Track active roadwork that affects bike paths and likely impact on bike traffic.
Total Affected
97
Distinct construction zones impacting a bike path
Bike Paths Blocked
0
Fully closed to cyclists - requires detour
Bike Paths Obstructed
97
Partially obstructed - reduced width or shared lane
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 27, 2026 → Jun 22, 2026 15-60 days | ~157 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | May 18, 2026 → Jul 3, 2026 15-60 days | ~646 m | Insufficient data Avg. before construction: 19 (3 days of data) | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,000 m | Insufficient data Avg. before construction: 59 (23 days of data) | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,000 m | Insufficient data Avg. before construction: 59 (23 days of data) | |
| St-Laurent | Obstructed | Autre | May 24, 2026 → May 27, 2026 3-14 days | ~1,982 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | May 24, 2026 → May 27, 2026 3-14 days | ~1,982 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → Jun 12, 2026 61-180 days | ~690 m | +114.5% vs before Likely increase Avg. before construction: 72 (28 days of data) Avg. during construction: 154 (42 days of data) | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 27, 2026 → Jun 22, 2026 15-60 days | ~157 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation sans excavation | May 21, 2026 → May 23, 2026 0-2 days | ~641 m | Insufficient data Avg. before construction: 779 (25 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 5, 2026 → May 26, 2026 15-60 days | ~3,285 m | -12.2% vs before Likely decrease Avg. before construction: 179 (28 days of data) Avg. during construction: 157 (13 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Égouts et aqueducs - Excavation | May 21, 2026 → May 26, 2026 3-14 days | ~1,961 m | Insufficient data Avg. before construction: 300 (25 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 12, 2026 → May 29, 2026 15-60 days | ~3,508 m | -75.7% vs before Likely decrease Avg. before construction: 227 (28 days of data) Avg. during construction: 55 (6 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Mar 29, 2026 → May 29, 2026 61-180 days | ~965 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Autre | May 24, 2026 → May 30, 2026 3-14 days | ~826 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → Jun 19, 2026 15-60 days | ~414 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | Mar 15, 2026 → Jun 5, 2026 61-180 days | ~720 m | +1,202.7% vs before Likely increase Avg. before construction: 37 (28 days of data) Avg. during construction: 487 (64 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation sans excavation | Mar 31, 2026 → Oct 30, 2026 180+ days | ~2,784 m | Insufficient data Avg. before construction: 0 (17 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Mar 31, 2026 → May 29, 2026 15-60 days | ~1,627 m | +851.3% vs before Likely increase Avg. before construction: 19 (28 days of data) Avg. during construction: 178 (48 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Autre | May 24, 2026 → May 29, 2026 3-14 days | ~99 m | Insufficient data Avg. before construction: 1,725 (22 days of data) | |
| Ville-Marie | Obstructed | Égouts et aqueducs - Réhabilitation | May 24, 2026 → Jun 10, 2026 15-60 days | ~517 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Autre | May 22, 2026 → May 24, 2026 0-2 days | ~496 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Autre | Mar 31, 2026 → May 29, 2026 15-60 days | ~1,627 m | +851.3% vs before Likely increase Avg. before construction: 19 (28 days of data) Avg. during construction: 178 (48 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | Apr 6, 2026 → May 31, 2026 15-60 days | ~918 m | +2,252.7% vs before Likely increase Avg. before construction: 7 (28 days of data) Avg. during construction: 168 (42 days of data) | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,315 m | Insufficient data | |
