Construction Impact

Track active roadwork that affects bike paths and likely impact on bike traffic.

Source: Ville de Montreal - active construction permits with bike path impacts, updated daily.Snapshot date:May 24, 2026

Total Affected

103

Distinct construction zones impacting a bike path

Bike Paths Blocked

103

Fully closed to cyclists - requires detour

Bike Paths Obstructed

0

Partially obstructed - reduced width or shared lane

Status
AllBlockedObstructed
Borough
Reason
Duration
All0-2 days3-14 days15-60 days61-180 days180+ days
Clear filters

Active Bike Path Blockages(103)

Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.

StreetBoroughStatusReasonDurationNearest CounterVolume Impact
Le Plateau-Mont-RoyalBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz

May 18, 2026 → May 29, 2026

3-14 days

~454 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Mar 29, 2026 → Jun 1, 2026

61-180 days

~675 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Apr 12, 2026 → Jun 1, 2026

15-60 days

~674 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedÉgouts et aqueducs - Excavation

May 17, 2026 → Jun 5, 2026

15-60 days

~1,733 m

Insufficient data

Avg. before construction: 283 (28 days of data)

Avg. during construction: 279 (1 days of data)

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

May 24, 2026 → Jun 5, 2026

3-14 days

~618 m

Insufficient data

Avg. before construction: 774 (22 days of data)

Ahuntsic-CartiervilleBlockedAutre

Apr 26, 2026 → Jun 8, 2026

15-60 days

~243 m

+96.4% vs before

Likely increase

Avg. before construction: 72 (28 days of data)

Avg. during construction: 142 (22 days of data)

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Jun 11, 2026

15-60 days

~2,135 m

Insufficient data

Avg. before construction: 283 (28 days of data)

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Mar 31, 2026 → Jun 12, 2026

61-180 days

~1,557 m

Insufficient data

Rosemont-La Petite-PatrieBlockedAutre

May 10, 2026 → Jun 23, 2026

15-60 days

~515 m

+782.9% vs before

Likely increase

Avg. before construction: 173 (28 days of data)

Avg. during construction: 1,525 (8 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Apr 12, 2026 → Jun 26, 2026

61-180 days

~166 m

+177% vs before

Likely increase

Avg. before construction: 387 (28 days of data)

Avg. during construction: 1,071 (36 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Apr 12, 2026 → Jun 26, 2026

61-180 days

~166 m

+177% vs before

Likely increase

Avg. before construction: 387 (28 days of data)

Avg. during construction: 1,071 (36 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

Apr 12, 2026 → Jun 30, 2026

61-180 days

~1,240 m

+1,125% vs before

Likely increase

Avg. before construction: 15 (28 days of data)

Avg. during construction: 189 (36 days of data)

Le Sud-OuestBlockedÉgouts et aqueducs - Réhabilitation

Apr 19, 2026 → Jul 10, 2026

61-180 days

~1,029 m

Insufficient data

Ahuntsic-CartiervilleBlockedAutre

May 12, 2026 → Aug 12, 2026

61-180 days

~605 m

Insufficient data

Rosemont-La Petite-PatrieBlockedRéseaux routier - Réfection et travaux corrélatifs

May 9, 2026 → Aug 16, 2026

61-180 days

~611 m

+25.8% vs before

Likely increase

Avg. before construction: 1,262 (28 days of data)

Avg. during construction: 1,588 (9 days of data)

Ville-MarieBlockedAutre

May 10, 2026 → Sep 8, 2026

61-180 days

~645 m

-36.2% vs before

Likely decrease

Avg. before construction: 1,806 (28 days of data)

Avg. during construction: 1,153 (8 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~71 m

+142% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 521 (45 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~79 m

+142% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 521 (45 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 12, 2026 → Oct 13, 2026

61-180 days

~4,648 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 12, 2026 → Oct 13, 2026

61-180 days

~4,628 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Mar 29, 2026 → Oct 30, 2026

180+ days

~668 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 6, 2026 → Oct 30, 2026

180+ days

~464 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 11, 2026 → Oct 30, 2026

180+ days

~283 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Apr 11, 2026 → Oct 30, 2026

