Track active roadwork that affects bike paths and likely impact on bike traffic.
Total Affected
102
Distinct construction zones impacting a bike path
Bike Paths Blocked
0
Fully closed to cyclists - requires detour
Bike Paths Obstructed
102
Partially obstructed - reduced width or shared lane
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 27, 2026 → Jun 22, 2026 15-60 days | ~157 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | May 18, 2026 → Jul 3, 2026 15-60 days | ~646 m | +29,407.3% vs before Likely increase Avg. before construction: 2 (28 days of data) Avg. during construction: 611 (27 days of data) | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Jun 8, 2026 → Jul 10, 2026 15-60 days | ~966 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,000 m | +620.8% vs before Likely increase Avg. before construction: 49 (28 days of data) Avg. during construction: 351 (47 days of data) | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,000 m | +620.8% vs before Likely increase Avg. before construction: 49 (28 days of data) Avg. during construction: 351 (47 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → Jun 19, 2026 61-180 days | ~690 m | +206.8% vs before Likely increase Avg. before construction: 72 (28 days of data) Avg. during construction: 221 (69 days of data) | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 27, 2026 → Jun 22, 2026 15-60 days | ~157 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → Jun 23, 2026 15-60 days | ~414 m | Insufficient data | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 3, 2026 → Jun 26, 2026 15-60 days | ~3,081 m | +34.5% vs before Likely increase Avg. before construction: 348 (28 days of data) Avg. during construction: 467 (11 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Mar 29, 2026 → Jun 26, 2026 61-180 days | ~965 m | Insufficient data | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 3, 2026 → Jun 26, 2026 15-60 days | ~3,343 m | +34.5% vs before Likely increase Avg. before construction: 348 (28 days of data) Avg. during construction: 467 (11 days of data) | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 3, 2026 → Jun 26, 2026 15-60 days | ~3,691 m | +34.5% vs before Likely increase Avg. before construction: 348 (28 days of data) Avg. during construction: 467 (11 days of data) | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 3, 2026 → Jun 26, 2026 15-60 days | ~3,081 m | +34.5% vs before Likely increase Avg. before construction: 348 (28 days of data) Avg. during construction: 467 (11 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Mar 15, 2026 → Jun 28, 2026 61-180 days | ~720 m | +2,257.5% vs before Likely increase Avg. before construction: 37 (28 days of data) Avg. during construction: 881 (91 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | May 31, 2026 → Jun 30, 2026 15-60 days | ~627 m | Insufficient data | |
| Anjou | Obstructed | Autre | Jan 10, 2026 → Jul 11, 2026 180+ days | ~3,171 m | +590.3% vs before Likely increase Avg. before construction: 34 (28 days of data) Avg. during construction: 235 (155 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation sans excavation | Mar 31, 2026 → Oct 30, 2026 180+ days | ~2,784 m | Insufficient data Avg. before construction: 0 (17 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Égouts et aqueducs - Excavation | May 31, 2026 → Jun 26, 2026 15-60 days | ~705 m | +20.6% vs before Likely increase Avg. before construction: 1,638 (28 days of data) Avg. during construction: 1,976 (14 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 13, 2026 → Jul 3, 2026 15-60 days | ~3,515 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 13, 2026 → Jul 3, 2026 15-60 days | ~3,929 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Inspection | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~1,025 m | Insufficient data Avg. before construction: 423 (27 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | Jun 18, 2026 → Jun 19, 2026 0-2 days | ~1,951 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → Jun 23, 2026 15-60 days | ~414 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Entretien | May 28, 2026 → Jun 29, 2026 15-60 days | ~1,295 m | +24% vs before Likely increase Avg. before construction: 3,401 (28 days of data) Avg. during construction: 4,217 (17 days of data) | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Excavation | Jun 14, 2026 → Jun 30, 2026 15-60 days | ~678 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | AS-2 Réseau aérosouterrain existant | Jun 14, 2026 → Jul 3, 2026 15-60 days | ~3,181 m | Insufficient data Avg. before construction: 655 (28 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Jun 15, 2026 → Jul 4, 2026 15-60 days | ~534 m | Insufficient data Avg. before construction: 423 (27 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Jun 15, 2026 → Jul 4, 2026 15-60 days | ~610 m | Insufficient data Avg. before construction: 423 (27 days of data) | |
