Track active roadwork that affects bike paths and likely impact on bike traffic.
Total Affected
115
Distinct construction zones impacting a bike path
Bike Paths Blocked
115
Fully closed to cyclists - requires detour
Bike Paths Obstructed
0
Partially obstructed - reduced width or shared lane
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Ville-Marie | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | Jun 7, 2026 → Jun 19, 2026 3-14 days | ~661 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 18, 2026 → Jun 22, 2026 3-14 days | ~2,104 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Rosemont-La Petite-Patrie | Blocked | Autre | May 10, 2026 → Jun 23, 2026 15-60 days | ~515 m | +901.7% vs before Likely increase Avg. before construction: 173 (28 days of data) Avg. during construction: 1,730 (35 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 26, 2026 61-180 days | ~166 m | +298.2% vs before Likely increase Avg. before construction: 387 (28 days of data) Avg. during construction: 1,540 (63 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Apr 12, 2026 → Jun 26, 2026 61-180 days | ~166 m | +298.2% vs before Likely increase Avg. before construction: 387 (28 days of data) Avg. during construction: 1,540 (63 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Égouts et aqueducs - Excavation | Jun 1, 2026 → Jul 1, 2026 15-60 days | ~1,702 m | +35.8% vs before Likely increase Avg. before construction: 367 (28 days of data) Avg. during construction: 499 (13 days of data) | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Réhabilitation | Apr 19, 2026 → Jul 10, 2026 61-180 days | ~1,029 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Autre | May 12, 2026 → Aug 12, 2026 61-180 days | ~605 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 9, 2026 → Aug 16, 2026 61-180 days | ~611 m | +64.2% vs before Likely increase Avg. before construction: 1,262 (28 days of data) Avg. during construction: 2,072 (36 days of data) | |
| Ville-Marie | Blocked | Autre | May 10, 2026 → Sep 8, 2026 61-180 days | ~645 m | +45.8% vs before Likely increase Avg. before construction: 1,806 (28 days of data) Avg. during construction: 2,633 (35 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~79 m | +301.6% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 865 (84 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~71 m | +301.6% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 865 (84 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Jun 1, 2026 → Oct 1, 2026 61-180 days | ~170 m | +16.5% vs before Likely increase Avg. before construction: 1,676 (28 days of data) Avg. during construction: 1,953 (13 days of data) | |
| Lachine | Blocked | Égouts et aqueducs - Excavation | Jun 8, 2026 → Oct 9, 2026 61-180 days | ~6,484 m | Insufficient data | |
| Lachine | Blocked | Égouts et aqueducs - Excavation | Jun 8, 2026 → Oct 9, 2026 61-180 days | ~6,647 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,648 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | May 12, 2026 → Oct 13, 2026 61-180 days | ~4,628 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Mar 29, 2026 → Oct 30, 2026 180+ days | ~668 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~283 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Apr 11, 2026 → Oct 30, 2026 180+ days | ~206 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Mar 8, 2026 → Oct 31, 2026 180+ days | ~47 m | +413.5% vs before Likely increase Avg. before construction: 149 (28 days of data) Avg. during construction: 765 (98 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jun 4, 2026 → Dec 11, 2026 180+ days | ~258 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jan 25, 2026 → Dec 31, 2026 180+ days | ~56 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Jun 10, 2026 → Jun 11, 2027 180+ days | ~594 m | Insufficient data Avg. before construction: 1,279 (28 days of data) Avg. during construction: 1,475 (4 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation sans excavation | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~945 m | Insufficient data Avg. before construction: 423 (27 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Feb 10, 2026 → Jul 17, 2026 61-180 days | ~306 m | Insufficient data Avg. during construction: 4,026 (33 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 9, 2026 → Aug 16, 2026 61-180 days | ~630 m | +64.2% vs before Likely increase Avg. before construction: 1,262 (28 days of data) Avg. during construction: 2,072 (36 days of data) | |