180+ days

~206 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation sans excavation

Mar 8, 2026 → Oct 31, 2026

180+ days

~47 m

+222.9% vs before

Likely increase

Avg. before construction: 149 (28 days of data)

Avg. during construction: 481 (71 days of data)

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Jan 25, 2026 → Dec 31, 2026

180+ days

~56 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 24, 2026 → May 29, 2026

3-14 days

~109 m

Insufficient data

Ville-MarieBlockedConstruction/rénovation avec excavation

Feb 10, 2026 → Jul 17, 2026

61-180 days

~306 m

Insufficient data

Avg. during construction: 4,026 (33 days of data)

Le Plateau-Mont-RoyalBlockedRéseaux routier - Réfection et travaux corrélatifs

May 9, 2026 → Aug 16, 2026

61-180 days

~630 m

+25.8% vs before

Likely increase

Avg. before construction: 1,262 (28 days of data)

Avg. during construction: 1,588 (9 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

Jan 12, 2025 → Aug 29, 2026

180+ days

~734 m

Insufficient data

Avg. during construction: 940 (93 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

May 18, 2026 → May 29, 2026

3-14 days

~414 m

Insufficient data

Avg. before construction: 2,665 (28 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation avec excavation

May 18, 2026 → May 29, 2026

3-14 days

~297 m

Insufficient data

Avg. before construction: 2,665 (28 days of data)

Le Plateau-Mont-RoyalBlockedToiture - Rénovation

May 24, 2026 → May 29, 2026

3-14 days

~547 m

Insufficient data

Avg. before construction: 3,019 (22 days of data)

Ville-MarieBlockedAutre

May 24, 2026 → May 29, 2026

3-14 days

~294 m

Insufficient data

Avg. before construction: 3,019 (22 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 19, 2026 → May 29, 2026

3-14 days

~2,555 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 19, 2026 → May 29, 2026

3-14 days

~2,785 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 19, 2026 → May 29, 2026

3-14 days

~2,957 m

Insufficient data

Ville-MarieBlockedAutre

May 21, 2026 → Jun 1, 2026

3-14 days

~542 m

Insufficient data

Le Plateau-Mont-RoyalBlockedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → Jun 3, 2026

3-14 days

~144 m

Insufficient data

Le Plateau-Mont-RoyalBlockedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → Jun 3, 2026

3-14 days

~349 m

Insufficient data

Ahuntsic-CartiervilleBlockedS-3 Infrastructure souterraine majeure - Massifs et conduits

May 3, 2026 → May 31, 2026

15-60 days

~918 m

Insufficient data

Le Sud-OuestBlockedÉgouts et aqueducs - Réhabilitation

May 6, 2026 → May 31, 2026

15-60 days

~952 m

Insufficient data

Ville-MarieBlockedS-3 Infrastructure souterraine majeure - Puits d'accès

May 15, 2026 → Jun 5, 2026

15-60 days

~233 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

Apr 20, 2026 → Jul 17, 2026

61-180 days

~1,202 m

Insufficient data

Le Plateau-Mont-RoyalBlockedRéseaux routier - Réfection et travaux corrélatifs

May 18, 2026 → May 24, 2026

3-14 days

~171 m

Insufficient data

Ville-MarieBlockedAutre

May 21, 2026 → May 25, 2026

3-14 days

~295 m

Insufficient data

Avg. before construction: 0 (25 days of data)

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

May 25, 2026 → May 29, 2026

3-14 days

~1,276 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

OutremontBlockedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → May 25, 2026

0-2 days

~420 m

Insufficient data

Ahuntsic-CartiervilleBlockedS-3 Infrastructure souterraine majeure - Massifs et conduits

May 3, 2026 → May 31, 2026

15-60 days

~918 m

Insufficient data

Côte-des-Neiges-Notre-Dame-de-GrâceBlockedConstruction/rénovation sans excavation

Mar 31, 2026 → May 31, 2026

61-180 days

~211 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedAutre

May 24, 2026 → Jun 25, 2026

15-60 days

~1,227 m

Insufficient data

Avg. before construction: 207 (22 days of data)

Ville-MarieBlockedEntretien

May 24, 2026 → May 25, 2026

0-2 days

~481 m

Insufficient data

Avg. before construction: 1,725 (22 days of data)