| Le Sud-Ouest | Obstructed | Construction/rénovation avec excavation | May 30, 2026 → Jul 10, 2026 15-60 days | ~991 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Autre | May 12, 2026 → Aug 12, 2026 61-180 days | ~605 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | May 27, 2025 → Sep 30, 2026 180+ days | ~692 m | -12.3% vs before Likely decrease Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,122 (283 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Trottoirs - Construction | Jun 9, 2026 → Jun 16, 2026 3-14 days | ~1,603 m | +26.5% vs before Likely increase Avg. before construction: 420 (28 days of data) Avg. during construction: 531 (5 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | Jun 15, 2026 → Jun 25, 2026 3-14 days | ~520 m | Insufficient data Avg. before construction: 1,520 (27 days of data) | |
| St-Laurent | Obstructed | Autre | May 31, 2026 → Jun 27, 2026 15-60 days | ~1,542 m | Insufficient data | |
| Ville-Marie | Obstructed | Construction/rénovation avec excavation | Jun 13, 2026 → Jul 4, 2026 15-60 days | ~72 m | Insufficient data Avg. before construction: 1,348 (28 days of data) Avg. during construction: 1,534 (1 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Jun 17, 2026 → Jul 6, 2026 15-60 days | ~1,180 m | Insufficient data Avg. before construction: 2,162 (25 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 7, 2026 → Jul 17, 2026 15-60 days | ~405 m | +24.9% vs before Likely increase Avg. before construction: 166 (28 days of data) Avg. during construction: 207 (7 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 7, 2026 → Jul 17, 2026 15-60 days | ~402 m | +24.9% vs before Likely increase Avg. before construction: 166 (28 days of data) Avg. during construction: 207 (7 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | May 3, 2026 → Nov 27, 2026 180+ days | ~384 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~484 m | Insufficient data Avg. before construction: 89 (7 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~482 m | Insufficient data Avg. before construction: 89 (6 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | Jun 17, 2026 → Jun 18, 2026 0-2 days | ~1,910 m | Insufficient data Avg. before construction: 465 (25 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | Jun 17, 2026 → Jun 18, 2026 0-2 days | ~723 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Jun 17, 2026 → Jun 18, 2026 0-2 days | ~487 m | Insufficient data Avg. before construction: 94 (5 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Entretien | Jun 17, 2026 → Jun 18, 2026 0-2 days | ~76 m | Insufficient data Avg. before construction: 1,957 (25 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | Jun 18, 2026 → Jun 19, 2026 0-2 days | ~500 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ahuntsic-Cartierville | Obstructed | Autre | May 31, 2026 → Sep 7, 2026 61-180 days | ~319 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 27, 2026 → Jun 19, 2026 15-60 days | ~1,038 m | +34.6% vs before Likely increase Avg. before construction: 1,664 (28 days of data) Avg. during construction: 2,239 (18 days of data) | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 6, 2026 → Jun 23, 2026 15-60 days | ~2,980 m | +13.9% vs before Likely increase Avg. before construction: 390 (28 days of data) Avg. during construction: 445 (8 days of data) | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 3, 2026 → Jun 26, 2026 15-60 days | ~3,070 m | +34.5% vs before Likely increase Avg. before construction: 348 (28 days of data) Avg. during construction: 467 (11 days of data) | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~1,553 m | Insufficient data Avg. during construction: 0 (41 days of data) | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~1,528 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,045 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~1,902 m | +620.8% vs before Likely increase Avg. before construction: 49 (28 days of data) Avg. during construction: 351 (47 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~1,222 m | +51.8% vs before Likely increase Avg. before construction: 271 (28 days of data) Avg. during construction: 412 (27 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~250 m | +51.8% vs before Likely increase Avg. before construction: 271 (28 days of data) Avg. during construction: 412 (27 days of data) | |
