateau-Mont-RoyalObstructedConstruction/rénovation sans excavation

May 3, 2026 → Nov 27, 2026

180+ days

~384 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

May 22, 2026 → May 23, 2026

0-2 days

~448 m

Insufficient data

Avg. before construction: 1,923 (24 days of data)

Ahuntsic-CartiervilleObstructedEntretien

May 23, 2026 → May 24, 2026

0-2 days

~1,466 m

Insufficient data

Ahuntsic-CartiervilleObstructedInspection

May 23, 2026 → May 24, 2026

0-2 days

~1,141 m

Insufficient data

Le Plateau-Mont-RoyalObstructedConstruction/rénovation sans excavation

May 24, 2026 → May 25, 2026

0-2 days

~502 m

Insufficient data

Montréal-NordObstructedEntretien

May 24, 2026 → May 25, 2026

0-2 days

~2,720 m

Insufficient data

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

May 24, 2026 → May 25, 2026

0-2 days

~462 m

Insufficient data

Avg. before construction: 1,872 (22 days of data)

Montréal-NordObstructedEntretien

May 25, 2026 → May 26, 2026

0-2 days

~2,945 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

May 25, 2026 → May 26, 2026

0-2 days

~419 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

May 25, 2026 → May 26, 2026

0-2 days

~484 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

May 12, 2026 → Oct 13, 2026

61-180 days

~4,628 m

Insufficient data

Ahuntsic-CartiervilleObstructedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → May 29, 2026

3-14 days

~1,833 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Réhabilitation

Apr 19, 2026 → Jul 17, 2026

61-180 days

~1,553 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Réhabilitation

Apr 19, 2026 → Jul 17, 2026

61-180 days

~1,528 m

Insufficient data

St-LaurentObstructedAutre

Apr 28, 2026 → Jul 22, 2026

61-180 days

~2,045 m

Insufficient data

St-LaurentObstructedAutre

Apr 28, 2026 → Jul 22, 2026

61-180 days

~1,902 m

Insufficient data

Avg. before construction: 59 (23 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedEntretien

May 18, 2026 → Jul 31, 2026

61-180 days

~1,222 m

Insufficient data

Avg. before construction: 207 (28 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedEntretien

May 18, 2026 → Jul 31, 2026

61-180 days

~250 m

Insufficient data

Avg. before construction: 207 (28 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

May 24, 2026 → May 26, 2026

0-2 days

~294 m

Insufficient data

Avg. before construction: 2,586 (22 days of data)

Rosemont-La Petite-PatrieObstructedConstruction/rénovation avec excavation

May 24, 2026 → May 26, 2026

0-2 days

~284 m

Insufficient data

Avg. before construction: 2,586 (22 days of data)

AnjouObstructedAutre

May 10, 2026 → Jun 11, 2026

15-60 days

~3,192 m

-40.7% vs before

Likely decrease

Avg. before construction: 347 (28 days of data)

Avg. during construction: 206 (8 days of data)

Montréal-NordObstructedAutre

May 24, 2026 → Jun 26, 2026

15-60 days

~3,463 m

Insufficient data

Avg. before construction: 207 (22 days of data)

Montréal-NordObstructedAutre

May 24, 2026 → Jun 26, 2026

15-60 days

~3,625 m

Insufficient data

Avg. before construction: 207 (22 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedRéseaux routier - Réfection et travaux corrélatifs

May 25, 2026 → Jun 3, 2026

3-14 days

~381 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ahuntsic-CartiervilleObstructedConstruction/rénovation sans excavation

May 21, 2026 → Jun 12, 2026

15-60 days

~857 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Apr 12, 2026 → Jun 12, 2026

61-180 days

~4,522 m

Insufficient data

Montréal-NordObstructedConstruction/rénovation avec excavation

May 20, 2026 → Jun 26, 2026

15-60 days

~1,419 m

Insufficient data

Avg. before construction: 216 (26 days of data)

Mercier-Hochelaga-MaisonneuveObstructedÉgouts et aqueducs - Excavation

May 21, 2026 → Jun 30, 2026

15-60 days

~771 m

Insufficient data

Avg. before construction: 316 (25 days of data)

AnjouObstructedTrottoirs - Construction

May 21, 2026 → Jul 3, 2026

15-60 days

~2,096 m

Insufficient data

Avg. before construction: 349 (25 days of data)

AnjouObstructedTrottoirs - Construction

May 21, 2026 → Jul 3, 2026

15-60 days

~2,392 m

Insufficient data

Avg. before construction: 349 (25 days of data)