Ville-MarieBlockedEntretien

May 24, 2026 → May 25, 2026

0-2 days

~364 m

Insufficient data

Avg. before construction: 731 (22 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

May 25, 2026 → May 26, 2026

0-2 days

~1,041 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation avec excavation

Mar 22, 2026 → Oct 1, 2026

180+ days

~92 m

+142% vs before

Likely increase

Avg. before construction: 215 (28 days of data)

Avg. during construction: 521 (45 days of data)

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,758 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,679 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Dec 18, 2026

180+ days

~1,758 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedÉgouts et aqueducs - Excavation

May 25, 2026 → May 27, 2026

0-2 days

~1,418 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ville-MarieBlockedÉgouts et aqueducs - Réhabilitation

Mar 29, 2026 → Jun 1, 2026

61-180 days

~675 m

Insufficient data

Le Plateau-Mont-RoyalBlockedAutre

Mar 22, 2026 → Jun 4, 2026

61-180 days

~229 m

Insufficient data

AnjouBlockedAutre

May 18, 2026 → Jun 19, 2026

15-60 days

~3,191 m

Insufficient data

Avg. before construction: 342 (28 days of data)

Ville-MarieBlockedEntretien

May 20, 2026 → May 24, 2026

3-14 days

~705 m

Insufficient data

Avg. before construction: 1,787 (26 days of data)

Le Plateau-Mont-RoyalBlockedAutre

May 24, 2026 → May 29, 2026

3-14 days

~437 m

Insufficient data

Avg. before construction: 1,727 (22 days of data)

Rosemont-La Petite-PatrieBlockedRéseaux routier - Réfection et travaux corrélatifs

May 18, 2026 → May 29, 2026

3-14 days

~638 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedA-1 Réseau aérien existant

May 25, 2026 → May 26, 2026

0-2 days

~2,679 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Ahuntsic-CartiervilleBlockedToiture - Rénovation

May 24, 2026 → May 26, 2026

0-2 days

~2,313 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedÉgouts et aqueducs - Excavation

May 24, 2026 → May 29, 2026

3-14 days

~109 m

Insufficient data

Ville-MarieBlockedÉgouts et aqueducs - Excavation

Apr 12, 2026 → Jun 1, 2026

15-60 days

~674 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedAutre

May 5, 2026 → Jun 12, 2026

15-60 days

~3,233 m

+64.8% vs before

Likely increase

Avg. before construction: 167 (28 days of data)

Avg. during construction: 276 (13 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedAutre

May 13, 2026 → Jun 12, 2026

15-60 days

~338 m

+72.3% vs before

Likely increase

Avg. before construction: 212 (28 days of data)

Avg. during construction: 365 (5 days of data)

Rivière-des-Prairies-Pointe-aux-TremblesBlockedAutre

May 10, 2026 → Jun 19, 2026

15-60 days

~4,334 m

Insufficient data

Montréal-NordBlockedAutre

May 24, 2026 → Jun 25, 2026

15-60 days

~3,382 m

Insufficient data

Avg. before construction: 207 (22 days of data)

Le Plateau-Mont-RoyalBlockedConstruction/rénovation sans excavation

Apr 30, 2026 → Jun 1, 2026

15-60 days

~485 m

+3% vs before

Likely stable

Avg. before construction: 1,486 (28 days of data)

Avg. during construction: 1,531 (18 days of data)

Ahuntsic-CartiervilleBlockedAutre

May 14, 2026 → Jun 30, 2026

15-60 days

~3,621 m

Insufficient data

Villeray-Saint-Michel-Parc-ExtensionBlockedConstruction/rénovation sans excavation

Apr 23, 2026 → Oct 1, 2026

61-180 days

~38 m

+95.4% vs before

Likely increase

Avg. before construction: 605 (28 days of data)

Avg. during construction: 1,182 (25 days of data)

Ahuntsic-CartiervilleBlockedRéseaux routier - Réfection et travaux corrélatifs

May 5, 2026 → Jul 17, 2026

61-180 days

~1,798 m

Insufficient data

Ahuntsic-CartiervilleBlockedRéseaux routier - Réfection et travaux corrélatifs

May 5, 2026 → Jul 17, 2026

61-180 days

~1,856 m

Insufficient data

Rosemont-La Petite-PatrieBlockedConstruction/rénovation sans excavation

May 19, 2026 → May 25, 2026

3-14 days

~2,711 m

Insufficient data

Avg. before construction: 297 (27 days of data)