| Lachine | Obstructed | Égouts et aqueducs - Excavation | Jun 8, 2026 → Oct 9, 2026 61-180 days | ~6,647 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Déménagement | Jun 17, 2026 → Jun 18, 2026 0-2 days | ~914 m | Insufficient data Avg. before construction: 0 (12 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 24, 2026 → Jun 26, 2026 15-60 days | ~3,625 m | +25.6% vs before Likely increase Avg. before construction: 322 (28 days of data) Avg. during construction: 404 (21 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 24, 2026 → Jun 26, 2026 15-60 days | ~3,463 m | +25.6% vs before Likely increase Avg. before construction: 322 (28 days of data) Avg. during construction: 404 (21 days of data) | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 10, 2026 → Jun 19, 2026 3-14 days | ~3,149 m | Insufficient data Avg. before construction: 403 (28 days of data) Avg. during construction: 428 (4 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Trottoirs - Construction | Jun 11, 2026 → Jun 19, 2026 3-14 days | ~624 m | Insufficient data Avg. before construction: 1,214 (28 days of data) Avg. during construction: 1,498 (3 days of data) | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 10, 2026 → Jun 19, 2026 3-14 days | ~3,520 m | Insufficient data Avg. before construction: 403 (28 days of data) Avg. during construction: 428 (4 days of data) | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 10, 2026 → Jun 19, 2026 3-14 days | ~3,870 m | Insufficient data Avg. before construction: 403 (28 days of data) Avg. during construction: 428 (4 days of data) | |
| Saint-Léonard | Obstructed | Construction/rénovation avec excavation | Jun 10, 2026 → Jun 19, 2026 3-14 days | ~3,940 m | Insufficient data Avg. before construction: 403 (28 days of data) Avg. during construction: 428 (4 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | May 20, 2026 → Jun 26, 2026 15-60 days | ~1,419 m | +42.8% vs before Likely increase Avg. before construction: 291 (28 days of data) Avg. during construction: 416 (25 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Entretien | May 31, 2026 → Jun 26, 2026 15-60 days | ~45 m | +23.3% vs before Likely increase Avg. before construction: 3,513 (28 days of data) Avg. during construction: 4,331 (14 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Égouts et aqueducs - Excavation | May 21, 2026 → Jun 30, 2026 15-60 days | ~771 m | +41.6% vs before Likely increase Avg. before construction: 334 (28 days of data) Avg. during construction: 473 (24 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~2,392 m | +43.4% vs before Likely increase Avg. before construction: 456 (28 days of data) Avg. during construction: 653 (24 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~2,096 m | +43.4% vs before Likely increase Avg. before construction: 456 (28 days of data) Avg. during construction: 653 (24 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~1,668 m | +43.4% vs before Likely increase Avg. before construction: 456 (28 days of data) Avg. during construction: 653 (24 days of data) | |
| Verdun | Obstructed | Construction/rénovation avec excavation | Jun 9, 2026 → Jul 31, 2026 15-60 days | ~561 m | +7% vs before Likely stable Avg. before construction: 472 (28 days of data) Avg. during construction: 505 (5 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 13, 2026 → Jul 3, 2026 15-60 days | ~3,929 m | Insufficient data | |
