Construction Impact
Active roadwork affecting bike paths and their impact on cycling volume.
Total Affected
5
Distinct construction zones impacting a bike path
Bike Paths Blocked
0
Fully closed to cyclists - requires detour
Bike Paths Obstructed
5
Partially obstructed - reduced width or shared lane
Active Bike Path Blockages(5)
Each row is an active road-work zone impacting a bike path. Click a street name to open an in-app map preview.
| Street | Borough | Status | Reason | Duration | Nearest Counter | Volume Impact |
|---|---|---|---|---|---|---|
| Ahuntsic-Cartierville | Obstructed | Construction/rénovation sans excavation | Feb 7, 2026 → Feb 20, 2026 3-14 days | ~1,097 m | -4.5% vs before Likely stable Avg. before construction: 59 (22 days of data) Avg. during construction: 57 (12 days of data) | |
| Le Plateau-Mont-Royal | Obstructed | Construction/rénovation avec excavation | Feb 11, 2026 → Feb 20, 2026 3-14 days | ~1,078 m | +30.9% vs before Likely increase Avg. before construction: 141 (22 days of data) Avg. during construction: 185 (8 days of data) | |
| Côte-des-Neiges-Notre-Dame-de-Grâce | Obstructed | Construction/rénovation sans excavation | Feb 8, 2026 → Feb 18, 2026 3-14 days | ~1,097 m | +22.5% vs before Likely increase Avg. before construction: 23 (22 days of data) Avg. during construction: 28 (11 days of data) | |
| Rosemont-La Petite-Patrie | Obstructed | S-2 Infrastructure souterraine mineure ou équipement hors-sol - Réseaux de gaz | Feb 16, 2026 → Feb 24, 2026 3-14 days | ~1,586 m | Insufficient data Avg. before construction: 625 (22 days of data) Avg. during construction: 648 (3 days of data) | |
| Le Sud-Ouest | Obstructed | Égouts et aqueducs - Inspection et nettoyage | Feb 16, 2026 → Feb 19, 2026 3-14 days | ~808 m | Insufficient data Avg. before construction: 19 (23 days of data) Avg. during construction: 15 (3 days of data) |