| Anjou | Obstructed | Autre | Jan 10, 2026 → Jun 11, 2026 61-180 days | ~3,171 m | +284.3% vs before Likely increase Avg. before construction: 34 (28 days of data) Avg. during construction: 131 (128 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Entretien | May 25, 2026 → May 28, 2026 3-14 days | ~397 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Montréal-Nord | Obstructed | Autre | May 24, 2026 → May 29, 2026 3-14 days | ~3,362 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | May 6, 2026 → May 31, 2026 15-60 days | ~952 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Trottoirs - Construction | May 19, 2026 → Jun 5, 2026 15-60 days | ~1,163 m | Insufficient data Avg. before construction: 297 (27 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | S-3 Infrastructure souterraine majeure - Puits d'accès | May 11, 2026 → Jun 19, 2026 15-60 days | ~414 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Autre | May 12, 2026 → Aug 12, 2026 61-180 days | ~605 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | May 27, 2025 → Sep 30, 2026 180+ days | ~692 m | -12.3% vs before Likely decrease Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,122 (283 days of data) | |
| Anjou | Obstructed | Autre | May 18, 2026 → May 26, 2026 3-14 days | ~4,229 m | Insufficient data Avg. before construction: 342 (28 days of data) | |
| Anjou | Obstructed | Autre | May 18, 2026 → May 26, 2026 3-14 days | ~4,228 m | Insufficient data Avg. before construction: 342 (28 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Autre | May 25, 2026 → May 29, 2026 3-14 days | ~1,870 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,253 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | May 3, 2026 → Nov 27, 2026 180+ days | ~384 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 22, 2026 → May 23, 2026 0-2 days | ~448 m | Insufficient data Avg. before construction: 1,923 (24 days of data) | |
| Ahuntsic-Cartierville | Obstructed | Entretien | May 23, 2026 → May 24, 2026 0-2 days | ~1,466 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Inspection | May 23, 2026 → May 24, 2026 0-2 days | ~1,141 m | Insufficient data | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation sans excavation | May 24, 2026 → May 25, 2026 0-2 days | ~502 m | Insufficient data | |
| Montréal-Nord | Obstructed | Entretien | May 24, 2026 → May 25, 2026 0-2 days | ~2,720 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 24, 2026 → May 25, 2026 0-2 days | ~462 m | Insufficient data Avg. before construction: 1,872 (22 days of data) | |
| Montréal-Nord | Obstructed | Entretien | May 25, 2026 → May 26, 2026 0-2 days | ~2,945 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 25, 2026 → May 26, 2026 0-2 days | ~419 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 25, 2026 → May 26, 2026 0-2 days | ~484 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → May 29, 2026 3-14 days | ~1,833 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~1,553 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~1,528 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~2,045 m | Insufficient data | |
| St-Laurent | Obstructed | Autre | Apr 28, 2026 → Jul 22, 2026 61-180 days | ~1,902 m | Insufficient data Avg. before construction: 59 (23 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~1,222 m | Insufficient data Avg. before construction: 207 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~250 m | Insufficient data Avg. before construction: 207 (28 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 24, 2026 → May 26, 2026 0-2 days | ~294 m | Insufficient data Avg. before construction: 2,586 (22 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | Construction/rénovation avec excavation | May 24, 2026 → May 26, 2026 0-2 days | ~284 m | Insufficient data Avg. before construction: 2,586 (22 days of data) | |
| Anjou | Obstructed | Autre | May 10, 2026 → Jun 11, 2026 15-60 days | ~3,192 m | -40.7% vs before Likely decrease Avg. before construction: 347 (28 days of data) Avg. during construction: 206 (8 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 24, 2026 → Jun 26, 2026 15-60 days | ~3,463 m | Insufficient data Avg. before construction: 207 (22 days of data) | |
| Montréal-Nord | Obstructed | Autre | May 24, 2026 → Jun 26, 2026 15-60 days | ~3,625 m | Insufficient data Avg. before construction: 207 (22 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 25, 2026 → Jun 3, 2026 3-14 days | ~381 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation sans excavation | May 21, 2026 → Jun 12, 2026 15-60 days | ~857 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 12, 2026 61-180 days | ~4,522 m | Insufficient data | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | May 20, 2026 → Jun 26, 2026 15-60 days | ~1,419 m | Insufficient data Avg. before construction: 216 (26 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Obstructed | Égouts et aqueducs - Excavation | May 21, 2026 → Jun 30, 2026 15-60 days | ~771 m | Insufficient data Avg. before construction: 316 (25 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~2,096 m | Insufficient data Avg. before construction: 349 (25 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~2,392 m | Insufficient data Avg. before construction: 349 (25 days of data) | |