| Lachine | Obstructed | Égouts et aqueducs - Excavation | Jun 8, 2026 → Oct 9, 2026 61-180 days | ~6,647 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Autre | Jun 7, 2026 → Jun 19, 2026 3-14 days | ~469 m | -5% vs before Likely stable Avg. before construction: 1,851 (28 days of data) Avg. during construction: 1,759 (7 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Autre | May 26, 2026 → Jun 26, 2026 15-60 days | ~89 m | +88.8% vs before Likely increase Avg. before construction: 1,492 (28 days of data) Avg. during construction: 2,817 (19 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation avec excavation | Jun 16, 2026 → Jun 26, 2026 3-14 days | ~595 m | Insufficient data Avg. before construction: 89 (6 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | Jun 16, 2026 → Jun 18, 2026 0-2 days | ~504 m | Insufficient data | |
| Ville-Marie | Obstructed | Construction/rénovation sans excavation | Jun 14, 2026 → Jul 3, 2026 15-60 days | ~286 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Mar 10, 2026 → Sep 1, 2026 61-180 days | ~2,407 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Égouts et aqueducs - Excavation | Jun 16, 2026 → Jun 18, 2026 0-2 days | ~1,184 m | Insufficient data Avg. before construction: 658 (26 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | Jun 4, 2026 → Jun 26, 2026 15-60 days | ~482 m | +16.2% vs before Likely increase Avg. before construction: 2,493 (28 days of data) Avg. during construction: 2,895 (10 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 13, 2026 → Jul 3, 2026 15-60 days | ~3,515 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Entretien | Jun 16, 2026 → Jun 23, 2026 3-14 days | ~68 m | Insufficient data Avg. before construction: 2,734 (26 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Entretien | May 31, 2026 → Jun 26, 2026 15-60 days | ~1,092 m | +36.1% vs before Likely increase Avg. before construction: 1,250 (28 days of data) Avg. during construction: 1,701 (14 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 1, 2026 → Oct 2, 2026 180+ days | ~3,647 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Construction/rénovation sans excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~96 m | +301.6% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 865 (84 days of data) | |
| Le Sud-Ouest | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | Jun 7, 2026 → Jun 19, 2026 3-14 days | ~788 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Entretien | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~636 m | Insufficient data Avg. before construction: 2,147 (27 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Entretien | Jun 14, 2026 → Jun 17, 2026 3-14 days | ~366 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Inspection | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~1,119 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | Jun 14, 2026 → Jun 26, 2026 3-14 days | ~329 m | Insufficient data Avg. before construction: 3,275 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~250 m | +51.8% vs before Likely increase Avg. before construction: 271 (28 days of data) Avg. during construction: 412 (27 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~1,222 m | +51.8% vs before Likely increase Avg. before construction: 271 (28 days of data) Avg. during construction: 412 (27 days of data) | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Inspection et nettoyage | Jun 11, 2026 → Jun 22, 2026 3-14 days | ~851 m | Insufficient data Avg. before construction: 2,057 (28 days of data) Avg. during construction: 2,318 (3 days of data) | |
| Le Sud-Ouest | Obstructed | Trottoirs - Construction | Jun 18, 2026 → Jul 13, 2026 15-60 days | ~1,546 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Le Sud-Ouest | Obstructed | Autre | Mar 3, 2024 → Dec 23, 2026 180+ days | ~661 m | +403.3% vs before Likely increase Avg. before construction: 257 (28 days of data) Avg. during construction: 1,296 (833 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Toiture - Rénovation | Jun 18, 2026 → Jun 19, 2026 0-2 days | ~1,436 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| St-Laurent | Obstructed | Construction/rénovation sans excavation | Jun 9, 2026 → Jun 16, 2026 3-14 days | ~3,767 m | +282.4% vs before Likely increase Avg. before construction: 350 (28 days of data) Avg. during construction: 1,339 (5 days of data) | |
| St-Laurent | Obstructed | Déménagement | Jun 14, 2026 → Jun 16, 2026 0-2 days | ~3,520 m | Insufficient data Avg. before construction: 589 (28 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Jun 13, 2026 → Jul 3, 2026 15-60 days | ~4,517 m | Insufficient data |