Le Plateau-Mont-RoyalBlockedConstruction/rénovation sans excavation

May 24, 2026 → May 27, 2026

3-14 days

~990 m

Insufficient data

Avg. before construction: 1,542 (22 days of data)

Ahuntsic-CartiervilleBlockedÉgouts et aqueducs - Inspection et nettoyage

May 24, 2026 → May 28, 2026

3-14 days

~456 m

Insufficient data

Avg. before construction: 142 (22 days of data)

Ville-MarieBlockedAutre

May 25, 2026 → May 29, 2026

3-14 days

~201 m

Upcoming

Construction hasn't started yet — impact data will appear once it begins.

Le Plateau-Mont-RoyalBlockedÉgouts et aqueducs - Excavation

May 18, 2026 → Jun 12, 2026

15-60 days

~271 m

Insufficient data

Avg. before construction: 1,773 (28 days of data)

LachineBlockedConstruction/rénovation sans excavation

Apr 19, 2026 → Jul 17, 2026

61-180 days

~6,263 m

Insufficient data

OutremontBlockedConstruction/rénovation sans excavation

Mar 25, 2026 → Jul 18, 2026

61-180 days

~1,189 m

+361.3% vs before

Likely increase

Avg. before construction: 311 (28 days of data)

Avg. during construction: 1,435 (54 days of data)

Le Sud-OuestBlockedÉgouts et aqueducs - Inspection et nettoyage

May 17, 2026 → May 28, 2026

3-14 days

~851 m

Insufficient data

Avg. before construction: 1,327 (28 days of data)

Avg. during construction: 83 (1 days of data)

Rosemont-La Petite-PatrieBlockedConstruction/rénovation sans excavation

May 5, 2026 → May 29, 2026

15-60 days

~669 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 19, 2026 → May 29, 2026

3-14 days

~3,043 m

Insufficient data

Rivière-des-Prairies-Pointe-aux-TremblesBlockedConstruction/rénovation avec excavation

May 19, 2026 → May 29, 2026

3-14 days

~3,043 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation sans excavation

May 22, 2026 → Jun 19, 2026

15-60 days

~1,123 m

Insufficient data

Le Plateau-Mont-RoyalBlockedRéseaux routier - Réfection et travaux corrélatifs

May 18, 2026 → May 24, 2026

3-14 days

~171 m

Insufficient data

Ahuntsic-CartiervilleBlockedConstruction/rénovation avec excavation

May 18, 2026 → May 28, 2026

3-14 days

~1,435 m

Insufficient data

Le Plateau-Mont-RoyalBlockedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → Jun 3, 2026

3-14 days

~144 m

Insufficient data

OutremontBlockedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → Jun 3, 2026

3-14 days

~441 m

Insufficient data

Mercier-Hochelaga-MaisonneuveBlockedConstruction/rénovation avec excavation

May 3, 2026 → May 29, 2026

15-60 days

~1,446 m

-1.6% vs before

Likely stable

Avg. before construction: 290 (28 days of data)

Avg. during construction: 286 (15 days of data)

Le Plateau-Mont-RoyalBlockedAutre

May 24, 2026 → Jun 12, 2026

15-60 days

~184 m

Insufficient data

Avg. before construction: 1,923 (22 days of data)

OutremontBlockedRéseaux routier - Réfection et travaux corrélatifs

May 24, 2026 → Jun 3, 2026

3-14 days

~568 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation sans excavation

May 24, 2026 → May 25, 2026

0-2 days

~870 m

Insufficient data

Le Sud-OuestBlockedConstruction/rénovation avec excavation

May 19, 2026 → Jun 5, 2026

15-60 days

~915 m

Insufficient data

Le Plateau-Mont-RoyalBlockedS-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz

May 20, 2026 → May 28, 2026

3-14 days

~1,009 m

Insufficient data

Avg. before construction: 1,575 (26 days of data)