AnjouObstructedTrottoirs - Construction

May 21, 2026 → Jul 3, 2026

15-60 days

~1,668 m

Insufficient data

Avg. before construction: 349 (25 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedEntretien

May 24, 2026 → May 25, 2026

0-2 days

~1,911 m

Insufficient data

Avg. before construction: 301 (22 days of data)

Montréal-NordObstructedConstruction/rénovation avec excavation

May 24, 2026 → May 29, 2026

3-14 days

~3,990 m

Insufficient data

Avg. before construction: 207 (22 days of data)

St-LaurentObstructedConstruction/rénovation avec excavation

May 20, 2026 → May 26, 2026

3-14 days

~1,613 m

Insufficient data

Avg. before construction: 0 (1 days of data)

Le Plateau-Mont-RoyalObstructedÉgouts et aqueducs - Inspection et nettoyage

May 17, 2026 → May 28, 2026

3-14 days

~80 m

Insufficient data

Rosemont-La Petite-PatrieObstructedS-1 Infrastructure souterraine existante

May 21, 2026 → May 28, 2026

3-14 days

~538 m

Insufficient data

Avg. before construction: 296 (25 days of data)

Le Sud-OuestObstructedAutre

May 24, 2026 → May 30, 2026

3-14 days

~826 m

Insufficient data

Montréal-NordObstructedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → Jun 5, 2026

3-14 days

~3,440 m

Insufficient data

Ahuntsic-CartiervilleObstructedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → Jun 5, 2026

3-14 days

~2,167 m

Insufficient data

Ahuntsic-CartiervilleObstructedAutre

May 24, 2026 → May 25, 2026

0-2 days

~5,242 m

Insufficient data

St-LaurentObstructedEntretien

May 25, 2026 → May 27, 2026

0-2 days

~2,121 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Mar 10, 2026 → Sep 1, 2026

61-180 days

~2,407 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Apr 12, 2026 → May 27, 2026

15-60 days

~4,572 m

Insufficient data

Ville-MarieObstructedConstruction/rénovation sans excavation

May 12, 2026 → Jun 13, 2026

15-60 days

~286 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

Apr 1, 2026 → Oct 2, 2026

180+ days

~3,647 m

Insufficient data

Le Sud-OuestObstructedÉgouts et aqueducs - Inspection et nettoyage

May 18, 2026 → May 28, 2026

3-14 days

~1,193 m

Insufficient data

Avg. before construction: 1,319 (28 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedConstruction/rénovation avec excavation

May 19, 2026 → May 29, 2026

3-14 days

~2,964 m

Insufficient data

Ahuntsic-CartiervilleObstructedConstruction/rénovation avec excavation

May 25, 2026 → May 29, 2026

3-14 days

~1,410 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

LachineObstructedConstruction/rénovation avec excavation

Apr 12, 2026 → May 31, 2026

15-60 days

~4,315 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionObstructedConstruction/rénovation sans excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~96 m

+142% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 521 (45 days of data)

Ville-MarieObstructedAutre

May 21, 2026 → Jun 1, 2026

3-14 days

~518 m

Insufficient data

Ahuntsic-CartiervilleObstructedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → Jun 5, 2026

3-14 days

~2,504 m

Insufficient data

LachineObstructedConstruction/rénovation avec excavation

Apr 12, 2026 → May 31, 2026

15-60 days

~4,257 m

Insufficient data

LachineObstructedConstruction/rénovation avec excavation

Apr 12, 2026 → May 31, 2026

15-60 days

~4,257 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceObstructedEntretien

May 24, 2026 → May 25, 2026

0-2 days

~2,908 m

Insufficient data

Avg. before construction: 2,056 (22 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedEntretien

May 18, 2026 → Jul 31, 2026

61-180 days

~250 m

Insufficient data

Avg. before construction: 207 (28 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesObstructedEntretien

May 18, 2026 → Jul 31, 2026

61-180 days

~1,222 m

Insufficient data

Avg. before construction: 207 (28 days of data)

Le Sud-OuestObstructedAutre

Mar 3, 2024 → Dec 23, 2026

180+ days

~661 m

+389.1% vs before

Likely increase

Avg. before construction: 257 (28 days of data)

Avg. during construction: 1,259 (806 days of data)

Montréal-NordObstructedÉgouts et aqueducs - Inspection et nettoyage

May 17, 2026 → May 29, 2026

3-14 days

~4,279 m

Insufficient data

AnjouObstructedAutre

May 24, 2026 → May 29, 2026

3-14 days

~4,168 m

Insufficient data

Avg. before construction: 207 (22 days of data)