| Rosemont-La Petite-Patrie | Blocked | Construction/rénovation avec excavation | Jan 12, 2025 → Aug 29, 2026 180+ days | ~734 m | Insufficient data Avg. during construction: 880 (100 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Construction/rénovation sans excavation | Jun 14, 2026 → Oct 1, 2027 180+ days | ~253 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Jun 23, 2026 3-14 days | ~417 m | Insufficient data Avg. before construction: 693 (28 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Égouts et aqueducs - Excavation | Jun 15, 2026 → Jun 17, 2026 0-2 days | ~1,961 m | Insufficient data Avg. before construction: 465 (27 days of data) | |
| Montréal-Nord | Blocked | Entretien | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~4,232 m | Insufficient data | |
| Le Sud-Ouest | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions | Jun 3, 2026 → Jun 18, 2026 15-60 days | ~1,438 m | Insufficient data Avg. before construction: 0 (26 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation avec excavation | May 31, 2026 → Jul 3, 2026 15-60 days | ~215 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | Apr 20, 2026 → Jul 17, 2026 61-180 days | ~1,202 m | Insufficient data Avg. during construction: 0 (41 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Entretien | Jun 17, 2026 → Jun 18, 2026 0-2 days | ~1,066 m | Insufficient data Avg. before construction: 416 (25 days of data) | |
| Ville-Marie | Blocked | S-3 Infrastructure souterraine majeure - Puits d'accès | Jun 5, 2026 → Jun 17, 2026 3-14 days | ~254 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation sans excavation | Jun 14, 2026 → Jun 19, 2026 3-14 days | ~502 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 24, 2026 → Jun 25, 2026 15-60 days | ~1,227 m | +25.6% vs before Likely increase Avg. before construction: 322 (28 days of data) Avg. during construction: 404 (21 days of data) | |
| Le Sud-Ouest | Blocked | Autre | Jun 2, 2026 → Jun 26, 2026 15-60 days | ~1,024 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Entretien | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~3,144 m | Insufficient data | |
| Verdun | Blocked | Entretien | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~657 m | Insufficient data | |
| St-Laurent | Blocked | Entretien | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~1,354 m | Insufficient data Avg. before construction: 635 (26 days of data) | |
| Ville-Marie | Blocked | Entretien | Jun 15, 2026 → Jun 18, 2026 3-14 days | ~530 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Mar 22, 2026 → Oct 1, 2026 180+ days | ~92 m | +301.6% vs before Likely increase Avg. before construction: 215 (28 days of data) Avg. during construction: 865 (84 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,758 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,679 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | May 18, 2026 → Dec 18, 2026 180+ days | ~1,758 m | Insufficient data | |
| Montréal-Nord | Blocked | Construction/rénovation sans excavation | Jun 7, 2026 → Jun 16, 2026 3-14 days | ~1,528 m | +37.4% vs before Likely increase Avg. before construction: 366 (28 days of data) Avg. during construction: 503 (7 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Égouts et aqueducs - Excavation | Jun 15, 2026 → Jun 17, 2026 0-2 days | ~1,961 m | Insufficient data Avg. before construction: 465 (27 days of data) | |
| Montréal-Nord | Blocked | Construction/rénovation sans excavation | Jun 15, 2026 → Jun 19, 2026 3-14 days | ~1,544 m | Insufficient data Avg. before construction: 412 (27 days of data) | |
| Outremont | Blocked | Trottoirs - Construction | Jun 14, 2026 → Jun 26, 2026 3-14 days | ~629 m | Insufficient data Avg. before construction: 3,122 (28 days of data) | |
| Lachine | Blocked | Construction/rénovation avec excavation | Jun 1, 2026 → Jun 26, 2026 15-60 days | ~4,258 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Autre | Jun 14, 2026 → Jul 6, 2026 15-60 days | ~225 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation avec excavation | Jun 1, 2026 → Oct 1, 2026 61-180 days | ~170 m | +16.5% vs before Likely increase Avg. before construction: 1,676 (28 days of data) Avg. during construction: 1,953 (13 days of data) | |