| Anjou | Obstructed | Trottoirs - Construction | May 21, 2026 → Jul 3, 2026 15-60 days | ~1,668 m | Insufficient data Avg. before construction: 349 (25 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | May 24, 2026 → May 25, 2026 0-2 days | ~1,911 m | Insufficient data Avg. before construction: 301 (22 days of data) | |
| Montréal-Nord | Obstructed | Construction/rénovation avec excavation | May 24, 2026 → May 29, 2026 3-14 days | ~3,990 m | Insufficient data Avg. before construction: 207 (22 days of data) | |
| St-Laurent | Obstructed | Construction/rénovation avec excavation | May 20, 2026 → May 26, 2026 3-14 days | ~1,613 m | Insufficient data Avg. before construction: 0 (1 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Égouts et aqueducs - Inspection et nettoyage | May 17, 2026 → May 28, 2026 3-14 days | ~80 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Obstructed | S-1 Infrastructure souterraine existante | May 21, 2026 → May 28, 2026 3-14 days | ~538 m | Insufficient data Avg. before construction: 296 (25 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | May 24, 2026 → May 30, 2026 3-14 days | ~826 m | Insufficient data | |
| Montréal-Nord | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 5, 2026 3-14 days | ~3,440 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 5, 2026 3-14 days | ~2,167 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Autre | May 24, 2026 → May 25, 2026 0-2 days | ~5,242 m | Insufficient data | |
| St-Laurent | Obstructed | Entretien | May 25, 2026 → May 27, 2026 0-2 days | ~2,121 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Mar 10, 2026 → Sep 1, 2026 61-180 days | ~2,407 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 27, 2026 15-60 days | ~4,572 m | Insufficient data | |
| Ville-Marie | Obstructed | Construction/rénovation sans excavation | May 12, 2026 → Jun 13, 2026 15-60 days | ~286 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | Apr 1, 2026 → Oct 2, 2026 180+ days | ~3,647 m | Insufficient data | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Inspection et nettoyage | May 18, 2026 → May 28, 2026 3-14 days | ~1,193 m | Insufficient data Avg. before construction: 1,319 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Construction/rénovation avec excavation | May 19, 2026 → May 29, 2026 3-14 days | ~2,964 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation avec excavation | May 25, 2026 → May 29, 2026 3-14 days | ~1,410 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,315 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Obstructed | Construction/rénovation sans excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~96 m | +142% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 521 (45 days of data) | |
| Ville-Marie | Obstructed | Autre | May 21, 2026 → Jun 1, 2026 3-14 days | ~518 m | Insufficient data | |
| Ahuntsic-Cartierville | Obstructed | Réseaux routier - Réfection et travaux corrélatifs | May 24, 2026 → Jun 5, 2026 3-14 days | ~2,504 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Lachine | Obstructed | Construction/rénovation avec excavation | Apr 12, 2026 → May 31, 2026 15-60 days | ~4,257 m | Insufficient data | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Entretien | May 24, 2026 → May 25, 2026 0-2 days | ~2,908 m | Insufficient data Avg. before construction: 2,056 (22 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~250 m | Insufficient data Avg. before construction: 207 (28 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Obstructed | Entretien | May 18, 2026 → Jul 31, 2026 61-180 days | ~1,222 m | Insufficient data Avg. before construction: 207 (28 days of data) | |
| Le Sud-Ouest | Obstructed | Autre | Mar 3, 2024 → Dec 23, 2026 180+ days | ~661 m | +389.1% vs before Likely increase Avg. before construction: 257 (28 days of data) Avg. during construction: 1,259 (806 days of data) | |
| Montréal-Nord | Obstructed | Égouts et aqueducs - Inspection et nettoyage | May 17, 2026 → May 29, 2026 3-14 days | ~4,279 m | Insufficient data | |
| Anjou | Obstructed | Autre | May 24, 2026 → May 29, 2026 3-14 days | ~4,168 m | Insufficient data Avg. before construction: 207 (22 days of data) |