| Anjou | Blocked | Autre | May 18, 2026 → Jun 16, 2026 15-60 days | ~3,191 m | +55% vs before Likely increase Avg. before construction: 419 (28 days of data) Avg. during construction: 650 (27 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Toiture - Rénovation | Jun 14, 2026 → Jun 16, 2026 0-2 days | ~369 m | Insufficient data Avg. before construction: 2,760 (28 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Entretien | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~258 m | Insufficient data | |
| Le Plateau-Mont-Royal | Blocked | Entretien | Jun 15, 2026 → Jun 17, 2026 0-2 days | ~133 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Autre | Jun 16, 2026 → Jun 18, 2026 0-2 days | ~1,185 m | Insufficient data Avg. before construction: 431 (26 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Excavation | Jun 7, 2026 → Aug 28, 2026 61-180 days | ~2,664 m | +26.2% vs before Likely increase Avg. before construction: 579 (28 days of data) Avg. during construction: 731 (7 days of data) | |
| Pierrefonds-Roxboro | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Jun 18, 2026 3-14 days | ~4,278 m | Insufficient data | |
| Outremont | Blocked | Trottoirs - Construction | Jun 14, 2026 → Jun 25, 2026 3-14 days | ~271 m | Insufficient data Avg. before construction: 3,122 (28 days of data) | |
| Ville-Marie | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux électriques, télécommunications ou câbles des distributions | Jun 14, 2026 → Jun 26, 2026 3-14 days | ~137 m | Insufficient data Avg. before construction: 2,626 (28 days of data) | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Autre | Jun 14, 2026 → Jul 6, 2026 15-60 days | ~328 m | Insufficient data Avg. before construction: 1,491 (28 days of data) | |
| St-Laurent | Blocked | Construction/rénovation sans excavation | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~1,504 m | Insufficient data Avg. before construction: 611 (27 days of data) | |
| Montréal-Nord | Blocked | Entretien | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~3,992 m | Insufficient data Avg. before construction: 414 (26 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Autre | May 10, 2026 → Jun 19, 2026 15-60 days | ~4,334 m | Insufficient data | |
| Montréal-Nord | Blocked | Autre | May 24, 2026 → Jun 25, 2026 15-60 days | ~3,382 m | +25.6% vs before Likely increase Avg. before construction: 322 (28 days of data) Avg. during construction: 404 (21 days of data) | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Construction/rénovation avec excavation | Jun 10, 2026 → Jul 10, 2026 15-60 days | ~3,305 m | Insufficient data Avg. before construction: 389 (28 days of data) Avg. during construction: 444 (4 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | Jun 7, 2026 → Jul 17, 2026 15-60 days | ~180 m | +19.8% vs before Likely increase Avg. before construction: 2,532 (28 days of data) Avg. during construction: 3,034 (7 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Autre | Jun 2, 2026 → Jul 17, 2026 15-60 days | ~581 m | +33.1% vs before Likely increase Avg. before construction: 1,826 (28 days of data) Avg. during construction: 2,431 (12 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation avec excavation | Jun 9, 2026 → Sep 9, 2026 61-180 days | ~1,575 m | Insufficient data | |
| St-Laurent | Blocked | Forage/excavation exploratoire | Jun 11, 2026 → Jun 16, 2026 3-14 days | ~1,347 m | Insufficient data Avg. before construction: 449 (28 days of data) Avg. during construction: 1,306 (3 days of data) | |
| Ahuntsic-Cartierville | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Jun 19, 2026 3-14 days | ~2,741 m | Insufficient data | |
| Rivière-des-Prairies-Pointe-aux-Trembles | Blocked | Trottoirs - Construction | Jun 14, 2026 → Jun 19, 2026 3-14 days | ~746 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Autre | Jun 14, 2026 → Jul 6, 2026 15-60 days | ~171 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Autre | Jun 14, 2026 → Jul 6, 2026 15-60 days | ~235 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Construction/rénovation sans excavation | Apr 23, 2026 → Oct 1, 2026 61-180 days | ~38 m | +179.8% vs before Likely increase Avg. before construction: 605 (28 days of data) Avg. during construction: 1,693 (52 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~243 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Toiture - Rénovation | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~34 m | Insufficient data Avg. before construction: 1,941 (27 days of data) | |
| Le Plateau-Mont-Royal | Blocked | Toiture - Rénovation | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~452 m | Insufficient data Avg. before construction: 1,266 (26 days of data) | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~243 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jun 17, 2026 → Jun 18, 2026 0-2 days | ~244 m | Insufficient data | |
| Ville-Marie | Blocked | Construction/rénovation avec excavation | Jun 18, 2026 → Jun 19, 2026 0-2 days | ~243 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 18, 2026 → Jun 22, 2026 3-14 days | ~2,104 m | Upcoming Construction hasn't started yet — impact data will appear once it begins. | |
| Ahuntsic-Cartierville | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 5, 2026 → Jul 17, 2026 61-180 days | ~1,798 m | Insufficient data | |
| Ahuntsic-Cartierville | Blocked | Réseaux routier - Réfection et travaux corrélatifs | May 5, 2026 → Jul 17, 2026 61-180 days | ~1,856 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,875 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Égouts et aqueducs - Excavation | Jun 14, 2026 → Dec 1, 2026 61-180 days | ~1,984 m | Insufficient data | |
| Montréal-Nord | Blocked | Entretien | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~4,164 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Égouts et aqueducs - Inspection et nettoyage | Jun 14, 2026 → Jun 18, 2026 3-14 days | ~1,196 m | Insufficient data Avg. before construction: 2,140 (28 days of data) | |
| Outremont | Blocked | Trottoirs - Construction | Jun 14, 2026 → Jun 25, 2026 3-14 days | ~690 m | Insufficient data Avg. before construction: 3,122 (28 days of data) | |
| Outremont | Blocked | Trottoirs - Construction | Jun 14, 2026 → Jun 26, 2026 3-14 days | ~775 m | Insufficient data Avg. before construction: 3,122 (28 days of data) | |
| Lachine | Blocked | Construction/rénovation sans excavation | Apr 19, 2026 → Jul 17, 2026 61-180 days | ~6,263 m | Insufficient data | |
| Outremont | Blocked | Construction/rénovation sans excavation | Mar 25, 2026 → Jul 18, 2026 61-180 days | ~1,189 m | +545.4% vs before Likely increase Avg. before construction: 311 (28 days of data) Avg. during construction: 2,007 (81 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Excavation | Jun 15, 2026 → Jun 16, 2026 0-2 days | ~369 m | Insufficient data Avg. before construction: 696 (27 days of data) | |
| St-Laurent | Blocked | Forage/excavation exploratoire | Jun 11, 2026 → Jun 16, 2026 3-14 days | ~1,386 m | Insufficient data Avg. before construction: 449 (28 days of data) Avg. during construction: 1,306 (3 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Blocked | Construction/rénovation sans excavation | Jun 16, 2026 → Jun 17, 2026 0-2 days | ~202 m | Insufficient data | |
| Le Sud-Ouest | Blocked | Construction/rénovation sans excavation | May 22, 2026 → Jun 19, 2026 15-60 days | ~1,123 m | Insufficient data | |
| Villeray-Saint-Michel-Parc-Extension | Blocked | Autre | Jun 14, 2026 → Jul 6, 2026 15-60 days | ~284 m | Insufficient data Avg. before construction: 1,491 (28 days of data) | |
| Ahuntsic-Cartierville | Blocked | Construction/rénovation avec excavation | Jun 7, 2026 → Jun 19, 2026 3-14 days | ~1,432 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Égouts et aqueducs - Réhabilitation | Jun 15, 2026 → Jun 22, 2026 3-14 days | ~1,474 m | Insufficient data Avg. before construction: 650 (27 days of data) | |
| Lachine | Blocked | Construction/rénovation avec excavation | Jun 1, 2026 → Jun 26, 2026 15-60 days | ~4,273 m | Insufficient data | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Entretien | May 28, 2026 → Jun 17, 2026 15-60 days | ~887 m | +43.6% vs before Likely increase Avg. before construction: 474 (28 days of data) Avg. during construction: 680 (17 days of data) | |
| Mercier-Hochelaga-Maisonneuve | Blocked | Construction/rénovation avec excavation | May 3, 2026 → Jun 27, 2026 15-60 days | ~1,446 m | +96.6% vs before Likely increase Avg. before construction: 290 (28 days of data) Avg. during construction: 571 (42 days of data) | |
| Le Sud-Ouest | Blocked | Construction/rénovation avec excavation | May 19, 2026 → Jun 19, 2026 15-60 days | ~924 m | Insufficient data | |
| Rosemont-La Petite-Patrie | Blocked | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | Jun 17, 2026 → Jun 25, 2026 3-14 days | ~350 m | Insufficient data Avg. before construction: 4,197 (25 days of data) |